ML20072A811
| ML20072A811 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/01/1983 |
| From: | Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, GN-232, NUDOCS 8306100259 | |
| Download: ML20072A811 (1) | |
Text
Georgia Power Ccmpany Post Office Box 4545 Atlanta, Georgia 30302 USNRC pggtg Telephone 404 526-6526 Southern Company Services, Inc.
YQpg Georgia Power Post Office Box 2625 Birmingham, Alabama 35202 Southern CompanyServices 83 Jun g gg reiennone 205 87 * "
D. O. Foster VicePresident and General Manager Vogtle Project June 1, 1983 United States Nuclear Regulatory Comission File: X78G03-M38 Office of Inspection and Enforcement Log:
GN-232 Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Reference:
Vogtle Electric Generating Plant - Units 1 and 2 50-424, 50-425; Pullman Power Products Quality of Weld Radiographs Letter to J. P. O'Reilly February 28, 1983 (GN-217)
Attention: Mr. James P. O'Reilly Gentlemen:
In the above referenced letter, Georgia Power Company stated that NRC could expect an interim report on May 27, 1983.
Due to progress made in evaluating the above referenced concern, Georgia Power Company expects to submit a final report to the NRC on June 24, 1983.
This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.
Y ur truly, a
D. O. Foster 00F/CWH/jr xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 R. J. Kelly R. H. Pinson E. D. Groover R. E. Conway D. L. McCrary L. T. Gucwa G. F. Head R. A. Thomas M. Malcom J. T. Beckham, Jr.
J. A. Bailey G. Bockhold, Jr.
D. N. MacLemore
- 0. Batum P. D. Rice D. E. Dutton H. H. Gregory, III J. L. Vota W. F. Sanders 8306100259 830601 DiDD PDR ADOCK 05000424 g JL l[0
_