Clarifies Proposed Solution to Open Item 3 Re Radwaste Sys Identified in IE Insp Repts 50-267/78-15 & 50-267/83-06. Resolution Will Be Included in Next FSAR Rev,Scheduled for 830722
ML20072C289
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/08/1983
From: Brey H
PUBLIC SERVICE CO. OF COLORADO
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-83206, NUDOCS 8306210011
Download: ML20072C289 (2)


Text

M

- a'

~ '

W00 $

public Service Company f Onkude C

2420 W. 26th Avenue, Suite 1000 Denver, Colorado 80211 O

June 8, 1983 Fort St. Vrain Unit No. 1 P-83206 DGB*Nii ih; Mr. John T. Collins, Regional Administrator Region IV jv1

} *{ @ 'j Nuclear Regulatory Commission 1

611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 DOCKET N0. 50-267

SUBJECT:

Open Item (267/7815-01)

REFERENCES:

1) NRC letter G-78105; G.L. Madsen to C.K. Millen dated 11/8/78
2) NRC letter G-83205; G.L. Madsen to 0.R. Lee, dated 5/23/83

Dear Mr. Collins:

Open Item (267/7815-01) initially reported in IE Inspection Report

~

50-267/78-15 Reference (1), was reidentified as being unresolved in IE Inspection Report 50-267/83-06, Reference (2), pending:

1.

Analysis of the radiological hazards involved in using the reactor building sump as a part of the radwaste system.

2.

Provide for proper monitoring of the effluent released from j

the sump which includes the collection of representative effluent samples.

3.

Revision to the FSV FSAR by July 1,1983, to include the reactor building sump as a part of the radwaste system.

The purpose of this letter is to clarify PSC's proposed resolution to item 3.

PSC intends to include the FSAR revision required to resolve item 3 in the next scheduled FSAR updata, which is scheduled to be l

8306210011 830600 PDR ADDCK 05000267 G

PDR

=.

3 th s

+

F,;, -

P-83206,,s J

s Paga 2 y.

s i

-s

,, y...

Y, v*,

'A -

submitted to the'haC,.per +10CFR50.-71(c), by July 22, 1983.

PSC A

requests that the commitment date for ite&3 le changed from July 1 to refl e'ct'~~

r3q'uired annual FSAR Update

'('

'to August 1,

1983, PSCwillproc$e submittal deadline.

eed under this FSAR Update schedule

\\l,. for item 3 above, along with the entire annual FSV FSAR Update,

\\)N unless you specify otherwise.

, ~

C

~Q< 7 s.

, j. Very truly youri.

'.T.,_

n

.s,

3,t-s

., q

, y'

  • i,

%y W-Q

. : ~,

h u

i

\\'

t w

i.S

' t Nuclear Engineering Division H. L. Brey, Managee s

,i -

.i s

,s s

4 s_

'a HLB /MAJ:.p.a

\\'

\\

I gg N

j }'

. q g

m:

\\

s g

I f'

g g

g

-m s

s g-

  • k, w

h.-

-)

f.;

\\~

k t.

14g

\\1 I

~

2, g

s t

si ga

'\\.,,

s 4

I N.

  • \\

3

(\\-

3

\\

g s

4P

%et s,

1

"\\

\\

g m

}

~

\\

a w%

9 p.

e s

1 g

1 4

yt S-6 g

., i s

1

% g.

E 4