Second Interim Deficiency Rept Re American Bridge Reactor Auxiliary & Fuel Handling Bldg Bolting & Welding. Significant Const Deficiency Scd 73 Combined W/Scd 78,Reinsp Will Be Completed on 830815,w/rept by 830831
ML20072E944
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/15/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0196, W3I83-196, NUDOCS 8306270213
Download: ML20072E944 (1)


Text

I OUISIANA 24a OnanoNOe sincer P O W E R & L I G H T! P O BOX 6000

  • 1503) 366-234"70174

'$uSNI<sY$

u June 15, 1983 W3I83-0196 Q-3-A35.07.78 Mr. John T. Collins, Regional Administrator, Region IV hf I /lT lh U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 ( JUN 2 01983

~

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 78 "American Bridge RAB, FHB Bolting and Welding Deficiencies" Second Interim Report

REFERENCE:

LP&L letter W3183-0144 dated April 28, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than June 30, 1983.

At the present time, 100% reinspection is scheduled for all American Bridge work pertaining to SCD 78 and SCD 73, "American Bridge RCB Structural Steel Welding Deficiencies". Due to the similarity and fact that these deficiencies pertain to one contractor's work (i.e. , American Bridge), it has been de-cided to combine SCD 73 into SCD 78. Therefore, SCD 73 is closed and this response should be considered as the linal Report. In addition, the new title will be "American Bridge Structural Steel Deficiencies" which hereafter will be referred to as SCD 78. This combined reinspection and rework is scheduled for completion on August 15, 1983.

Therefore, a Final Report will be submitted to the NRC by August 31, 1983.

Very truly yours, m me F. J. Drummond Project Support Manager - Nuclear FJD/RWP/ MAL:keh cc: 1) Director 2) Director Office of Inspection & Enforcement Office of Management U. S. Nuclear Regulatory Commission Information and Program Control Washington, D. C. 20555 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

3) Mr. E. L. Blake 4) Mr. W. M. Stevenson 8306270213 830615 -

bb- 27 gDRADOCK 05000382

. _ _ _ - $