ML20072D888

From kanterella
Jump to navigation Jump to search
Forwards LERs 83-009/03L-0,83-010/03L-0 & 83-012/03L-0. W/O LERs 83-010/03L-0 & 83-012/03L-0
ML20072D888
Person / Time
Site: Farley 
Issue date: 03/11/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20072D890 List:
References
NUDOCS 8303210460
Download: ML20072D888 (1)


Text

W Address Alabama Power Company 800 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 y

Telephone 206 783-6061 usi u.c w.

%.ac mm,.,'[,

NabamaFower R { p 1*t "'

ncr, sic the southem electnc system 03 IUR 16 Alf ; 5g March 11, 1983 Docket No. 364 U. S. Nuclear Regulatory Comraission Office of-Inspection and Enforcement i

Region II l

101 Marietta Street, N.W.

l Suite 3100~

Atlanta, Georgia 30303 j,

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 2, Licensee Event Reports Nos. LER-83-009/03L-0, LER 83-010/03L-0 and LER 83-012/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specifica-tion 6.9.1.13 to provide thirty (30) days written notification of the l

occurrence.

l l

If you have any questions, please advise.

Yours very truly, CLL b

F. L. Clayton, Jr.

FLCJr/KWM:nac Enclosures xc: Director, IE (30 copies Director, MIPC (3 copies r303210460 830311

~

PDR ADOCK 05000364 g

PDR 9.C%

i OVN,3 TF R L