ML20072B243
| ML20072B243 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/02/1983 |
| From: | Miller D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20072B245 | List: |
| References | |
| CSC-6725, NUDOCS 8306130368 | |
| Download: ML20072B243 (1) | |
Text
-
CORSumerS w. m.,
Power su, u Company
= *a a
Midland Project: PO Box 1963, Midland, MI 48640 e (517) 631-866o PRINCIPAL STAFF RA ENF
-j, Dh-39(f 3/RA CM
/
A/RA PAO i
h 33h DPRP 3,LO DRMA RC l
o&MSF June 2, 1983 OE' I
f4L
_ L s OL l FILE Mr J J Harrison Midland Project Section U S Nuclear Regulatory Comission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER GhD 7020 EXCAVATION PERMIT PROCEDURE REVISION File: 0485.16 UFI: 42*05*22*04 Serial: CSC-6725 53*50*02 12*50 Enclosed is a copy of the Bechtel Field Procedure FIC-5.100 Rev 2, Excavation Pennit System for your review. We have revised the procedure to in'rease the scope of work to include all excavations associated with the underpinning of the Auxiliary Buildin and ervice Water Pump Structure.
tl r
V DBM/RHN/klm Attachments 0306130368 830602 JUN 6 1983
~
PDR ADOCK 05000329
,n TEol
^