ML20072C289
| ML20072C289 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 06/08/1983 |
| From: | Brey H PUBLIC SERVICE CO. OF COLORADO |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| P-83206, NUDOCS 8306210011 | |
| Download: ML20072C289 (2) | |
Text
M
- a'
~ '
W00 $
public Service Company f Onkude C
2420 W. 26th Avenue, Suite 1000 Denver, Colorado 80211 O
June 8, 1983 Fort St. Vrain Unit No. 1 P-83206 DGB*Nii ih; Mr. John T. Collins, Regional Administrator Region IV jv1
} *{ @ 'j Nuclear Regulatory Commission 1
611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 DOCKET N0. 50-267
SUBJECT:
Open Item (267/7815-01)
REFERENCES:
- 1) NRC letter G-78105; G.L. Madsen to C.K. Millen dated 11/8/78
- 2) NRC letter G-83205; G.L. Madsen to 0.R. Lee, dated 5/23/83
Dear Mr. Collins:
Open Item (267/7815-01) initially reported in IE Inspection Report
~
50-267/78-15 Reference (1), was reidentified as being unresolved in IE Inspection Report 50-267/83-06, Reference (2), pending:
1.
Analysis of the radiological hazards involved in using the reactor building sump as a part of the radwaste system.
2.
Provide for proper monitoring of the effluent released from j
the sump which includes the collection of representative effluent samples.
3.
Revision to the FSV FSAR by July 1,1983, to include the reactor building sump as a part of the radwaste system.
The purpose of this letter is to clarify PSC's proposed resolution to item 3.
PSC intends to include the FSAR revision required to resolve item 3 in the next scheduled FSAR updata, which is scheduled to be l
8306210011 830600 PDR ADDCK 05000267 G
=.
3 th s
+
F,;, -
P-83206,,s J
s Paga 2 y.
s i
-s
,, y...
Y, v*,
'A -
submitted to the'haC,.per +10CFR50.-71(c), by July 22, 1983.
PSC A
requests that the commitment date for ite&3 le changed from July 1 to refl e'ct'~~
r3q'uired annual FSAR Update
'('
'to August 1,
- 1983, PSCwillproc$e submittal deadline.
eed under this FSAR Update schedule
\\l,. for item 3 above, along with the entire annual FSV FSAR Update,
\\)N unless you specify otherwise.
, ~
C
~Q< 7 s.
, j. Very truly youri.
'.T.,_
n
.s,
3,t-s
., q
, y'
- i,
%y W-Q
. : ~,
h u
i
\\'
t w
i.S
' t Nuclear Engineering Division H. L. Brey, Managee s
,i -
.i s
,s s
4 s_
'a HLB /MAJ:.p.a
\\'
\\
I gg N
j }'
. q g
m:
\\
s g
I f'
g g
g
-m s
s g-
- k, w
h.-
-)
f.;
\\~
k t.
14g
\\1 I
~
2, g
s t
si ga
'\\.,,
s 4
I N.
- \\
3
(\\-
3
\\
g s
4P
%et s,
1
"\\
\\
g m
}
~
\\
a w%
9 p.
e s
1 g
1 4
yt S-6 g
., i s
1
% g.
E 4