Text
Vr llNclPAL STAFF v s_ f@wi_L E3.LJicM
' O; pw STONE & WEBSTER MICHIGAN, INC.
- V tOI E.2) iw.L I
P.O. box 2325, BOSTON. M ASSACHUSETTS O2107
. il b-)---g, b
{
50a30 3
i mW<?
Mr. J.G. Keppler, Administrator, Region III June 17, 1983 Nuclear Regulatory Commission J.0. No.
14509 799 Roosevelt Road NRC File #83-06-17 Glen Ellyn, IL 60137
SUBJECT:
SPATIAL SYSTEMS INTERACTION PROGRAM (SSIP/S)
Subject program is the responsibility of CPCo and consultants Mark G. Jones Engineering Consultants Inc. (MGJEC).
CIO conducted an evaluation of (MGJEC) Training Program on June 8, 1983 and determined that the completion of the Training Program, and the preparation and issue of Walkdown Implementing procedures is satisfactory. CIO therefore considers that the subject program may be implemented immediately.
The Training Program consisted of 3 phases - (1) Classroom study and review of procedure (2) Simulated walkdown and (3) A written test. All candidates sucessfully completed the training.
In addition on June 8, 1983 CIO attended a presentation /
discussion of the policies and methods utilized in the SSIP/S.
Fifteen procedures have been approved by CPCo and issued by (MGJEC).
The checklist with supporting documentation is on file in this office.
Very truly yours, 6Atmod S.W. Baranow Program Manager SWB/ka cc: JJHarrison, NRC Glen Ellyn, IL RCook, NRC Midland (site)
DBMiller, CPCo Midland (site)
RBKelley, S&W APamaruso, S&W h