ML20072B921
ML20072B921 | |
Person / Time | |
---|---|
Site: | 05000142 |
Issue date: | 03/01/1983 |
From: | Hirsch D COMMITTEE TO BRIDGE THE GAP |
To: | Cormier W CALIFORNIA, UNIV. OF, LOS ANGELES, CA |
References | |
NUDOCS 8303080044 | |
Download: ML20072B921 (2) | |
Similar Documents at 05000142 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20080G1431995-01-24024 January 1995
[Table view]Inquires About Reason for Puzzling Delay Concerning Patient Discharge Rule ML20080G1591995-01-10010 January 1995 Ack Receipt of ,Which Answered 941130 & 1212 Ltrs to Chairman.Informs That Ltr Entirely Unsatisfactory ML20057E2811993-09-17017 September 1993 Provides Correction to Second Paragraph of Page 1 of Final Rept of Confirmatory Survey of Boelter Reactor Facility for UCLA in Los Angeles,Ca ML20057C1001993-09-0909 September 1993 Forwards Final Rept of Confirmatory Survey of Boelter Reactor Facility,Univ of California,Los Angeles,Ca IR 05000142/19930011993-09-0303 September 1993 Forwards Orise Rept Also Being Identified as NRC Insp Rept 50-142/93-01.Areas Surveyed Appear to Meet Criteria of Reg Guide 1.86, Termination of OLs for Operating Reactors ML20057C5081993-08-24024 August 1993 Forwards Advance Copy of Final Rept of Confirmatory Survey of Boelter Reactor Facility,Univ of Ca. Bound Final Copies Will Be Mailed in Approx Two Wks ML20116L5461993-02-22022 February 1993 Forwards Response to Comments from NRC & Oak Ridge Inst Re Review of UCLA Rept, Final Decommissioning for Boelter Reactor Facility ML20128G2081993-01-28028 January 1993 Forwards Final Release Survey Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project ML20127K2731993-01-0404 January 1993 Forwards Final Decommissioning Rept for Boelter Reactor Facility Dismantlement & Final Decommissioning Project ML20116E2951992-10-12012 October 1992 Provides Clarification of Two Items Noted in Insp Rept 50-142/92-01 & Informs of Personnel Change at UCLA ML20086J2451991-12-0404 December 1991 Discusses Changes in Organizational Structure at School of Engineering & Applied Sciences & Radiation Safety Ofc Since Issuance of NRC 890728 Order Authorizing Phase II Decommissioning.Revised Organization Chart Encl ML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20055J3881990-07-26026 July 1990 Advises That Author Retiring from Position of Radiation Safety Officer,Effective 900731 ML20248A3441989-09-20020 September 1989 Advises That Batch of Approx 5,000 Lb of Neutron Activated Lead Transferred on 890818 to Another Licensee for Possible Recycle Into Shielding for Waste Disposal.No Radioactive Matl Remaining at Univ & Licensee Complied W/Agreement ML20246F6201989-08-24024 August 1989 Forwards Commission Safety Evaluation & Environ Assessment & Finding of No Significant Impact for Phase II Decommissioning of UCLA Research Reactor,Per 890810 Request.W/O Encl ML20247Q6951989-07-28028 July 1989 Forwards Order Authorizing Phase II of Facility Dismantling & Disposition of Component Parts,Per 880610,21,1207 & 890331 Requests.Environ Assessment & Finding of No Significant Impact & Safety Evaluation Also Encl ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20245C5411989-04-12012 April 1989 Submits Followup to & Response to Ltrs from C Woodhead & D Hirsh Re EPA Regulatory Problems Concerning Transfer of Neutron Activated Lead Remaining at Reactor Facility to Univ License for Future Use as Shield Matl ML20248F7901989-03-31031 March 1989 Forwards Plan for Improvement of Procedures & Documentation for Final Reactor Facility Decommissioning,In Response to Insp Rept 50-142/89-10 ML20236C9381989-03-14014 March 1989 Forwards Request for Addl Info Re Decommissioning Phase II Plan Submitted on 880610 & Suppls on 880621 & 1207.Response Requested within 15 Days of Ltr Date ML20235Z1401989-03-0303 March 1989 Responds to Appeal of Denial of FOIA Request for Documents 36-61 on App C.Releases Documents C-38 - C-58,C-60 & C-61. Other App C Documents Withheld (Ref FOIA Exemption 5) ML20236A1481989-02-27027 February 1989 Forwards Insp Rept 50-142/89-01 on 890131-0201.No Noncompliance Noted ML20235V1671989-02-14014 February 1989 Informs That Proposal Re Transfer of 4,000 Lb of Radioactive Lead Shot & 1,000 Lb Lead Brick Does Not Conform to Settlement Agreement.Related Correspondence ML20195D6371988-10-27027 October 1988 Responds to Re Decomissioning Review of Reactor Facility ML20207M1931988-10-12012 October 1988 Forwards Request for Addl Info Re 880610 & 21 Phase II Decommissioning Plan.Response Requested within 60 Days of Ltr Date ML20154M8311988-09-20020 September 1988 Responds to Request for Info Re Phase I Nuclear Reactor Decommissioning.Concerns Raised Re Time Element for Review of Phase I Rept While Awaiting Approval Order for Removing Remaining Reactor Structures & Decommissioning Facility ML20207D1741988-07-18018 July 1988 Partial Response to FOIA Request for Documents.App G Documents Partially Withheld (Ref FOIA Exemption 4) ML20195E5741988-06-24024 June 1988 Ack Receipt of 780616 Response to 750529 Notice of Violation.Understands That Necessary Training of Police Officers Will Be Completed in Jul 1975 ML20195G6351988-06-21021 June 1988 Forwards Revised Pages for Phase II Plan for Former Reactor Facility.Some Editorial Corrections Made on Pages 6,12,15 & 16 ML20195G5041988-06-21021 June 1988 Forwards Pages 6,12,15 & 16 for Placement in Phase II Plan for Former Reactor Facility Sent on 880610.Editorial Changes Made to Pages ML20195E5531988-06-13013 June 1988 Partial Response to FOIA Request for Documents.App F Documents Encl & Available in PDR ML20155C6211988-06-10010 June 1988 Forwards Rept of UCLA Reactor Decommissioning,Guide for Phase Ii,Final Phase. Rept Covers Removal of Remaining Structures.Expeditious Review to Enable Distribution of Request for Proposal to Prospective Contractors Requested ML20155H4331988-06-0303 June 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents.App D & E Documents Available in PDR ML20154E5341988-05-13013 May 1988 Partial Response to FOIA Request.App C Documents Encl & Available in PDR ML20151S6331988-04-19019 April 1988 Forwards Amended Page of Attachment I to Je Mclaughlin to a Adams Correcting Typos ML20151G2601988-04-12012 April 1988 Forwards Responses to Questions 9-15 & Phase I of Summary Rept Dismantlement of Reactor,Per NRC .Phase II Plan Under Development ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20149M0501988-02-18018 February 1988 Ack Receipt of 880112 Answers to Remaining Questions Re Phase I of Decommissioning Effort & Request for Quotation Concerning Phase Ii.Plan to Dismantle Facility & Dispose of Component Parts Requested Per 10CFR50.82 ML20215C0501987-06-11011 June 1987 Informs of Recent Reorganization in Nrr.Organization Now Called Standardization & Non-Power Reactor Project Directorate.Project Manager for Facility Is a Adams ML20203M8871986-08-30030 August 1986 Informs of Change of Address ML20211Q2831986-07-14014 July 1986 Forwards Order Authorizing Phase I of Facility Dismantling & Disposition of Component Parts,Per 851029 Application. Finding of No Significant Environ Impact,Safety Evaluation & Environ Assessment Encl ML20210H9231986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20140D0901986-03-21021 March 1986 Forwards Answers to NRC Questions 1-8 Re Reactor Facility Dismantling Plan.Questions 9-15 Will Be Answered as Part of Rept Submitted at Conclusion of Phase I of Dismantling Operations ML20141P1521986-03-12012 March 1986 Forwards Request for Addl Info Re 851029 Reactor Decommissioning Plan.Response Requested by 860321 ML20136C5061985-12-16016 December 1985 Repts Organizational & Other Changes Made in Response to App 2 of ASLB Order ML20137Y8731985-12-0404 December 1985 Responds to 850925 Request for Amend to License R-71 Tech Specs.No Action Can Be Taken on Request.Aslb 851108 Order Terminated & Superseded License R-71 ML20210A4121985-11-13013 November 1985 Forwards Correction to ASLB Proposed Order Prepared in Response to 851030 Memorandum & Order on Behalf of Parties ML20210A4421985-11-0606 November 1985 Requests Signature on Encl Correction to Settlement Agreement ML20138M8861985-10-29029 October 1985 Forwards Decommissioning Plan:Phase I:Dismantlement & Radiological Assessment of UCLA Argonaut Reactor Facility. Final Step of Plan Includes Submission of Formal Plan for Achieving Ultimate Decommissioning of Facility ML20138L4091985-10-25025 October 1985 Forwards Draft Response to Board 851016 Order for Review,Per Request.Notification of Receipt Requested Prior to 851030. W/O Encl.Related Correspondence 1995-01-24 Category:EXTERNAL CORRESPONDENCE MONTHYEARML20092D8791984-06-21021 June 1984
[Table view]Forwards,For Execution,Stipulated Order for Suspension of License Proceedings.Woodhead Signature on Executed Stipulation Requested.W/O Encl ML20092H6071984-06-20020 June 1984 Forwards Wf Wegst to H Denton Informing of Decision to Withdraw Application for License Renewal.Related Correspondence ML20092H6251984-06-19019 June 1984 Forwards Redraft of 840615 Proposed Stipulation Substituting Language,Including Ref to Removal of Fuel Prior to Beginning of Olympic Games.Language Creates Expectation That Cannot Be Realized.Related Correspondence ML20084H4951984-05-0202 May 1984 Confirms 840428 & 0502 Telcons Re Facility Site Tour Per ASLB 840420 Order & Discusses Disposition of Committee to Bridge the Gap (Cbg) Expert Security Witnesses & Rl Kohn Appearance for Cbg.Related Correspondence ML20079M6121984-01-23023 January 1984 Discusses Delay in Transmitting Documents to Parties Re UCLA Views About Converting Reactor to Low Enriched U Fuel & Univ Transmittal of Documents to Committee to Bridge the Gap ML20083C4981983-12-19019 December 1983 Forwards Requested Videotape, Safety Experiments on Boiling Reactor & Invoice for Costs of Duplication ML20083C5101983-12-19019 December 1983 Forwards Payment of Costs for Requested Documents. Objections to Copying Charge Not Waived ML20083A6621983-12-13013 December 1983 Advises of Attempts to Obtain Print Originals for Photocopied Micrographs Submitted in Connection W/Rebuttal Testimony on Fission Product Releases.Duplicates Will Be Sent to ASLB & Parties as Soon as Prints Received ML20082R4661983-12-0909 December 1983 Informs That Clear Glossy Prints Requested of Photocopied Micrographs Attached to Proposed Rebuttal on Fission Product Release Not Received.Ability to Respond on Schedule Depends on Prompt & Complete Submission ML20082R8921983-12-0808 December 1983 Forwards List of Documents Requested for Review on 831214. Borax Tape Sent Out for Copying.Assumption Made That Delaying Tactics Re Core Drawings & Ostrander Calculations Will Not Be Repeated ML20082K2921983-11-29029 November 1983 Reiterates Ultimatum That Committee to Bridge the Gap Representative Will Be at UCLA on 831201 to Receive Ostrander Calculation.Ucla Dilatory Practices Can No Longer Be Tolerated ML20082E5071983-11-18018 November 1983 Forwards Listed Remaining Exhibits.Clarification of Borax Tape & Complete Neutron Escape Calculations Requested.W/O Encl ML20080K5301983-09-26026 September 1983 Forwards Identification of Photographs by Roll & Frame Number ML20080D1971983-08-26026 August 1983 Suggests Review of Records & Notification of Method for Identification of Photographs of Nuclear Energy Lab, Not Transmitted W/Prefiled Testimony ML20024E5441983-08-0909 August 1983 Forwards D Hirsch 830301 Ltr to Ucla Re Copying Charge Adjustment ML20072B9211983-03-0101 March 1983 Requests Refund of Copying Charges for Discovery Documents Since Correct Charges Should Be Four Cents Instead of Twenty Cents Per Page ML20063H1071982-08-26026 August 1982 Forwards Table Representing Fuel Inventory & Answers to Fuel self-protection Calculation Questions,In Response to 820818 Agreement ML20063C9161982-08-23023 August 1982 Forwards Addl Questions Re Fuel self-protection Calculations Included as Exhibit a to Univ Response to Committee to Bridge the Gap Interrogatories on Contention Xx,Per 820819 Agreement ML20063A4861982-08-20020 August 1982 Forwards Latest Amends to Application,Correcting Two Items in Emergency Response Plan ML20058J7031982-08-0606 August 1982 Requests Svc to Listed Persons of New Emergency Plan & 820430 Amends.Future Timely Svc & Compliance W/Filing Deadlines Requested ML20055A4101982-07-12012 July 1982 Forwards Retyped Stipulation,For Signature.W/O Encl ML20054F7571982-06-16016 June 1982 Forwards Integrated List of Pages of Operating Logs to Be Copied for Review ML19350E3251981-06-0909 June 1981 Responds to 810604 Ltr Re Client Requests for Document Production.Requests That Two Addl Document Review Days Be Scheduled for Wk of 810615 at Mutually Convenient Time & Location.Review Should Include All Retrieved Documents ML20008G1971981-05-0101 May 1981 Informs That ASLB 810310 Order Did Not Grant Motion to Compel Further Answers to Past Interrogatories,In Response to 810421 Ltr.Order Admonished Licensee for Less than Frank Interrogatory Responses.Related Correspondence ML20003J4281981-04-24024 April 1981 Notifies That Committee to Bridge the Gap Will Submit Third Motion to ASLB to Compel Further Answers If Regents of Univ of CA Do Not Respond to ASLB 810310 Order by 810504. Related Correspondence ML20003J4341981-04-24024 April 1981 Forwards Check from Committee to Bridge the Gap for Expenses Incurred by Applicant in Duplicating Certain Portions of 1976-1980 Operation Logs & Annual Repts.Proposed Dates for Viewing Matl Are 810505 & 06 ML19350B7701981-03-13013 March 1981 Requests Parts of Operating Logs & Annual Specialized Activity Repts.Related Correspondence ML19353A2051980-12-30030 December 1980 Request,Submitted on Behalf of Intervenor Bridge the Gap,For Date Univ Will Provide Further Response to Intervenor First Set of Interrogatories,Questions 4-6 & 9 Re Contention 2 ML20050A7671980-12-0404 December 1980 Forwards Rept of June 1980 Radioactive Contamination Incident Involving Tri-State Motor Transport Truck Carrying Cask of Spent Reactor Fuel in CA ML20050A7771980-08-0707 August 1980 Forwards QA Program,Health Physics Wipe Survey Results, Procedures & Checklists & Shipper Certification for Radioactive Matls Re Shipment Involved in June 1980 Contamination Incident.Procedures Summarized ML20050A7921980-05-29029 May 1980 Forwards Completed Doe/Nrc Form 741.Serial Numbers on Fuel Plates in Shipment Should Be Determined If Possible.W/O Encl ML20050A7881978-11-0909 November 1978 Submits Estimate of Min Cost for Return of Irradiated Fuel Elements to Us.Doe Should Underwrite Cost Per Reactor Fuel Cycle Assistance Contract,Part A-II(b)(2)(iii) ML20050A7831978-09-0606 September 1978 Requests Permission to Ship Five Irradiated Fuel Bundles & Three Irradiated Fuel Plates to Id Chemical Reprocessing Plant in Dec 1978.Request for DOE Funds to Underwrite Transfer Will Be Submitted Following Transfer 1984-06-21 Category:EXTERNAL LETTERS ROUTED TO NRC MONTHYEARML20092D8791984-06-21021 June 1984
[Table view]Forwards,For Execution,Stipulated Order for Suspension of License Proceedings.Woodhead Signature on Executed Stipulation Requested.W/O Encl ML20092H6071984-06-20020 June 1984 Forwards Wf Wegst to H Denton Informing of Decision to Withdraw Application for License Renewal.Related Correspondence ML20092H6251984-06-19019 June 1984 Forwards Redraft of 840615 Proposed Stipulation Substituting Language,Including Ref to Removal of Fuel Prior to Beginning of Olympic Games.Language Creates Expectation That Cannot Be Realized.Related Correspondence ML20084H4951984-05-0202 May 1984 Confirms 840428 & 0502 Telcons Re Facility Site Tour Per ASLB 840420 Order & Discusses Disposition of Committee to Bridge the Gap (Cbg) Expert Security Witnesses & Rl Kohn Appearance for Cbg.Related Correspondence ML20079M6121984-01-23023 January 1984 Discusses Delay in Transmitting Documents to Parties Re UCLA Views About Converting Reactor to Low Enriched U Fuel & Univ Transmittal of Documents to Committee to Bridge the Gap ML20083C4981983-12-19019 December 1983 Forwards Requested Videotape, Safety Experiments on Boiling Reactor & Invoice for Costs of Duplication ML20083C5101983-12-19019 December 1983 Forwards Payment of Costs for Requested Documents. Objections to Copying Charge Not Waived ML20083A6621983-12-13013 December 1983 Advises of Attempts to Obtain Print Originals for Photocopied Micrographs Submitted in Connection W/Rebuttal Testimony on Fission Product Releases.Duplicates Will Be Sent to ASLB & Parties as Soon as Prints Received ML20082R4661983-12-0909 December 1983 Informs That Clear Glossy Prints Requested of Photocopied Micrographs Attached to Proposed Rebuttal on Fission Product Release Not Received.Ability to Respond on Schedule Depends on Prompt & Complete Submission ML20082R8921983-12-0808 December 1983 Forwards List of Documents Requested for Review on 831214. Borax Tape Sent Out for Copying.Assumption Made That Delaying Tactics Re Core Drawings & Ostrander Calculations Will Not Be Repeated ML20082K2921983-11-29029 November 1983 Reiterates Ultimatum That Committee to Bridge the Gap Representative Will Be at UCLA on 831201 to Receive Ostrander Calculation.Ucla Dilatory Practices Can No Longer Be Tolerated ML20082E5071983-11-18018 November 1983 Forwards Listed Remaining Exhibits.Clarification of Borax Tape & Complete Neutron Escape Calculations Requested.W/O Encl ML20080K5301983-09-26026 September 1983 Forwards Identification of Photographs by Roll & Frame Number ML20080D1971983-08-26026 August 1983 Suggests Review of Records & Notification of Method for Identification of Photographs of Nuclear Energy Lab, Not Transmitted W/Prefiled Testimony ML20024E5441983-08-0909 August 1983 Forwards D Hirsch 830301 Ltr to Ucla Re Copying Charge Adjustment ML20072B9211983-03-0101 March 1983 Requests Refund of Copying Charges for Discovery Documents Since Correct Charges Should Be Four Cents Instead of Twenty Cents Per Page ML20063H1071982-08-26026 August 1982 Forwards Table Representing Fuel Inventory & Answers to Fuel self-protection Calculation Questions,In Response to 820818 Agreement ML20063C9161982-08-23023 August 1982 Forwards Addl Questions Re Fuel self-protection Calculations Included as Exhibit a to Univ Response to Committee to Bridge the Gap Interrogatories on Contention Xx,Per 820819 Agreement ML20063A4861982-08-20020 August 1982 Forwards Latest Amends to Application,Correcting Two Items in Emergency Response Plan ML20058J7031982-08-0606 August 1982 Requests Svc to Listed Persons of New Emergency Plan & 820430 Amends.Future Timely Svc & Compliance W/Filing Deadlines Requested ML20055A4101982-07-12012 July 1982 Forwards Retyped Stipulation,For Signature.W/O Encl ML20054F7571982-06-16016 June 1982 Forwards Integrated List of Pages of Operating Logs to Be Copied for Review ML19350E3251981-06-0909 June 1981 Responds to 810604 Ltr Re Client Requests for Document Production.Requests That Two Addl Document Review Days Be Scheduled for Wk of 810615 at Mutually Convenient Time & Location.Review Should Include All Retrieved Documents ML20008G1971981-05-0101 May 1981 Informs That ASLB 810310 Order Did Not Grant Motion to Compel Further Answers to Past Interrogatories,In Response to 810421 Ltr.Order Admonished Licensee for Less than Frank Interrogatory Responses.Related Correspondence ML20003J4281981-04-24024 April 1981 Notifies That Committee to Bridge the Gap Will Submit Third Motion to ASLB to Compel Further Answers If Regents of Univ of CA Do Not Respond to ASLB 810310 Order by 810504. Related Correspondence ML20003J4341981-04-24024 April 1981 Forwards Check from Committee to Bridge the Gap for Expenses Incurred by Applicant in Duplicating Certain Portions of 1976-1980 Operation Logs & Annual Repts.Proposed Dates for Viewing Matl Are 810505 & 06 ML19350B7701981-03-13013 March 1981 Requests Parts of Operating Logs & Annual Specialized Activity Repts.Related Correspondence ML19353A2051980-12-30030 December 1980 Request,Submitted on Behalf of Intervenor Bridge the Gap,For Date Univ Will Provide Further Response to Intervenor First Set of Interrogatories,Questions 4-6 & 9 Re Contention 2 ML20050A7671980-12-0404 December 1980 Forwards Rept of June 1980 Radioactive Contamination Incident Involving Tri-State Motor Transport Truck Carrying Cask of Spent Reactor Fuel in CA ML20050A7771980-08-0707 August 1980 Forwards QA Program,Health Physics Wipe Survey Results, Procedures & Checklists & Shipper Certification for Radioactive Matls Re Shipment Involved in June 1980 Contamination Incident.Procedures Summarized ML20050A7921980-05-29029 May 1980 Forwards Completed Doe/Nrc Form 741.Serial Numbers on Fuel Plates in Shipment Should Be Determined If Possible.W/O Encl ML20050A7881978-11-0909 November 1978 Submits Estimate of Min Cost for Return of Irradiated Fuel Elements to Us.Doe Should Underwrite Cost Per Reactor Fuel Cycle Assistance Contract,Part A-II(b)(2)(iii) ML20050A7831978-09-0606 September 1978 Requests Permission to Ship Five Irradiated Fuel Bundles & Three Irradiated Fuel Plates to Id Chemical Reprocessing Plant in Dec 1978.Request for DOE Funds to Underwrite Transfer Will Be Submitted Following Transfer 1984-06-21 |
Text
n
~ '
COMMITTEE TO BRIDGE THE GAP 1637 BUTLER AVENUE #203 LOS ANGELES, CALIFORNIA 90025: KEIED (213) 478-0829 "'"
iarch 1,1987
- 83 MAR -? AM:38 Mr. Willien Cormier ,. ,
Office of Administrative g[stpfcE Vice Chancellor M M!CH University of California Los Angeles CA 90024 RE: COPYIIIG CHARGE ADJUSTMF.NT, UCLA REACTOR RELICENSING CASE, DOCKET 50-142
Dear Mr. Cormier:
As directed in the Board Order of December 2,1982, CBG and UCLA are to attempt to resolve the mattor of appropriate charges for copying of discovery documents. In said Cztler, the Board indicated "that i+, did not believe that copying charges in excess of UCLA's actual copying cost could be justified." (p.4)
Please find attached a listing of the copying charges paid to date by CBG to UCLA at the rate UCLA then was charging of 20/ per page. The tots 1 is $822.20.
The Express Copying Service in Ackerman Union at UCLA charges 4p per page. Assuming that that is representative of UCLA's actual copying cost, as indicated in the Board Order, then 80% of the payments made by CBG to date for copying should be reimbarsed. This amount to be reimbursed is $657 76 Future bills should thus be at the rate of 4p per page rather than the 20p charged in the past.
Please remit $657.75 Assuming this is acceptable, we can ignore interest.
3in 17, ..
/
m
' . /
/
Daniel Hirsch President COIGIITTEE TO BRIDGE THE GAP EICIDSURE, ccu/ enclosures service list r
1 8303080044 830301 PDR ADOCK 05000142 O PDR
,e .e'
- 'l CBG COPYING PAY 1EiTS To UCLA*
C3G check f UCLA invoice f amount 1024 568317 $48.80 568318 127.20 568331 104.20 568332 11.20
$291.40 939 568300 $207.80 568301 25.80 4233.60 1098 568381 413.60 143 --- -
$60.00 130 568386 $101.40 1050 568348 $322.20 TOTAL................$822.20 a 20p/page if charged @ 4p/page would be 164.44
$657.76 owed cBG
- does not include invoice 1003, paid with check 1025, for 12 blueprints o $150 each.
-