ML20072E034

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Chilled Water Piping Supports. Two Hangers Remain to Be Reworked in Chilled Water Sys But Cannot Be Reworked at Present Time Due to Preoperational Testing.Final Rept Due on 830510
ML20072E034
Person / Time
Site: Waterford 
Issue date: 03/07/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0071, W3I83-71, NUDOCS 8303210556
Download: ML20072E034 (1)


Text

?-

r d

Lo uisiam A,

,4, OuAeONO, s1e<<1 POWER & LIGHT / P O BOX 6008. NEW OALEANS. LOUIStANA 70174. (504) 366-2345 NONcvsi$

8 March 7, 1983

t. v uA vain Voce Presnient Nuclear Operatons W3I83-0071 Q-3-A35.07.33 Mr. John T. Collins, Regional Administrator

~ ~- ~ ~ ]!j i U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 1000 Of l

Ql lg p

l Arlington, Texas 76012 l ', ' i 1j

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 33

" Chilled Water Piping Supports"

REFERENCE:

LP&L letter W3182-0058 dated October 1, 1982

Dear Mr. Collins:

Two hangers remain to be reworked in the Chilled Water System to complete the corrective action. Ilowever, these hangers cannot be reworked at this time because they are in a controlled access area due to pre-operational testing. A final report will therefore be delayed until May 10, 1983.

If you have any questions, please advise.

Very truly yours, kWer T

L. V. Maurin LVM/ MAL:keh cc:

1) Director 3)

E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555

)

,s

/

830321o$$$ g3939, DR ADOCK 05000382

[

g PDR