ML20072E990

From kanterella
Jump to navigation Jump to search
Forwrads Lers 83-025/03L-0 & 83-026/03L-0
ML20072E990
Person / Time
Site: Farley 
Issue date: 06/16/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20072E992 List:
References
NUDOCS 8306270229
Download: ML20072E990 (1)


Text

. + 14 piling Address

+ ", Alabama Power Company 600 North 18tn Street Post Offica Box 2641 l

Birmingham. Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

d'ac;0;;g"'

AlabamaPbwer the soahern et csystep June 16,M983 1;j l

=

3o El>

p m, Docket No. 348 E.

IdQ cp cu 2

o

'il. i l

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Reports Nos.

LER 83-025/03L-0 and LER 83-026/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written notification of the occurrences.

If you have any questions, please advise.

Yours very truly, OL.Clayto ; d r./

FLCJ r/KWM:nac I

Cnclosures i

i xc: Director, IE (30 copies) l Director, MIPC (3 copies)

I l

1 8306270229 830616 PDR ADDCK 05000348 l

S PDR Y

CFFICIAL COP 1

$6 A 1 \\

.