Interim Deficiency Rept Re Item M-67 on Lack of Procedural Qualification for Pipe Bends.Initially Reported on 821109. Appeal to Region III Sought for Permission to Perform Requalification of Small Bore Pipe Bending Operations
ML20072C432
Person / Time
Site: Zimmer
Issue date: 02/23/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2270, NUDOCS 8303080431
Download: ML20072C432 (2)


Text

. _ _.~.___ _.

e=+M---==

THE CINCINNATI GAS & ELECTRIC COMPANY sg- "

CIN CINN ATi, OHIO 452ol February 23, 1983 QA-2270 E. A. BORGMANN SENaOR VICE PRESsDENT U. S. Nuclear Regulatory Commission Re91on III 799 Roosevelt Road Glen Ellyn, IL 60137 Attention:

Mr. J. G. Keppler Regional Administrator M:

WM. H. ZIl@IER NUCLEAR POWER STATION UNIT 1 10CFR50.55(c) ITEM M-67 LACK OF PROCEDURAL OUALIFICATION FOP. PIPE BENDS, DOCKET NO.

50-358, CONSTRUCTION PERMIT NO. CPPR-88 W.O. #57300, JQE E-5590, FILE NO. NRC-8, M-67 Gentlemen:

This letter constitutes an interim report concerning the subject condition, initially reported to the Commission on November 9, 1982 as a potentially reportable deficiency under 10CFR50.55(e).

Our previous report, QA-2250, dated February 4, 1983, stated that requalification of small bore pipe bending operations would be conducted by February 28, 1983. This effort required the ware-house to issue several pieces of essential pipe. CG&E requested permission to perform this activity from the NRC site representatives through Construction Work Authorization Request (CWAR) #71; however, this request was turned down.

LG&E is presently seeking an appeal to Region III.

It is not possible to predict, if or when, this request will eventually be approved. A follow-up report will be submitted by May 31, 1983.

M !a h o!00b 7

s MAR 2 083

Mr. J. G. Keppler Regional Administrator Region III February 23, 1983 QA-2270 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY s

y~-

E. A. BORGMANN SENIOR VICE PRESIDENT FKP:plc cc: NRC Office of Inspection & Enforcement Washington, J.C.

20555 NRC Senior Resident Inspector Attn:

W. F. Chrisianson Zimmer Project Inspector Region III r