Monthly Operating Rept for Jul 1994 for Waterford 3
ML20072D750
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/31/1994
From: Becker T, Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-94-0144, W3F1-94-144, NUDOCS 9408190228
Download: ML20072D750 (7)


Text

,, .

',

  • 4 e=~

ENTERGY I"Ti """ " '"*'

Ke ra L A 7008 In 504 739 0774

_ _ _ . _ , . _ . _ _ ~ ~ _ _ - . . __ __,

R. F. Durski r w rr f t .1 4. p 9Fi ty Va:l!E:t h 's l 3 W3F1-94-0144 A4.05 PR I

August 12, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of July, 1994. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Subsequent to submitting the Monthly Operating Report for June, 1994, it was noted that we inadvertently made a mistake in the reporting of a unit shutdown time duration. This affected three items in the report. The following corrections are provided:

l i

L 1COCN 9408190228 94o731 DR ADOCK 0500 2 ggg a l}A

l

, s j Monthly Operating Report W3F1-94-0144 i Page 2 l August 12, 1994 This Month YR To Date Cumulative Unit Forced Outage Rate 1.6 1.0 3.4 Unit Forced Outage Hours 11.2 31.5 2210.2 I

UNIT SHUTDOWNS AND POWER REDUCTIONS # Duration (hrs.)

94-03 11.2 Very truly yours, y

R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc: L.J. Callan (NRC Region IV)

R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident Inspectors Office 1

l l

l l

. .- , .l

1 1

1

- i l

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 JULY 1994 The unit operated at an average reactor power of 99.9% and experienced no shutdowns or significant power reductions during the period.

l 1

l

.=

I PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of July 1994, there were no pressurizer safety valve failures or challenges.

1

OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 1 DATE OF REPORT: AUGUST,1994 I COMPLETED BY: T.S. BECKER TELEPHONE: 504-739-6683 i OPERATING STATUS

1. Reporting Period: July,1994 Gross Hours in Reporting Period: 744
2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104
3. Power Level to which Restricted (if any) (Net MWe): N/A
4. Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor was Critical 744.0 3,949.8 65,049.8
6. Reactor Reserve Shutdown Hours -0
7. Hours Generator was On-line 744.0 3,883.1 64,171.3
8. Unit Reserve Shutdown Hours 0- -0
9. Gross Thermal Energy Generated (MWH) 2,518,426 12,882,715 211,911,192
10. Gross Electrical Energy Generated (MWH) 826,420 4,219,910 70,640,690
11. Net Electrical Energy Generated (MWH) 788,723 4,014,761 67,325,206
12. Reactor Service Factor 100.0 77.6 83.8
13. Reactor Availability Factor 100.0 77.6 83.8
14. Unit Service Factor 100.0 78.3 82.7
15. Unit Availability Factor 100.0 76.3 82.7 l
16. Unit Capacity Factor (using MDC) 98.6 73.4 80.7
17. Unit Capacity Factor (Using DER) 96.0 71.5 _

78.6 j

18. Unit Forced Outage Rate 0.0 0.8 3.3

. - . ~ . . - .. - __ - - - . . - - - . . ~ . .- , _

l OPERATING DATA REPORT 1

  • DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: AUGUST,1994 COMPLETED Bi: T.S. BECKER TELEPHONE: 504-739-8683 OPERATING DATA REPORT (Con 1)
19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):

N/A l

20. If Shutdown at end of report period, estimated date of startup:
21. Unit in Commercial Operation l THIS MONTH YR TO DATE CUMULATIVE
22. Hours in Reporting Period 744.0 5,087.0 77,592.0
23. Unit Forced Outage Hours 0.0 31.5 2,210.2 l
24. Nameplate Rating (Gross MWe): 1200

)

25. If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, i Give Reasons: N/A I

1

i l

. j AVERAGE DAILY UNIT POWER LEVEL ,

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: AUGUST,1994 COMPLETED BY: T.S. BECKER TELEPHONE: 504 739-6683 MONTH JULY.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWe-NET) 1 1062 17 1063 .

2 1062 18 1063 3 1062 19 1062 4 1062 20 1061 5 1062 21 1061 6 1062 22 1061 7 1062 23 1060 8 1060 24 1061 9 1062 25 1059 10 1063 26 1059 11 1064 27 1058 12 1064 28 1058 13 1028 29 1058 ,

14 1063 30 1058 )

1063 15 31 1058 16 1063 INSTRUCTIONS On tMa torrnat, list the average daily unit power level in MWe-Net for each day in the re~ porting month, wor 1pute to the nearest whole megawatt.

l I

i

UNIT SHUTDOWNS AND POWER REDUCTIONS . .

DOCKET NUMBER: 50-382 +

UNIT NAME- WATERFORD 3 -

DATE OF REPORT: AUGUST 1994 COMPLETED BY: T.S. BECKER I

REPORT FOR JULY.1994

!- Type Method of Shutting F = Forced Duration Down the Reactor or Cause, Comments and

, Number Date S = Scheduled (Hours) Reason (1) Reducino Power (2) Corrective Actions NONE l

(1) REASON (2) METHOD A= Equipment Failure (explain) 1= Manual B= Maintenance or Test 2= Manual Scram C= Refueling 3= Automatic Scram

.D= Regulatory Regriction 4= Continuation from Previous Period E= Operator Training and 5= . Power Reduction License Examination ' 6= Other(explain)

F= Administrative G= Operational Error (explain)

H= Other(explain)