Forwards Rev 2 to Bechtel Field Instruction FIC-5.100, Excavation Permit Sys, for Review.Rev Increases Scope of Work to Include Excavations Associated W/Underpinning of Auxiliary Bldg & Svc Water Pump Structure
ML20072B243
Person / Time
Site: Midland
Issue date: 06/02/1983
From: Miller D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20072B245 List:
References
CSC-6725, NUDOCS 8306130368
Download: ML20072B243 (1)


Text

-

CORSumerS w. m.,

Power su, u Company

= *a a

Midland Project: PO Box 1963, Midland, MI 48640 e (517) 631-866o PRINCIPAL STAFF RA ENF

-j, Dh-39(f 3/RA CM

/

A/RA PAO i

h 33h DPRP 3,LO DRMA RC l

o&MSF June 2, 1983 OE' I

f4L

_ L s OL l FILE Mr J J Harrison Midland Project Section U S Nuclear Regulatory Comission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER GhD 7020 EXCAVATION PERMIT PROCEDURE REVISION File: 0485.16 UFI: 42*05*22*04 Serial: CSC-6725 53*50*02 12*50 Enclosed is a copy of the Bechtel Field Procedure FIC-5.100 Rev 2, Excavation Pennit System for your review. We have revised the procedure to in'rease the scope of work to include all excavations associated with the underpinning of the Auxiliary Buildin and ervice Water Pump Structure.

tl r

V DBM/RHN/klm Attachments 0306130368 830602 JUN 6 1983

~

PDR ADOCK 05000329

,n TEol

^