ML20072E932

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Vogtle Electric Generating Plant Unit 2, Cycle 4,Core Operating Limits Rept
ML20072E932
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/12/1994
From: Mcccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072E935 List:
References
LCV-0439, LCV-439, NUDOCS 9408230146
Download: ML20072E932 (2)


Text

_. _..

Georga PcrAer Cortrany 40 inv@nen Conter Py*way

  • a
  • Post OMee Gox 1295 B rm;ngnam. Alabama 35201 Telephone 205 B77 7122 m

Georgia Power C. K. McCoy e,

t the scorMm e4rtic sprem August 12, 1994 LCV-0439 Docket No. 50-425.

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT CORE OPERATING LIMITS REPORT in accordance with Technical Specification 6.8.1.6, Georgia Power Company hereby submits the enclosed revision to figures 6,7, and 8 of the Core Operating Limits Report (COLR) for Vogtle Electric Generating Plant - Unit 2 Cycle 4.

Please contact this oflice ifyou have any questions.

Sincerely,

. #/ '

C. K. hicCoy CKM/IIWM/gmb.

Enclosure 2

cc: Georgia Power Company Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuc[gr Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D, S. Ilood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident inspector, Vogtle 1.00101 (4,

0 9400230146 940E112 9

5 i

ADOCK 0500 gDR

'Y

\\'

Vogtle Electric Generating Plant Unit I and Unit 2 O

Active Core Operating Limits Report List August 1994 Unit 1 Cycle 5, Revision 1 September 1993 Unit 2 Cycle 4, Revision 1 August 1994 O

i O

l l

ht\\=9\\vogtle\\ COLA.all L

)