ML20072A617

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1982
ML20072A617
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/14/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20072A622 List:
References
NUDOCS 8301240082
Download: ML20072A617 (2)


Text

-_

M;iling Addr:ss Alabama Power Company 600 North 18th Street Post Office Box 2641 Birm;ngham, Alabama 33291 Telephone 205 783-6081 F. L Clayton, Jr.

b C7/ogggdl"'

Alabama Pbwer the southern electrc system January 14, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission

./

Washington, D.C.

20555

Dear Sir:

RE: JOSEPH M. FARLEY NUCLEAR PLANT Unit 2 Monthly Operating Data Report Attached are two (2) copies of the December,1982 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit ? Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly I

Y 6% t F. L. Clayton, Jr.

FLCJr/KWM:bhj Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) hh

~

83012400EE2 830114 PDR ADOCK 05000364

_R PDR

p..

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued into the month of December. The unit was shutdown on December 10, 1982 for the performance of the turbine overspeed trip test.

The following safety-related maintenance was performed in the month of December:

1.

Performed miscellaneons maintenance on diesel generators.

2.

Adjusted valve pressure setting on Power Operated Relief Valve PCV444B.

3.

Repacked #7 River Water Pump.