ML20072B196
| ML20072B196 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 02/09/1983 |
| From: | Levin H TERA CORP. |
| To: | Eisenhut D, James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20072B187 | List: |
| References | |
| NUDOCS 8303040024 | |
| Download: ML20072B196 (1) | |
Text
-
o L J t
BERKELEY + DALLAS. BETHESDA. BATON ROUGE DEL MAR NEW YORK. SAN ANTONIO DENVER LOS ANGELES February 9, 1983 Mr. J. G. Keppler, Administrator Region III, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. D. G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Midland Independent Design Verification Program We are pleased to transmit for your review controlled copies of the Project Quality Assurance Plan (PQAP), Revision 1 and Engineering Program Plan (EPP), Revision 1, for the subject program. Mr. Keppler has been assigned copy 017 and Mr. Eisenhut copy 018.
Revision 0 corrected pages for each of these documents is enclosed for your information.
Sincerely, Howard A. Levin Project Manager Enclosure cc: w/o enclosure G. Keeley, CPC HAL/sl 8303040024 830222 PDR ADOCK 05000329 A
PDR TERA CORPORATION i
7101 WISCONSIN AVENUE BETHESDA MARYLAND 20814 301 654 8960 C
I