Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 ML20199B6301997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H5991997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216H6071997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Vogtle Electric Generating Plant ML20210K5081997-07-31031 July 1997 Monthly Operating Repts for July 1997 for VEGP ML20140D7301997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Vogtle Electric Generating Plant ML20141D8531997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20137T6191997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Vogtle Electric Generating Plant ML20136G3471997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20134H3481997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20133F6551996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Vogtle Electric Generating Plant,Unit 1 & 2 ML20132B9671996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20134K7361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20128N1541996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20117N1731996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20116J3461996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20115E9821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Vogtle Electric Generating Plant ML20112H6411996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20111B2461996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20101R0251996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Vogtle Electric Generating Plant ML20100R2701996-02-29029 February 1996 Monthly Operating Repts for Feb 1995 for Vogtle Electric Generating Plant ML20100F2071996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20096C3051995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Vogtle Electric Generating Plant,Units 1 & 2 ML20095E0201995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Vogtle Electric Generating Plant ML20094J0741995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Vogtle Electric Generating Plant Units 1 & 2 ML20093F5031995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Vogtle Electric Generating Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20196E5221998-12-0101 December 1998 Rev 8 to ISI-P-014, ISI Program for VEGP-2 ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20236Q3051998-06-30030 June 1998 Owner'S Rept for ISI for Sixth Maint/Refueling Outage of Vogtle Electric Generating Plant,Unit 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20154Q9721998-04-20020 April 1998 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H7181998-04-0101 April 1998 Corrected Page 5 to 980324 SER Re Relief Requests Associated W/Second 10-year Interval Insp program.RR-21 in Error in That Component,Suction Damper Inadvertently Omitted. Corrected Page 7 of Technical Ltr Rept Also Encl ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217Q1301998-03-31031 March 1998 Rev 0 to Vepc Unit 2 Cycle 7,COLR ML20217B8831998-03-24024 March 1998 SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H9551998-02-23023 February 1998 SER Denying Quality Assurance Program Description Change for Vogtle Electric Generating Plant,Units 1 & 2 ML20203E4831998-02-11011 February 1998 Rev 1 to Vogtle Electric Generating Plant,Units 1 & 2 Second Ten-Yr Interval Pump Inservice Test Program ML20198T1211998-01-31031 January 1998 Owners Rept for Inservice Inspection for Seventh Maintenance/Refueling Outage ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20199E5431998-01-31031 January 1998 Rev 3 to WCAP-14720, Vogtle Units 1 & 2 Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203C2811997-12-0909 December 1997 Safety Evaluation Authorizing Request for Relief of Second 10 Yr Interval Inservice Insp Program ML20202B7881997-12-0101 December 1997 Rev 8 to ISI-P-006, ISI Program for Gpc Vogtle Electric Generating Plant Unit 1 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 1999-09-30
[Table view] |
Text
_m -. _ .__ . _ _ . _ . . . . _ . . _.
. . Georg<a Power Cc.nmny 40 inverness Conter Parkwat
. Post 0"ce Bo< 12%
, &cmentam A!atwna 35201 Te4epnope 205 877 7122 m
C, K. McCoy Georgia Power Vce Pres dent No'fe.r t/o(pe PrOfRI t' bOUI OIO I IIIIC SfblO#II August 12, 1994 LCV-0360-D Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the July 1994, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.
Sincerely, C. K. McCoy CKM/JLL Enclosures cc: Georgia Power Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission i
Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior . Resident Inspector, Vogtle
'00099 ,
-9408220087 940731 PDR ADOCK 05000424 -!
R PDR !
. . 8 ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR JULY 1994 TABLE OF CONTENTS l NAR.RATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page Vl-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 i
-j
t NARRATIVE REPORT DOCKET NO. 50424 UNIT 1 DATE: AUGUST 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104
'l JULY 01 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
JULY 31 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
i
'l 4
1 1
I f
l V1-1
l a ,
OPERATING DATA REPORT DOCKET NO. 50-424 DATE: AUGUST 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 j OPERATING STATUS
- 1. UNIT NAME: VEGP UNIT 1
- 2. REPORT PERIOD: JULY 1994 {
- 3. LICENSED THERMAL POWER (MWt): 3565 :
- 4. NAMEPLATE RATING (GROSS MWe): 1215 l 1169 ;
- 5. DESIGN ELECTRICAL RATING (NET MWe):
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1223 l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1169 I
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY: NA THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744 5087 62832 12 NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 5047.6 54922.7 !
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE: 744.0 5038.0 53910.9
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 16 GROSS THERMAL ENERGY GENERATED (MWH): 2646904 17697412 181418610
- 17. GROSS ELEC. ENERGY GENERATED (MWH): 896658 6058089 61041051 1
- 18. NET ELEC. ENERGY GENERATED (MWH): 857528 5791599 58032891
- 19. REACTOR SERVICE FACTOR 100.0 % 99.2 % 87.4 % l
- 20. REACTOR AVAILABILITY FACTOR 100.0 % 99.2 % 87.4 %
- 21. UNIT SERVICE FACTOR: 100.0 % 99.0 % 85.8%
- 22. UNIT AVAILABILITY FACTOR: 100.0 % 99.0 % 85.8 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET): 98.6% 97.5% 83.8 %
- 24. UNIT CAPACITY FACTOR (USING DER NET): 98.6 % 97.4 % 83.1 %
- 25. UNIT FORCED OUTAGE RATE: 0.0% 1.0% 5.1%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REFUELING, SEPT. 11,1994,31 DAYS 27, IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA I
V12
i l
. UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE: AUGUST 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 l
DAY Net MW
- 1. . 1156
- 2. 1153
- 3. 1155
- 4. 1153
- 5. 1150
- 6. 1153
- 7. 1153
- 8. 1151
- 9. 1151
- 10. 1152 11 . . . 1152
- 12. 1153
- 13. 1154 14 ... . 1152
- 15. 1149
- 16. 1148
- 17. . 1148
- 18. . 1152 19 . . 1153 20 .. 1154
- 21. 1154
- 22. .. 1155
- 23. .. 1152 24 . . 1153
- 25. . 1150
- 26. 1154
- 27. . 1154
- 28. . 1153
- 29. . 1154 ,
- 30. . 1157
- 31. 1154 V1-3 l
l l
1 I
l 4
. , l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50424 DATE: AUGUST 1,1994 UNIT NAME: VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 i
REPORT MONTH JULY 1994 R M S E E Y-T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA I
L-F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
V1-4 1
i
_ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _-._-.____._d
r.
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPGRT FOR JULY 1994 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4 I
)
l
l NARRATIVE REPORT DOCKET NO. 50-425
. UNIT 2 DATE: AUGUST '1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 JULY 01 00:00 UNIT 2 AT 100% POWER, WITH NO OPERATIONAL PROBLEMS.
JULY 23 09:20 UNIT 2 BEGAN POWER REDUCTION TO REPAIR LEAKING VALVE.
JULY 23 16:05 UNIT 2 MAIN TURBINE MANUALLY TRIPPED.
JULY 23 16:11 UNIT 2 ENTERED MODE 2.
JULY 23 16:29 UNIT 2 ENTERED MODE 3.
JULY 24 00:19 UNIT 2 ENTERED MODE 4.
JULY 24 04:19 UNIT 2 ENTERED MODE 5.
JULY 28 02:21 UNIT 2 BEGAN HEATUP IN PREPARATION FOR PLANT STARTUP.
JULY 28 10:35 UNIT 2 HEATUP SUSPENDED DUE TO RHR PUMP SEAL LEAKAGE.
JULY 31 23:59 UNIT 2 IN MODE 5, RHR PUMP REPAIRS IN PROGRESS.
l l
i
[
i V2-1
l 1
. j 1
OPERATING DATA REPORT DOCKET NO. 50-425 DATE: AUGUST 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 OPERATING STATUS
- 1. UNIT NAME: VEGP UNIT 2
- 2. REPORT PERIOD: JULY 1994
- 3. LICENSED THERMAL POWER (MWt): 3565
- 4. NAMEPLATE RATING (GROSS MWe): 1215
- 5. DESIGN ELECTRICAL RATING (NET MWe): 1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1223
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1169
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY: NA THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744 5087 45576
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 544.5 4506.2 40546.6
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE: 544.1 4470.8 39997.2
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH): 1926053 15706536 132786034
- 17. GROSS ELEC. ENERGY GENERATED (MWH): 653100 5382470 45064507
- 18. NET ELEC. ENERGY GENERATED (MWH): 619710 5134140 42881617 !
- 19. REACTOR SERVICE FACTOR 73.2 % 88.6 % 89.0 %
- 20. REACTOR AVAILABILITY FACTOR 73.2 % 88.6 % 89.0 % ,
- 21. UNIT SERVICE FACTOR: 73.1 % 87.9 % 87.8 %
- 22. UNIT AVAILABILITY FACTOR: 73.1 % 87.9 % 87.8 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET): 71.3 % 86.4 % 84.3 % ;
- 24. UNIT CAPACITY FACTOR (USING DER NET): 71.3 % 86.3 % 84.4 % ;
- 25. UNIT FORCED OUTAGE RATE: 26.9 % 6.9% 2.2%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE l
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP : 08/03/94 V2-2 i
1
. ' UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE: AUGUST 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 DAY Net MW
- 1. 1160
- 2. 1157
- 3. 1160
- 4. 1161
- 5. . . 1162
- 6. 1164
- 7. 1162 8.. 1160 9 .. 1158
- 10. 1159
- 11. . 1156
- 12. 1156
- 13. 1158 14 . . 1155
- 15. . 1155
- 16. 1150
- 17. .. 1153
- 18. 1158 19 .. . 1161
- 20. . 1160
- 21. . 1161
- 22. 1162 j
- 23. 538 -
- 24. . 0
- 25. . . 0
- 26. 0
- 27. . . . . 0
- 28. 0
- 29. 0
- 30. 0
- 31. . O V2-3
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE: AUGUST 1,1994 UNIT NAME: VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 REPORT MONTH JULY 1994 R M S E E Y T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE 94-6 7/23 F 199.9 8 1 2-92-05 AB V SEE BELOW F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
EVENT 94-6 CAUSE: UNIT 2 CONTROLLED SHUTDOWN TO REPAIR LEAK ON THE RCS LOOP 3 INTERMEDIATE LEG DRAIN LINE ISOLATION VALVE.
CORRECTIVE ACTION: INVESTIGATION DETERMINED THAT THE LEAK WAS FROM A CRACKED SOCKET WELD AT THE VALVE. THE CRACKED WELD WAS REWORKED AND THE UNIT BEGAN POWER ASCENSION.
DURING HEATUP EXCESSIVE SEAL LEAKAGE WAS DISCOVERED ON THE "A" TRAIN RHR PUMP. THE RHR PUMP IS BEING REPAIRED.
V2-4
ENCLOSUllE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 l
CIIALLENGES TO PORY OR SAFETY VALVES 1
I DOCKET NOS. 50-424,50-425 DATE: AUGUST 1,1994 )
COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104
.. r---
EVENT DATE TAG NO. TYPE DESCRIPTION
- . . . - _ . _ . . . - . _ 4._....-.,
NA NA NA NA 1