Interim Deficiency Rept Re Adequacy of Shear Reinforcements at Major Containment penetrations.As-designed & as-built Containment Satisfactory.Revs to FSAR Initiated.Final or Interim Rept Expected by 831031
ML20072C951
Person / Time
Site: Midland
Issue date: 06/13/1983
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 22234, 81-05, 81-5, NUDOCS 8306210302
Download: ML20072C951 (2)


Text

7-.

V Consumem-Power James W Cook O

hf Vice President - Projects, Engineering and Construction General Offices: 1945 West Parnail Road, Jackson, MI 49201 e (517) 788-0453 June 13, 1983 81-05 #9 Mr J G Kcppler, Regional Administrator US Nuclear Regulatory Commission.

Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR C0 GENERATION PLANT DOCKET NOS 50-329 AND 50-330 SHEAR REINFORCEMENT AT MAJOR CONTAINMENT PENETRATIONS FILE:

0.4.9.53 SERIAL:

22234

References:

J W Cook letters to J G Keppler, Same

Subject:

t (1) Serial 11993, dated May 15, 1981 (2) Serial 12066, dated July 31, 1981 (3) Serial 14635, dated December 14, 1981 (4) Serial 16126, dated March 12, 1982 (5) Serial 17511, dated June 4, 1982 (6) Serial 17598, dated August 31, 1982 (7) Serial 19119, dated December 17, 1982 (8) Serial 20730, dated March 18, 1983 This letter, as were the referenced letters, is an interim 50.55(e) report concerning the adequacy of shear reinforcements at major containment penetrations.

As discussed in the previous report, the as-designed and as-built containment was found to be satisfactory.

Bechtel is continuing the finalization of design calculations and the verification of reinforcement adjacent to the penetration areas. Revisions to the FSAR, including Subsecti,ons 3.8.1.4.7 and 3.8.1.5.1.5, have been initiated.

Consumers Power will send either the final report or another interim report addressing the above issue by October 31, 1983.

8306210302 830613 l

h, gDRADOCK 0500032 JWC/WRB/cd JUN 161983 OC0683-0015A-MP01 Xbc._,f 9

o-s' r 2

Serial 22234 81-05 #9 CCi Document Control Desk, NRC Washington, DC RJCook, NRC Resident Inspector Midland Nuclear Plant CBechhoefer, ASLB Panel FPCowan, ASLB Panel JHarbour, ASLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CRStephens, USNRC WDPaton, Esq USNRC FJKelley, Esq, Attorney General SKFreeman, Esq, Asst Attorney General WHMarshall GJMerritt, Esq, TNK&J INPO Records Center l

l l

l l

i OC0683-0015A-MP01 7

1

.