Responds to NRC Re Violations Noted in IE Insp Repts 50-277/83-07 & 50-278/83-07.Corrective Action: Radiation Area Immediately Reposted & Health Physicist Assigned to Monitor Reactor Bldg
ML20072B683
Person / Time
Site: Peach Bottom  
Issue date: 05/26/1983
From: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20072B672 List:
References
NUDOCS 8306140262
Download: ML20072B683 (2)


Text

e e

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 JOSEPH W. GALLAGH ER R I M M 3* % M ELuctmic enoouct om caramrusar May 26, 1983 Docket Nos. 50-277 50-278 Inspection Report Nos. 50-277/R3-07 50-278/83-07 Mr. Thomas T. Martin, Director Division of Engineering and Technical Programs U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 14406

Dear Mr. Martin:

Your letter dated April 29, 1993, forwarded combined Inspection Report 50-277/93-07 and 50-278/93-07 Appendix A addresses one item which does not appear to be in full compliance with Nuclear Regulatory Commission requirements.

This item is restated below followed by our response.

A.1 10 CFR 20.203 (b) requires that each radiation area be conspicuously posted with a sign or signs bearing the radiation caution symbol and the words " Caution Radiation Area."

Contrary to the above, on March 15, 1983, a radiation area around the Reactor Water Cleanup skid, 165 foot elevation, Northwest side of the reactor building was not posted as required.

This is a Severity Level V violation.

(Supplement IV)

Response

The area was immediately reposted upon identification of the problem by the inspector.

8306140262 830609 PDR ADOCK 05000277 O

PDR

,o e

Mr. Thomas T. Martin Page 2 At the time of the inspection, the Reactor Water Cleanup decontamination skid was being temporarily installed in the Unit 3 Reactor Building.

The northeast end of the corridor was properly posted.

The rope barrier on the northwest end of the area had been removed to allow additional equipment to be moved into the area.

The rope barrier was left down when personnel exited the area.

During the period of time the rope was down, the decontamination skid was not in use; however, there were dose rates of 10-20 mr/hr from the skid components.

Therefore, significant exposure risk was not associated with this occurrence.

The health physicist assigned to monitor activities in this area of the reactor building has been counseled regarding this incident.

Very truly yours, cc:

A.

R.

Blough, Site Inspector Peach Bottom 2