i l

l REACTOR SAFETY PROCEDURES RS - 003 TECHNICAL VERIFICATION OF NUCLEAR STATION EMERGENCY PROCEDURES AND GUIDELINES Implementation Date February 21, 1983 Approved By: _ w .

,'- d Date [ 2.I.I113

Title:

b b qm Approved By: 8 m- Me m Date fe4.11 19dP  ;

A

Title:

Su sse.vn E, mic osi k g o, c& Sal.gl U

} i yG 1

8303070164 830228 PDR ADOCK 05000413 A PDR j

)

4 RS - 003 TECHNICAL VERIFICATION OF NUCLEAR STATION EMERGENCY PROCEDURES AND GUIDELINES 4

Purpose 4

, This procedtire outlines an appropriate method for performing the technical verification of nuclear station emergency procedures, plant specific emergency procedure guidelines, and NSSS vendor j guidelines. The procedure is applicable to both the initial verification and the long term maintenance of the plant specific guidelines and emergency procedure revisions.

l e.

n -- , - - - ~----c-e-y -.mr -- - - e- y - y -c. - -,-.g ,.m - -

g ---r --

RS - 003 TECHNICAL VERIFICATION OF NUCLEAR STATION EMERGENCY PROCEDURES ^ND GUIDELINES o

1.0 INTRODUCTION

NUREG-0737, " Clarification of TMI Action Plan Requirements,"

I.C.1, " Guidance for the Evaluation and Development of Proce-dures for Transients and Accidents," outlined requirements for upgrading nuclear station emergency procedures. This was followed by SECY-82-111B/ Supplement 1, " Requirements for Emergency Response Capability," which provides further clari-fication for upgrading emergency procedures. A major area for concern is the requirements for a verification and validation (V&V) program to be performed and maintained prior to implemen-tation of the upgraded procedures and future revisions to the procedures.

The verification program consists of two activities. First, a verification to assure written correctness is performed. A subsequent verification is concerned with technical content and accuracy. The validation program determines that the procedures will work in a control room environment in real time. This procedure is concerned only with the verification for technical content and accuracy.

Although the objective is to verify the technical accuracy of the station emergency procedures, it also necessarily involves verification of the background and reference documents used by the procedure writer. The background and reference documents of interest are the NSSS vendor guidelines, and the plant specific emergency procedure guidelines.

This procedure specifies an appropriate method for verification of the background and reference documents used by the emergency procedure author, and also for the verification of the proposed emergency procedure. The procedure results in a format for a comprehensive and thorough technical review which is documented in an efficient and traceable manner. The procedure also provides for resolution of outstanding concerns. j 2.0 SCOPE This procedure is for implementation within Reactor Safety.

1 ,

4' 3.0 APPLICABILITY This procedure is applicable to the initial technical verification of NSSS vendor guidelines, plant specific emergency procedure guidelines, and emergency procedures for i all nuclear stations. It is also applicable to the long term maintenance of the plant specific guidelines, and to technical verification of emergency procedure revisions.

4.0 TECHNICAL VERIFICATION OF NSSS VENDOR GUIDELINES 4.1 Initial Verification ,

4.1.1 Objective i

i The objective of the initial verification of the vendor guidelines is to determine that the guide-lines provide correct and achievable methods for 4 mitigation of plant transients. The verification d

process shall also determine the completeness and

the limits of applicability of the guidelines.

The results of the initial verification are

utilized for correcting and updating the plant

~

specific guidelines.

4.1.2 Method The vendor guidelines are based on an integration i of analysis, operating experience, and engineering

. judgment. The verification process shall assess

! the correctness and reasonableness of the analytical bases, the interpretation of lessons

, learned from operating experience, and the logic and thought processes utilized to convert know-

! ledge into procedures. The method for verification l is detailed in the following sections.

}

i 4.1.2.1 Verifier Qualifications 4

! The Lead Safety Analysis Engineer shall determine that the verifier is qualified to i perform the technical verification of vendor guidelines.

i 4.1.2.2 Control of the Document The version of the document undergoing verification shall be controlled and uniquely specified. Revisions and updates to the j documents require subsequent verification.

9 i 2 J

- - . . ., . ~~ . . - , , . . . - - .,,e-, ., . , , , .n_, ,. n .. - a r.--.,.- ,. .-

i

)

l 4.1.2.3 Guideline Review The verifier shall develop a list of review comments which record observations of errors, inconsistencies, omissions, etc. , of any nature. The comments shall pertain directly to the guideline documentation but may also include any and all observations related to the guide-lines regardless of the source. The verifier may include information from available sources related to the vendor guidelines in the verifi-cation process.

The review comments shall then be evaluated and insignificant comments shall be discarded. The remaining comments shall be formally documented per 4.1.3.1.

4.1.2.4 Evaluation of Guideline Review Following formal documentation of the review comments, an evaluation shall be made for each comment. The evaluation shall result in a recommendation for resolution of the comment.

The evaluation shall be documented per 4.1.3.2.

4.1.2.5 Verification The verifier shall initiate verification documentation per 4.1.3.3. Each evaluation from 4.1.2.4 which resulted in a recommendation for resolution shall be documented. The' document is verified when the following conditions are met:

1. Technical content and accuracy.
2. Consistent with FSAR licensing basis.
3. Based on sound operating principles and engineering judgment.

The document is verified when each evaluation item is addressed and resolved, or a program to provide resolution is documented. Evaluations which require a program to provide resolution must include documentation which justifies the acceptability of long term resolution. This documentation shall support the conclusion that no safety concern exists.

l I

i l

l

4.1.3 Documentation 4.1.3.1 Guideline Review Documentation The guideline review comments shall be documented on Attachment 1. The comments shall '

be entered in the following format. General comments which do not pertain to a specific location in the document shall be entered first. Specific comments shall then be entered  !

sequentially as they occur in the document. [

4.1.3.2 Guideline Review Evaluation Documentation For each guideline review comment documented on

,. Attachment 1, and evaluation of each comment shall also be documented on Attachment 1.

i 4.1.3.3 Verification Documentation i The verification shall be documented on Attachment 2. Each evaluation shall be stamped >

l and classified into one of the three following categories:

Catego ry Response

1. NO RESOLUTION REQUIRED No response necessary.
2. RESOLVED DATE Short term resolution to be initiated. To be initialed and dated upon completion. '
3. LONG TERM ITEM Long term effort required for resolution. Assign sequentially.

(see 4.1.3.4)

Each verification shall be assigned an identifier per the following format:

WWWX-YY-ZZ Where: WWW = nuclear station (ONS,MNS,CNS)

X = applicable unit (1,2,3,A(all))

l YY = document number (sequential) l ZZ = revision number (sequential) ,

I 4

l l

l

4.1.3.4 Documentation of Outstanding Concerns The Lead Safety Analysis Engineer shall submit for review a program for resolution of the Category 3 (see 4.1.3.3) comments to the System Engineer, Reactor Safety. A " List of Outstanding Concerns" shall be maintained for each nuclear r station. This list shall reference the originating document. The System Engineer, Reactor Safety, shall approve a plan for resolution of the outstanding concern. The Lead Safety Analysis Engineer shall undertake to resolve the concern and delete it from the list.

4.2 Long Term Verification 4.2.1 Objective The objective of the long term verification of the vendor guidelines is to maintain the validity of the initial verification by performing technical verification of revisions or updates to the vendor guidelines for revisions issued by the vendor.

4.2,2 Method Revisions to the vendor guidelines issued by the vendor shall be documented per 4.2.3.1 upon receipt from the vendor. The revision shall be promptly assessed to determine if any changes in technical content significantly impact the existing guidelines and consequently the emergency procedures. If a significant impact is identified, then the Lead Safety Analysis Engineer shall notify the System Engineer, Reactor Safety. The System Engineer, Reactor Safety, shall approve a plan for timely resolution and revision of the emergency procedures. The Lead Safety Analysis Engineer shall undertake technical verification of the vendor guideline revisions per 4.2.3.2. The Lead Safety Analysis Engineer shall promptly notify the appropriate r station contact of the scope of the vendor revisions and the schedule for the plant specific guideline revision. -

4.2.3 Documentation 4.2.3.1 Guideline Revision Evaluation Documentation  !

l On receipt from the vendor of a revision to the vendor guidelines, the revision shall be documented on Attachment 3. Each revision shall be assigned an identifier per the following '

format:

5 4

WWWX-YY-ZZZ Where: WWW = nuclear station (ONS,MNS,CNS)

X = applicable unit (1,2,3,A(all))

YY = calender year ZZZ = sequentially assigned number for all guideline and EP revisions 4.2.3.2 Verification Documentation The verification shall be documented on Attachment 2. Each evaluation shall be stamped and classified into one of the three following categories:

Category Response

1. NO RESOLUTION REQUIRED No response necessary.
2. RESOLVED __DATE Short term resolution to be initiated. To be initialed and dated upon completion.
3. LONG TERM ITEM Long term effort required for resolution. Assign sequentially. (see 4.1.3.4)

Each verification shall be assigned an identificr per the following format:

WWWX-YY-ZZ Where: WWW = nuclear station (ONS,MNS,CNS)

X = applicable unit (1,2,3,A(all))

YY = document number (sequential)

ZZ = revision number (sequential) 4.2.3.4 Documentation of Outstanding Concerns The Lead Safety Analysis Engineer shall submit for review a program for resolution of the Category 3 (see 4.2.3.2) comments to the System Engineer, Reactor Safety. A " List of Outstanding Concerns" shall be maintained for each nuclear station. This list shall reference the originating document. The System Engineer, Reactor Safety, shall approve a plan for resolution of the outstanding concern. The Lead Safety Analysis Engineer shall undertake to resolve the concern and delete it from the list.

6

,g -y * ---

l 4.3 Control of the Document The NSSS vendor guidelines and the revisions to the guidelines issued by the vendor shall not receive

! controlled document status. The plant specific guidelines shall be based on the vendor guidelines and verified to be consistent witu the vendor guidelines

l. where applicable. The plant specific guidelines shall
receive controlled document status. Revisions to the l NSSS vendor guidelines issued by the vendor shall be included as revisions to the plant specific guidelines where applicable, and the revised guidelines verified.

The Lead Safety Analysis Engineer shall undertake j measures to maintain cognizance of all vendor issued documentation related to the vendor guidelines.

5.0 TECHNICAL VERIFICATION OF PLANT SPECIFIC GUIDELINES Plant specific emergency procedure guidelines are the refer-ence documents used by the emergency procedure author for the I

development of emergency procedures and subsequent revisions.

t Plant specific guidelines provide the technical basis for the emergency procedures. The NSSS vendor guidelines are typically applicable to a generic plant. The plant specific guidelines are based on the generic vendor guidelines, but may include guidelines which have been developed apart from the NSSS vendor which improve and optimize the vendor guidelines.

The plant specific guidelines reflect the operating experience acquired from industry experience and improvements in the understanding of plant response and techniques for mitigation of plant transients.

5.1 Initial Verification 5.1.1 Objective The objective of the initial verification of the plant specific guidelines is to determine that the guidelines provide correct and achievable methods for mitigation of plant transients, and to ensure that the conversion of the generic NSSS vendor l guidelines to plant specific design specifications is technically correct. The results of the verification of the vendor guidelines shall be incorporated into the plant specific guidelines.

7

)

5.1.2 Method 5.1.2.1 Verifier Qualifications I The Lead Safety Analysis Engineer shall l determine that the verifier is qualified to l perform the technical verification of plant )

specific guidelines.  ;

5.1.2.2 Control of the Document The version of the document undergoing verification shall.be controlled and uniquely specified. Revisions and updates to the document require subsequent verification.

5.1.2.3 Verification The verifier shall initiate verification

, documentation per 5.1.3.1. The results of the verification of the corresponding vendor guide-i line as documented in the latest revision to the Technical Verification Certificate, shall be addressed in the plant specific guidelines, or shall be included as outstanding items in the Technical Verification Certificate, Revison 0, of the plant specific guideline. Additional technical concerns identified during the verifi-cation of the plant specific guideline which are also applicable to the vendor guideline shall be documented per 5.1.3.1, but are not required to be documented in the vendor guideline documen-tation per 4.1.3.3. The document is verified when the following conditions are met:

1. Technical content and accuracy.
2. Consistent with applicable vendor guidelines.
3. Consistent with FSAR licensing basis.
4. Based on sound operating principles and engineering judgment.

The document is verified when each evaluation ites is addressed and resolved, or a program to provide resolution is documented. Evaluations l

which require a program to provide resolution must include documentation which justifies tha I acceptability of long term resolution. This I documentation shall support the conclusion that no safety concern exists.

t 8

, ,-_ , ---r.,., - . , _ . . - - , , - . . . , . - - , , , . - - . , ,

l i

t 5.1.3 Documentation

! 5.1.3.1 Verification Documentation The verification shall be documected on Attachment 2. Each verification shall be assigned an identifier per the following format:

WWWX-YY-ZZ

- Where
WWW = nuclear station (ONS,MNS,CNS)

X = applicable unit (1,2,3,A(all))

YY = document number (sequential)

. ZZ = revision number (sequential) 1 Each evaluation shall be stamped and classified into one of the three following categories
Category Response

, 1. NO RESOLUTION REQUIRED No response necessary.

2. RESOLVED _ DATE Short term resolution to 4

be initiated. To be l initialed and dated upon completion.

, 3. LONG TERM ITEM Long term effort required 4 g for resolution. Assign j j sequentially. (see 5.1.3.2) j 5.1.3.2 Documentation of Outstanding Concerns i

i The Lead Safety Analysis Engineer shall submit for review a program for resolution of the Category 3 (see 5.1.3.1) comments to the system

Engineer, Reactor Safety. A " List of Outstanding
Concerns" shall be maintained for each nuclear station. This list shall reference the j originating document. The System Engineer, Reactor Safety, shall approve a plan for 4

resolution of the outstanding concern. The Lead

) Safety Analysis Engineer shall undertake to l' resolve the concern and delete it from the list.

5.2 Long Term Verification 5.2.1 Objective f

The objective of the Idag term verification of the

plant specific guidelines is to maintain the
validity of the initial verification by performing technical verification of revisions or updates to the plant specific guidelines.

! 9 1

Revisions or updates to the plant specific guide-lines are expected to occur as a result of vendor initiated guideline revisions, inhouse optimization of emergency procedures, regulatory requirements, station modifications, and feedback from industry operating experience. ,

5.2.2 Method Potential revisions to the plant specific guidelines shall be documented per 5.2.3.1 upon receipt from any source. The revision shall be promptly assessed to determine if any changes in technical content significantly impact the existing guidelines and consequently the emergency procedures.

If a significant impact is identified, then the Lead Safety Analysis Engineer shall notify the System Engineer, Reactor Safety. The System Engineer, Reactor Safety, shall approve a plan for timely resolution and revision of the emergency procedures. The Lead Safety Analysis Engine 2r shall undertake technical verification of the plant specific guideline revisions per 5.2.3.2.

The Lead Safety Analysis Engineer shall promptly notify the appropriate station contact of the scope of the guideline revisions and the schedule for the completion of the guideline revisions.

4 5.2.3 Documentation 5.2.3.1 Guideline Revision Evaluation Documentation On receipt from any source of a potential revision to the plant specific guidelines, an evaluation of the potential revision shall be documented on Attachment 3. Each revision shall be assigned an '

identifier per the following format:

WWWX-YY-ZZZ Where: WWW = nuclear station (ONS,MNS,CNS)

X = applicable unit (1,2,3,A(all))

YY = calender year ZZZ = sequentially assigned number for all guideline and EP revisions 5.2.3.2 Verification Documentation i

The verification shall be documented on Attachment 2. Each verification shall be l assigned an identifier per the following format:

10 ,

i

l l

WWWX-YY-ZZ Where: WWW = nuclear station (ONS,MNS,CNS)

X = applicable unit (1,2,3,A(all))

YY = document number (sequential) ,

ZZ = revision number (sequential) l Each evaluation shall be stamped and classified into one of the three following categories:

Category Response

1. NO RESOLUTION REQUIRED No response necessary.
2. RESOLVED DATE Short term resolution to be initiated. To be initialed and dated upon completion.
3. LONG TERM ITEM Long term effort required for resolution. Assign se;aentially. (see 5.2.3.3)

~

5.2.3.3 Documentation of Outstanding Concerns

- The Lead Safety Analysis Engineer shall submit for review a program for resolution of the Category 3 (see 5.2.3.2) comments to the System Engineer, Reactor Safety. A " List of Outstanding Concerns" shall be maintained for each nuclear station. This list shall reference the originating document. The System Engineer, Reactor Safety, shall approve a plan for reJolution of the outstanding concern. The Lead Safety Analysis Engineer shall undertake to resolve the concern-and delete it from the list.

5.3 Control of the Document The plant specific guidelines shall be developed into a formally controlled document. " Emergency Procedure Guide-lines" (EPG) shall be maintained by the Lead Safety Analysis Engineer for each nuclear station. The Lead Safety Analysis Engineer shall determine and control the distribution of the EPG's and be responsible for distribution of EPG revisions. Each individual on the EPG distribution list shall acknowledge receipt and implementation of revisions, and the Lead Safety Analysis Engineer shall record and maintain a record of acknowledgments.

11

6.0 TECHNICAL VT.RIFICATION OF EMERGENCY PROCEDURES Nuclear station emergency procedures are developed by the station staff. The station staff is responsible for maintaining consistency with the plant specific guidelines.

Technical verification of the emergency procedures and revisions is undertaken to provide an independent review for technical consistency with the guidelines.

6.1 Initial Verification 6.1.1 Objective The objective of the initial verification of the emergency procedures is to determine that the procedures correctly interpret the technical content of the plant specific guidelines.

6.1.2 Method 6.1.2.1 Verifier Qualifications The Lead Safety Analysis Engineer shall determine that the verifier is qualified to perform the technical verification of emergency procedures.

6.1.2.2 Control of Document ,

t I

The version of the document undergoing verification shall be controlled and uniquely specified. Revisions and updates to the document require subsequent verification.

6.1.2.3 Verification The verifier shall initiate verification [

documentation per 6.1.3.1. The document is l verified when the following conditions are met: ,

1. Technical content and accuracy.
2. Consistent with applicable plant  !

specific guidelines.

3. Consistent with FSAR licensing basis. ,
4. Based on sound operating principles and engineering judgment. i 5.

The applicable plant specific guideline verification is completed.

l l

12 i

6.1.3 Document.ition 6.1.3.1 Verification Documentation The verification shall be documented on Attachment 2. Each verification shall be assigned an identifier per the following format:

WWWX-YY-ZZ Where: WWW = nuclear station (ONS,MNS,CNS)

X = applicable unit (1,2,3,A(all))

YY = document number (sequential)

ZZ = revision number (sequential)

Each evaluation shall be stamped and classified into one of the three following categories:

Category Response

1. NO RESOLUTION REQUIRED No response necessary.
2. RESOLVED ___DATE Short term resolution to be initiated. To be initialed and dated upon completion.
3. LONG TERM ITEM Loag term effort required for resolution. Assign sequentially. (see 6.1.3.2) 6.1.3.2 Resolution of Outstanding Concerns The Lead Safety Analysis Engineer shall subsit to the System Engineer, Reactor Safety, a description of any significant outstanding concerns which prevent prompt resolution and completion of the verification. The Safety Engineer, Reactor Safety, shall contribute to the resolution of the outstanding concern by contacting the appropriate management level at the impacted nuclear station.

I 6.2 Long Term Verification 6.2.1 Objective The objective of the long term verification of the

emergency procedures is to maintain the validity l

of the initial verification by performing technical verification of revisions or updates to the emergency procedures, and to facilitate expeditious implementation of revised procedures, as necessary.

13

- _ - - - -- -, > ~ ~ , em wwa- yr,---- - - - - , m ---y, --a, --- ,n,, - , ,-,, ,,w-y,w w,-a --,- - -,,m--

o .

6.2.2 Method Proposed revisions to the emergency procedures shall be documented per 6.2.3.1 upon receipt from any source. Yhe Lead Safety Analysis Engineer shall undertake technical verification of the emergency procedure revisions per 6.2.3.2. The Lead Safety Analysis Engineer shall promptly notify the appropriate station contac( of the schedule for the completion of the technical verification. In the event of a situation warranting an expedited technical verification, the transmittal of the emergency procedure revision and the results of the technical verification shall be transmitted orally by phone with full documentation initiated shortly thereafter and completed per 6.2.3.2.

6.2.3 Documentation 6.2.3.1 Emergency Procedure Revision Evaluation Documentation On receipt from any source of a proposed revision to an emergency procedure, an evaluation of the proposed revision shall be documented on Attachment 3. Each revision shall be assigned an identifier per the following format:

WWWX-YY-ZZZ Where: WWW = nuclear station (ONS,MNS,CNS)

X = applicable unit (1,2,3,A(all))

YY = calender year ZZZ = sequentially assigned number for all guideline and EP revisions 6.2.3.2 Verification Documentation The verification shall be documented on Attachment 2. Each verification shall be assigned an identifier per the following format:

1 WWWX-YY-ZZ l Where: WWW = nuclear station (ONS,MNS,CNS) )

X = applicable unit (1,2,3,A(all))

YY = document number (sequential) l ZZ = revision number (sequentially)

(

14

. - ~ . . . - -

l

Ea:h evaluation shall be stamped and classified into one of the three following categories:

Category Response

1. NO RESOLUTION REQUIRED No response necessary.
2. RESOLVED DATE Short term resolution to be initiated. To be initialed and dated upon completion.
3. LONG TERM ITEM Long term effort required for resolution. Assign sequentially. (see 6.2.3.3) 6.2.3.3 Resolution of Outstanding Concerns ,

The Lead Safety Analysis Engineer shall submit to the System Engineer, Reactor Safety, a description of any significant outstanding concerns which prevent prompt resolution and completion of the verification. The System Engineer, Reactor Safety, shall contribute to the resolution of the outstanding concern by contacting the appropriate management level at the impacted nuclear station.

6.3 Control of the Document The emergency procedures are under control of the nuclear

, stations. The Superintendent of Operations is responsible for assuring that the technical verification is completed prior to implementing an emergency procedure revision. -

7.0 INTERFACES The technical verification of the plant specific guidelines and the emergency procedures requires maintaining a number of interfaces at many steps in the verification process. These interfaces are shown in the attached Figure 1.

l l

l 15 t

l l

I e e 1

l Figure 1

    • CCtJi.pt P0m wasef a68u8eG Gus0 ELNElasso twascag, pe0CIOuant 48CM ' CONCle's8 Ame nsgue STafiONS ve 00.s H .Ori..nau,0 in ac 0CDuan.l.a w ae.00 c 0= u

-m .u- a

0. 0,. .. .. 0 t

( AGACTUN SAnTV )

[3 SvaLua@ l ase l3 l Op saamaCr 8M 'F l i .aspaCf I l soffhflab 6

, suuCb1A4

' ~~

c- 3 t

Ou,f,0. .v . ,

h .ev a.

0 CC-r l Sapffv om 80mmae000 70 One Om na0mg op fees

( myg }

pouDeine eseuCLEAe Opteafien esTAFtoma easuCL3Am Pe00 M eQE53 Gas $4metasang i evtMH34

  • CQ4Sub?Amf b

suCasAn (OPEmaften,1 j 1

ves 4 .evsew a.e4 COneastaf h

( a:acma sanry

)

G uietusets Ii 8tvisec e

wC nA C crem@anose )

'?E I e afweew asec l l Canoaseeer l

% "8

( asACros saem

)

. Ie agvr580 GweLJoes I nuno

( ,

e i l:3 ##0CSDumes ogveggO l

1 I ,

' i 14WCLAAs cremattosus

, 1

( * *

  • b 4@$$h IINk OOvI$w j iven ase0 a88e0vak  ;

6 Appeevte I l

=

J0- .A- 0 i

. j I

16 i l

l w -v- ,_ - --.--.%--y-.;, .p_ _ -.. , -.&-- .,, - -, .-yy

Attachment 1 (Page 1 of 2)

DUKE POWER COMPANY NUCLEAR PRODUCTION DEPARTMENT TECHNICAL DOCUMENT REVIEW PAGES DOCUMENT DATED ,.

REVIEWED BY DATE TITLE I

APPROVED BY DATE TITLE _

ITEM REVIEW COMMENTS RESOLUTION i

i I

i i

17 i

1

- - - ~ ~ . . . - - , - ~ ~ - . - . . _ l

. . Attachmsnt 1 (Page 2 of 2) p g TECHNICAL DOCUMENT REVIEW ITEM REVIEW COMMENTS RESOLUTION l

l i

l l

i l

f i

1 l

0 18

--e

Attachmsnt 2 (Page 1 of 2)

DUKE POWER COMPANY ~ ~

NUCLEAR PRODUCTION DEPARTMENT 1

NUCLEAR STATION EME3GENCY PROCEDURE / GUIDELINE TECHNICAL VERIFICATION CERTIFICATE i

l STATION UNIT 1

DOCUMENT f

I OATED l l

STATEMENT OF CERTIFICATION THIS DOCUMENT HAS SEEN VERIFIED IN ACCORDANCE WITH REACTCR SAFETY PROCEDURE RS 003

" TECHNICAL VERIFICATION OF NUCLEAR STATION EMERGENCY FROCEDURES AND GUIDELINES."

AND MEETS ALL APPL.lCABLE CRITERIA AS FOLLOWS:

YES NO N/A

_ _ _ Technical content and accuracy.

_ _ _ Consistent with applicable vencor guidelines.

- - - Consistent with caplicable plant specific guidelines.

_ _ _ Consistent with FSAR licensing basis.

2

- - _ Based on sound operating principles and engineering judgement.

, , , , THIS DOCUMENT DOES NOT MEET THE CRITERIA REQUIRED FOR CERTIFICATION. THE ITEMS ON THE FOLLOWING PAGES REQUIRE FURTHER REVISION OR JUSTIFICATION.

VERIFIED SY -_ DATE TITLE ORGANIZATION i .

REVIEWED BY DATE TITLE ORGANIZATION 19

' ~~-- - .I w- _ - - - - - - -,-,,,,e,. , _ _ , _ , _ _ _ ,,, _ , ,

~ _ ._

[ . . Attachment 2 (Page 2 of 2)

NUCLEAR STATION 7 .

- EMERGENCY PROCEDURE / GUIDELINE i Page of TECHNICAL VERIFICATION CERTIFICATE I

i i  ;

i STATION UNIT

. DOCUMENT t

DATED

! THE FOLLOWING ITEMS REQUIRE FURTHER REVISION OR JUSTIFICATION:

1 i

4 I

i RESPONSE: BY DATE 1

4 1

l f

20

l

~

  • i DUKE POWER COMPANY _ _ {

NUCLEAR PRCOUCTION DEPARTMENT l

NUCLEAR STATION Attachment 3 i

EMERGENCY PROCEDURE / GUIDELINE I REVISION EVALUATION

! STATION DOCUMENT  ;

e J- SUBMITTED BY 4

DATE TITLE ORGANIZATION DESCRIPTION OF REVISION l-4 i

i

OTHER AFFECTED DOCUMENTS i

! EVALUATION s

R ESPONSE TAKEN 4

i I

i EVALUATED BY DATE l TITLE ORGANIZATION APPROVED BY DATE l TITLE ORGANIZATION i

i 21 I