i /5550 RELATED CORRESPONDENCE DOCKETED l
USAWust 8,1994 UNITED STATES OF AMERICA 94 mir, -9 P 2 :55 i
NUCLEAR REGULATORY COMMISSION 0FFICE OF SFCRETARY.
t RVICE Before the Atomic Safety and Licensing Boa @CKlj l
)
In the Matter of
)
Docket Nos. 50-424-OLA-3
)
50-425-0LA-3 l
GEORGIA POWER COMPANY, )
etal.
)
Re: License Amendment
)
(Transfer to Southern l
(Vogtle Electric Generating
)
Nuclear) l Plant, Units 1 and 2)
)
)
ASLBP No. 93-671-01-OLA-3 GEORGIA POWER COMPANY'S RESPONSE TO INTERVENOR'S SEVENTH REOUEST FOR INTERROGATORIES I.
INTRODUCTION Georgia Power Company ("GPC") hereby responds to Intervenor's Seventh Request for Interrogatories to Georgia Power Company, dated July 25,1994 (the " Seventh Request").
A number of GPC's responses state an objection on the ground that Intervenor continues to seek information which is outside the scope of discovery established by the Board's Memorandum and Order (Scope of Discovery), dated June 2,1994. Based on statements by Intervenor's counsel at the July 29,1994 Status Conference (Tr. 554), GPC interprets the Seventh Request as a request for interrogatory responses only, and not as a request for documents.
II.
DENERAL OBJECTIONS A.
GPC objects to Instruction D of the Seventh Request (pp. 2, 3) which requires GPC to provide detailed information with respect to each document referred to in any of the gB150111 940808 o
ADocx o5000424 f2g 3 PDR
interrogatory responses. Given that Intervenor is intimately familiar with most of these documents, GPC objects to providing detailed information about those documents on the grounds that it would be unduly burdensome and oppressive.
B.
GPC also objects to Instructions E (p. 3) and F (p. 4) of the Seventh Request which require detailed information concerning every oral communication and person referred to in each of GPC's responses to interrogatories. Compliance with such instructions would be undt.ly burdensome and oppressive.
C.
As a general matter, GPC objects to Intervenor's definition of " Licensee,"
" Georgia Power Company," "The Southern Company," and "SONOPCO," and consequently to interrogatories which request information known to "GPC" as defined by Intervenor.
l Intervenor defines these terms as including every agent or employee of GPC, The Southern l
l Company, and/or SONOPCO, past or present, their counsel and all their respective agents, l
servants, associates, employees, representatives, and private investigators, and others who are or have been in possession of or may have obtained information for or on behalf of any l
of those entities. As a result, Intervenor would have GPC conduct an investigation as to the i
knowledge of every employee, agent or representative of each of these companies and indi-viduals. Such an investigation of each ofIntervenor's interrogatories would be unduly burdensome and oppressive. Without waiving this objection, GPC has endeavored to l
respond to Intervenor's interrogatories by making a reasonable inquiry of those individuals who GPC believes have material information related to these requests.
D.
GPC generally objects to the identification, or disclosure, of those communications and documents which are subject to the attorney work product doctrine or l
I :
the attorney-client communication privilege. GPC has been defending actions initiated by i
Intervenor since mid-1990. In addition to this proceeding, such actions include (1) NRC inspections, an NRC Office of Investigations ("OI") investigation, and an NRC enforcement action respecting those allegations lodged by Intervenor in the Hobby /Mosbaugh Petition related to the diesel generator statements issue, (2) three separate actions before the Department of Labor, (3) an investigation by the Department of Justice, and (4) an inquiry I
by a Congressional Subcommittee. GPC's legal counsel has been heavily involved in the defense of these actions and, as a result, has generated a large number of documents in preparation of such defenses. It would be oppressive and unduly burdensome and expensive for GPC to identify each and every one of such documents which are subject to either or both of (1) the attorney work product doctrine (i.e., they were prepared by legal counsel in i
anticipation of litigation and their disclosure would reveal the mental impressions of legal l
counsel), or (2) the attorney-client communication privilege (i.e., communications from GPC i
to its legal counsel made in confidence for the purpose of obtaining legal advice and counsel).
III.
RESPONSES TO INTERROGATORIES i
l
- 1. (Burr, Stokes) GPC objects to this interrogatory to the extent it requests information on the Vogtle emergency diesel generators ("EDGs") from January 1,1990 to l
present on the grounds that such request is overbroad and seeks information that is outside l
the scope of discovery established by the Board in this proceeding. Without waiving this i
l,
o objection, GPC has attached a table that provides the information requested for 1990, through August 30,8 in chronological order.
~
2.a. (Bockhold, Burr, Burwinkel, Horton, Kitchens, Kochery, Stokes) The review was based on activities conducted by I&C technicians, plant equipment operators, system engineers, and maintenance personnel under the overall direction of the Vogtle General Manager, Mr. George Bockhold.
2.b. (Bockhold, Burr, Burwinkel, Horton, Kitchens, Kochery, Stokes) GPC is unaware of source documents that were inspected or reviewed.
2.c. (Aufdenkampe, Bailey, Bockhold, Kitchens, Rushton, Ward) GPC is unable to determine who drafted the quoted statement or knew the information was transmitted to the drafter.
3.a. (Duncan, Hobbs, Kitchens) VP-2466 (Alnor 7200U).
3.b. (Aufdenkampe, Bailey, Bockhold, Kitchens, Rushton, Ward) GPC is unable to determine who authored the quoted statement.
3.c. (Aufdenkampe, Bockhold, Burr, Burwinkel, Horton, Kitchens, Kochery, Stokes) l GPC is unaware of any documents (other than Intervenor's Deposition Exhibit 44, Bates No.
46072) that were relied upon to conclude the instruments were faulty. GPC believes Mr.
Mark Briney relied upon the Exhibit 44 notes and that the conclusion was based on the fact that the dew point measurements for all eight air receivers were outside the acceptance range 8 Based on the Board's August 8,1994 Memorandum and Order (Intervenor's Seventh Set of Interrogatories), GPC has limited its response regarding the information requested to August 30,1990.11 at 2.
O l
~
l l
at the same time (which was contrary to previous measurements). GPC is unaware whether or not this conclusion was independently verified at the time.
l l
- 4. (Coursey, Burr, Hobbs, Kochery, Stokes) No.
- 5. (Coursey, Burr, Hobbs, Kochery, Stokes) No one currently employed by GPC who l
would reasonably be expected to possess such information recalls ever seeing a jar of fluid l
which came out of a diesel trip line.
- 6. (Kochery) See GPC's Response to Intervenor's Fifth Interrogatory and Document Request, dated July 29,1994 at 4 (response to interrogatory no. 7).
- 7. (Burr, Holcomb, Kochery, Stokes) GPC notes that the interrogatory incorrectly quotes the April 9,1990 Confirmation of Acdon letter. The quoted portion should read l
l
" internal inspection" not " initial inspection." Based on this clarification, Mr. J. B. Holcomb performed the inspection and Messrs. Ken Burr, Paul Ke i ery, and Ken Stokes witnessed the t
inspection. None of these individuals recalls observing residue in the receiver. However, GPC is aware that Mr. William Shipman, who was neither an inspector nor a witness to the inspection, wrote in his personal notes from April 11,1990, that the April 6,1990, internal inspection of the EDG 1A air receiver revealed " light rust film on welds, light oil film on bottom," but it "showed no degradation." Bates No. 015115.
- 8. (Burr, Holcomb, Stokes) GPC objects to this request to the extent it seeks information concerning any inspection ever done on the air receiver on the grounds it is unduly burdensome and overbroad in that it sees information which is outside the scope of discovery established by the Board in this proceeding. Without waiving these objections, the l
only internal inspection the EDG 1 A air receiver was subjected to in 1990 occurred on April I l l
a
- 6. Based on Mr. Shipman's notes (discussed in interrogatory 7 above), GPC believes that a light rust film may have been found on the welds and a light oil film may have been found on the bottom of the air receiver. GPC has previously produced a copy of Mr. Shipman's notes and the maintenance work order documentation associated with the April 6,1990 inspection. Sec GPC's Additional Response to Intervenor's Fourth Interrogatory and
)
Document Request, dated July 29,1994, at 5, and GPC's Additional Response to Intervenor's Fifth Interrogatory and Document Reque Tted August 8,1994, at 2.
- 9. (Duncan, Hobbs) Vogtle Procedure 00203-0, control of Measuring and Test Equipment," states that measuring and test equipment ("M&TE") found to be out of calibration "shall be tagged or visibly identified as nonconforming r, ~ moved from service until adequate corrective measures have been taken." E at Step 4.... Vogtle Procedure 20230-C, " Control of Instrument Shop Measuring and Test Equipment," states that
" personnel using M&TE shall be responsible for... reporting any malfunctions or suspected malfunctions to the Instrument Shop Supervisor...." E at Step L 1.2. A " hold tag" is affixed to the M&TE when calibration is due or otherwise requireo. E at Step 4.4.2.
Calibration checks are performed in cases where the calibration of an instrument is in doubt or the normal calibration interval arises. E at 4.12.3.
- 10. (Duncan, Hobbs) A review of the M&TE Traveler associated with the instrument identified in Interrogatory 3.a. indicates that it was removed from service on April 6,1990, and was not used again at Vogtle.
I1. (Bockhold) Following start no.136 on March 24,1990 and prior to start no.137 on March 27,1990.
1 l
e
- 12. (Burr, Stokes) GPC objects to this interrogatory on the grounds it is unreasonably cumulative and duplicative in that it seeks information already provided to Intervenor. See GPC's Response to Allen L. Mosbaugh's Third Set of Interrogatories, dated June 10,1994, at 38 (response to interrogatory no. 6, (Bates Nos. 064383-064422)) and GPC's Third Supplemental Response to Allen L. Mosbaugh's Third Set of Interrogatories, dated August 8,1994.
- 13. (Sheibani) GPC objects to this interrogatory to the extent it requests information on the Vogtle EDGs for the 1991 time frame on the ground that such request is outside the scope of discovery established by the Board in this proceeding. Further, GPC objects to this request as it would require GPC to perform additional research and analyses which Intervenor is able to perform himself. Without waiving such objections, with respect to the information requested for 1989 and 1990, copies of the Outside Areas Operator Rounds Sheets are available to Intervenor for inspection and copying in the Atlanta offices of GPC's counsel. See GPC's Response to Intervenor's Fifth Interrogatory and Document Request, dated August 8,1994 (response to document request no. 3).
1 7
Dated: August 8,1994 Ja'mes E. Joirier John Lamberski TROUTMAN SANDERS Suite 5200 600 Peachtree Street, N.E.
Atlanta, GA 30308-2216-(404) 885-3360 Ernest L. Blake David R. Lewis SHAW, PITTMAN, POTTS & TROWBRIDGE 2300 N Street, N.W.
Washington, D.C. 20337 (202) 663-8084 Counsel for Georgia Power Company i. -
1 1
DATE EDG A-CAUSE C-ROOT C AUSE C-SIMLACITY D-TYPE ROOT CAUSE E-CORRECTIVE ACTION l
STA"l~T #
ASSESSMENT PERFORMED I
61/03/90 1B EDO TRIPPED DUE TO LEAKWG SENSOR WAS UNKNOWN PER DC 1-900004 &
REPLACED THE LEAKING PRESSURE SENSOR 1-90 110 PRESSURE SENSOR ON RIGHT DISCARDED PRIOR TO SPECIAL REPORT 1 SANK TURBOCHARGER INVESilGATION OF 01 FAILURE MECHANISM G1f24/90 2A EDG DtD MOT START INITIALLY UNAetf TO NO 2-90 034 PER DC 2-90-0011 &
INCREASED AIR START VALVE CLEARANCE OtiCE IDENTIFY CAUSE. LATER SPECIAL REPORT 2-90 ROOT CAUSE WAS IDENTIFED.
DETERMINED TO BE O2 INADEQUATE CLEARANCE OF THE AIR START VALVES 01/25/90 2A EDO DJO NOT START INITIALLY UNABLE TO YES PER DC 2-90 0011 &
REPLACED AIR START DISTRIBUTOR FILTERS, 2-90 03s IDENTIFY CAUSE. LATER SPECIAL REPORT 2 90-DETERMINED TO BE INCREASED SURVEE. LANCE FREQUENCY, O2 INADEQUATE INCREASED AIR START VALVE CLEARANCE ONCE CLEARANCE OF THE AIR ROOT CAUSE WAS IDENTIFIED.
START VALVES O2/T1/90 2A UPON CLOSING THE EDG INITIAt.LY BELAEVED NO PER SPECLAL REPORT 2-SWITCHED TO REDUNDANT BRIDGE CIRCUIT AND 2-90'041 BREAKER, REACTIVE LO AD PROBLEM WAS DUE TO 90-02 BECAME VERY NEGATIVE AND FAILURE OF THE G ATE REPLACED THE GATE FtRfNG MODULE. VENDOR COULD NOT BE ADJUSTED FIRING MODULE ON THE TESTING FOUND NO PROBLEM WITH THE OATE BR3DGE CIRCudT IN FIRING MODULE. LATER, REVISED THE SERVICE. LATER PARALLELING PROCED'JRE TO REOUCE DETERMINEO TO DE PROBASILITY OF PICKING UP NEGATIVE REACTIVE IMPROPER PARALLEUNO LOAD ON BREAKER CLOSURE. PERSONNEL WERE OF THE EDG WITH THE TRAINED REGARDING THE REVISED PARALLELING GRID. PERSONNEL PROCEDURE.
ERROR.
C3/20/90 1A EDO STARTED IN RESPONSE TO SEE EVENT REPORT 1-NO PER EVENT REPORT 1-SEE NOTE I 1 -90L 139 LOSP THEN TRIPPED 90-03 AND NUREG-1410 90-03 03/20/90 1A EDO STARTED IN RESPONSE TO SEE EVENT REPORT 1-YES PER EVENT REPORT 1-SEE NOTE 1 1-90-140 LOSP. THEN TRIPPEO 90-03 AND NUREG 1410 90 03 C3121/90 15 EDG DfD NOT START DURING FUEL SUPPLY LINES YES PER SPECIAL REPORT 1-NONE(THIS CONDITION SOMETIMES OCCURS 1-90-12C FIRST MAINT. RUN POLLOWING WERE NOT COMPLETELY 91-01 18-MONTH WSPECTION FULL. THESE WERE FOLLOWING THIS TYPE OF M A!NTENANCE DRAINEO DURING ACTIVITY)
MAINT. ACTIVITIES L3/21/90 18 EDG DID NOT START FUFL SUPPLY UNES YES PER SPECIAL REPORT 1 MONE tTHIS CONDITION SOMETIMES OCCURS 1-90-121 WERE NOT COMPLETELY 91-01 FULL. THESE WERE FOLLOWING THS TYPE OF MAINTEN ANCE D.R AINED DURWG ACTIVITY)
MAINT. ACTIVITIES 03/21/90 15 STOPPED EDO DUE TO LOW OIL OPERATOR D(D NOT NO PER SPECIAL REPORT l-NONE 1-90 123 PftESSURE. LOW TURBO. Oll ALLOW ENOUGH T3ME 91-01 PRESSURE & HIGH FUEL OIL FOR GAUGES TO DIFFERENTIAL PRESSURE STABUZE 03/21/90 18 EDG STOPPED TO FURTHER OPERATOR DIO NOT YES PER SPEC!AL REPCRT 1-NONE 1-90-124 INVESTIGATE HIGH FUEL OIL ALLOW ENOUGH TIME S1-01 FILTER DIFFERENTIAL FOR OAUOES TO STABluZE 03/22/90 18
[DG TRPPED WITH H10H TEMP.
SENSOR CAUBRATION YES PER SPECIAL REPORT 1-SEE NOTE 1 1 % t32 LUBE Ott ANNUNCIATED ERROR 91-01 l
l
DATE EDG A CAUSE G-ROOT CAUIE C-SSWLARITY D-TYPE C.00T CAUSE E-CCRRECTIVE ACTION ASSESSMENT PERFORbED_
ftTART8 03/23190 19 EDG TMPED WITH LOW SENSOR CAUORATION YES PER SPECIAL REPORT 1-SEE NOTE 1 1 90 134 PRES $URE JACKET WATER ERROR 91-01 Ale 0UNC8ATED 03/24/90 18 OPERATOR STOPPED EDG SENSOR CAUBRATION YES PER SPECIAL REPORT 1-SEE 900TE 1 1-90-130 AFTER RECEIVING 1994 JACKET ERROR 91-01 WATER TEMP. TRP ALARM WITM NORMAL TERF.
03/30/90 1A Tif EDO TRIPPED DUE TO OIE SEE COLUMN A CAUSE NO NONE REPLACEO VENTING TEMPERATURE SENSOR.
1-90 146 TEMPERATURE SENSOR FOR THIS START.
VENTING AND ANOTHER SENSOR LSIE BEING DISCOOSECTED POR TESTING.
THIS IS FURTHER DESCUMED IN NUfEG 1410.
04/12/90 2A EDG DtD NOT START DSTIALLY UNASLE TO YES PER SPECIAL REPORT 1-INCREASED AIR START VALVE CLEAR ANCE ONCE 2-90 055 DENTIFY CAUSE.
91-05 ROOT CAUSE WAs IDENTIFEO.
INADECUATE CLEARANCE OF <HE Ast START VALVES DETERMINED LATER.
_ 05/23f90 ta EDG TRIPPED SNORTLY AFTER SENSOR CAUBRATION YES PER EVENT REPORT # 1-SEE NOTE 1 90-07 & SPECIAL 1 90 158 START ERROR REPORT 190 09 06/23/90 18 EDG TRIPPED DUIW8G SENSOR CAU5 RATION YES PER EVENT REPORT 81-SEE NOTE 1 1-30-157 TROU8tKSHOOTING OF ERROR 90'07 & OC 1-940254 -
100,161, PREVIOUS FAEURE 162.104,
._185 Oen9/90 1A EDO DID 300T START FUEL RACKS TAPED No PER DC 1840276 is DISCOVERED AND REMOVEO TAPE AFTER NEMT 1-90 197 DUR300 PAINTING LER 190-14 START ATTEhPT FALED PROCESS 06H 9/90 1A EDG OID NOT START FUEL RACKS TAPED -
YES PER DC 1-30 027e &
DISCOVERED AND ret 00VED TAPE 1-90 188 DURING PAINT 946 LfA 19014 PROCESS l
07/05/90 is EOG DID NOT START INITIALLY UNASLE TO YES PER SPECIAL REPORT 1-INCHE ASED A4R START VALVE CLEARA*0CE DMCE -
I-90-191 IDENTIFY CAUSE.
90L05 MOOT CAUSE WAS IDENTW1ED. DEVELOPED i
WGADEOUATE PROCEDURE TO FUNCTIONALLY CHECK CLEARANCE OFTHE AIR l
START VALVES DETERMifGED LATEft.
l 07/11/90 2A EDG DID NOT START INITIALLY UN ASLE TO YES PER EVE 04T REPORT 2-INCREASED AIR START VALVE CLEARANCES ON 2-90'097 IDENTIFY CAUSE.
90-05, DC 2-3060087. &
ALL A EOGo. DEVELOPED PROCEDUltE TO INADEQUATE SPECIAL REPORT 1 FUNCTIONALLY CHECK DN PEftt000C SASIS.
1 j
CLEARA00CE OF THE AIR 05 START VALVES DETERMINED LATER.
07f19f90 la EDG WAS STOPPED DUE TO PROKEM WITH I
90 0 PER DC 1-90 0297 &
REPLACED VOLTAGE REGULATOR 1-90-104 KVAR SWINGS AT PULL LO AD VOLTAGE REGULATOR, SPEC $AL IEPORT 1-91 ONLY AT MfGH LOADS 01 i
i I
[
DATE ED3 A-CAueE D4 TOOT CAUSE C 54MILA2f7V O TYPE ROOT CAUSE E CORRECTIVE ACTION STARTF e
ASSEtimENT PETimMD 071197e0 13 TROUBLESNOOTING PREVIOUS PMOeLEM WFTH YES
- PER DC 1-90'0297 &
REPLAMO VOLTAGE RESULATDM T-90135 FArtuent VOLTAGE REOULAToot.
sPECIAL REPORT 1-91 ONLY AT ##0H LOADS 01 08/29/90 1A EDG STOPPED BY OPERATOR MALPUNCT1000 WITHS$
UNIUeOWN PER EVE 9ff REPORT 1-REPLACED THE VOLTAGE SEGULATOft 3-9019e DUE TO KVAR SPIKES TNE VOLTAGE 9411.DC1940338,&
RE00LATOR.
SPECIAL IWPO81T 1 TEIWWWNALS WERE os SHORTED DtNttNG TROUBIE9HOCTING WieCH CAUSED FURTHER DAMAGE esHtBIT30G DETERIMATION PetOcess 08/29/90 1A SPtKEs OCCUfWED DURING MALFUSGCTt000 WITNSO YES PER EVENT ftEPORT 1-REPLACED Ttt VOLTAGE NATOR l 90200 TROUBLESHOOT 990 RUN Yte! VOLTAGE 9411 ftEGULATOR.
TERMINALS WERE SHORTED DUIIN0G TROUSIESHOOTING WHICH CAUSED FURTHER DAMAGE INHIBITWeG DETERMINATION PetOCEss a
THE EDG TRIPS DISCUSSED IN THIS NOTE WERE DETERMINED TO BE RELATED TO THE ROOT CAUSE OF THE EDG FAILURE WHfCH GAVE NOTE 1:
3/20/90. CORRECTIVE ACTIONS ASSOCIATED WITH THESE TRIPS ARE DISCUSSEDIN NUREG-1410 AND THE EVENT REPORT 1-90003. SENSOR CAU8 RATED USING THE REVISED CAU8 RATION PROCEDURE DEVELOPED BY GPC BASED ON THE WYLE LASS TEST RESULTS AS DISCUSSED
}
A. WARD IN RESPONSE TO QUES 110NS RAISED BY THE BOARD IN ITS JUNE 9,1994 MEMORANDUM AND ORDER.
i
co3-es-1994 15:02 cROM SNC-VOGTLE ENG4.1C TO TELA P.02 i
t 53rzTap Crass OF AMak1G moos.ama samaecar comuzes&
zent
====== won kryCurner kun treumatis= mas==_
i Za the Battar of escoeza acerna oestyAur, at al.
beaket ause, so-434=ou -a a
s so-4:s-ou-s a
~
(Vogtle 31eetria eenerattag Plaat, het Ideense Amendment t
I (Tranafer to Daits 1 and 3)
Southers armoloar)
I a
ASLDP NO. 93-471-0E4-5 systenirre or sa==r m. L_---------
I, John G.
Aug'--*-- ;-e, being duly sworn, state as follows:
1.
I am currently employed by Southern Company services as Design Team Leader, Vogtle Project.
2.
I an duly authorised to verify Georgia power company's Besponse to Intervencr's seventh Request for Iraterrogatories, specifically the responses to Interrogatory Nos.
2.o., 3.b. and 3.c..
I hereby certify that the statements and opinions in such response are true and correct to the best of my personal knowledge and belief.
-A
- 31.,
Sworn to,and.o Abed before nasthis day of August, 1994.
otary p tlio
.Myocumissione.xpgFasI weemmtemana h
$^
ene.
9 v--r--v-r-
- --,r-se.-e%
.ww--?-m-w--e-e r-e++rg--
- - -ww 1-w-+wo-y--
rw e w-y--
w p.P w vt w'
= -g e v =e-
AUG-08-1994 14:10 FROM SNC-VOGTLE ENFLIC TO w
P. M 1
UEITED 891735 or aEER20A I
N90LE&E MasWL&WORY coo 0tI8s20K l
333g33 waru meemrea===nfr=== th_ xtum an 4
t l
2n the Matter of 2,
a esonora posEm coassaur, ah al.
Dookat. Wee. 50-434=OLh=3
's so-4as-osa-s
.e
{
4
's nae 2.ieanse amendment (Tegtle Electrie seaarating Plant, 3 (framarer te
i,,
Units 1 and 3) s
-Southern suelear)
(
i t
AsLBW No.98-471 0LA-3 1s9YtnATTP gy amarus 1, navEny
~
<./'
- k. !
I, James A. sailey, being duly sworn, state as follows:-
i e
2.
I am currently employed by southern Wuolear operating j
company as Manager-Licensing, Vogtle Project.
f l
3.
I an euly authorized to verify. Georgia Power m =iy's-4 mesponse to Intervanor's seventh magpinet.for Interrogatories, m' c.,
.. itically. the responses to Interrogatory pos. 2.a. and 3 b spea l
I hereby certify that the statements and opinions in such i
1 l
response are true and correct to the best of my-personal i
t j
knowledge and belief, i
i
}
j
/ James A. seiley
=
i sworn to-and a i
befera me this gibed day of August, 1994.
YOhM k.
Y j
Notar 9 -
W ".y PublicM 12S9. W- :
l 1
A1
/N h
l i,
l o
e 4.
i a
a s
i j
TOT 4 P.07 i
p9 3 3 1994 14:09 FPCr1 SNC-VCGTLE ENG4 IC TO N
UNTIED STATES OF AhERICA NUCLEAR REGULATORY. COMMISSION RINORT THE ATOMTC BAstri AND TWmG7NG BOAnn l
In the Matter er i
t Docket Nos. 81M24 OLA4 GEORGIA POWER COMPAhT. at al.
- t Bar Licanes Am==d===t (Vogtle Electria Gemarating Plant, 2
(hansfWto Units 1 and 3 Southern Naciesr) t i
ASLBP NO. 93-6710LA-3 AFFfDAVIT OF GEnRAM BfrrWafM. fB.
I, George Dockhold, k., being duly sworn, stats as fbuows:
1.
I am cunently employed by Southern Nuclear Operadng %,~My as General Maanger, Nuclear Technical Support.
2.
I am duly authoriand 2 verify Georgia Power Company's Bespones to Intervener's Sevemb Request for Imarrogatodos, ?.=M-s y the mponses to Intearogat u
Nos. 2.a., 2.b., 2.c., 3.b., 3.c., and 11.
I hereby certify that the statements and opinions la such aspones are true and conect to the best of my personal knowledge and belief.
osari. soc =hed u. -
Sworn ter and su}senbod beibes mesidad, day of August,1994i..
h M i
- Nomry Pdpuc My @' aspires:
w m, - -..........,,....
9
- ebeusses owenom g
8
-me.
AUG-08-1994 14*17 FROr1 SNC-VOGTLE ENG4 IC TO TSLA P.03 i
August 8,1994
{
UNITED STATBS OF AMERICA i
NUCLJiAR REGULATORY COMMI55 TON unw. the Atemte safee, una f f=,ntn werd
)
In the Maner of
)
Docket Nos. 30424GLA-3
)
504254.A,-3 2
OlsORGIA POWER COMPANY, )
et al.
)
Es: Usenes Arpande
)
(Tnasfer as southem (Vogtle Electdc Generadng
)
Nuclear)
Plant, Urdts ! and 2)
)
)
ASulP No. 93471-01 OLA-3 M OF EENNETH S. BURR I, Esaneth $. Burr, belag duly swom, sats as follows:
1.
I am cunendy employed by the Southern Nuclear Operadas Company, as s
Senior P Woct Engineer, Neelear Maistesanos and Support Vogde.
2.
I am duty assharh=d to verify Georgis Power Way's Response to N
Intervenar's Sevemh Request for Interrogatories, spealAcaHy the responses to b %.r Nos. 1, 2.a., 2.b., 3.c., 4., 5., 7., 8., and 12.
I hereby certify that the statements and @ha in such respones are trus and conect to the best of my personal knowledes and belief.
Kenneth S. Burf Swom to and subsmibed before me tidi_1,_ day of August,1994....
AM Notary Puhtc..,
,MT..
"M mav
- -..,ee -
1
~
TOT 4 P.03
AUG-09-1994 17:30 FROM VOGTLE TECH. SUPPORT TO 9-1.104-955-3900 P.05 w u overen sv r
- g-e-g4 ; 3
- ggpg ;
4g433g33g g gg I
UNITSD STATES OF AMIRIC&
NUCLEAR REGULATORY 00MMISS10N mapena cru accarve mauss, urn trannus mmun In the Matter of a
GEOReZA POWER courant, 11 al.
Dooket Wes. so-da4-onn-3 50=4as-OLa*3 a
Re: Lioesse Amendment (Vogtle Blestrie saaetating plant, i
(Trameter to 13 nits 1 mai 2)
Southern Nuclear) t 3
ASLEP WD. 93-5*/1-OL1=3 mwwvenvre er enatum.= Tmsv I, Charles Coursey, being duly sworn, state as follows:
1.
I am currently employed by Georgia Power Company as Maintenance superintendent, Vogtle Electric Generating Plant.
2.
I an duly authorised to verify Georgia Power company's Response to Intervanor's seventh Request for Interrogatories, l'
specifically the responses to Interrogatory Noa. 4. and 5.
I hereby certify that the statements and opinions in such 1
response are true and correct to the best of my personal knowledge and belief.
$L Charles Courney sworn to and subs bed before me this 4
of Au t,f994.
]
kot=sy DA&o 5%'iYi/M W%,RettotutCtnney, %
, ~.'
.m..
.f.
1-
-'Egires.AJy21,19;g
~~
i *, -, C Y
.Vg
. -4., :
a h "'"' I f
i -y C-~
.,E
~
? M ;..m}
$E.?
~,72
,, N.: - : p /
O$
f$
=
'-+
=m t-----
+riw-r1
- -e1-w---e94-eer wmam*-1-W e-*-ra*W-em ze
- ea e-r+r*w-tW'a-
i
. G..-03.1994 17:32 FROM VOGTLE TECH. SUPPORT TO 9-1 104-885-3900 P.10 AU 4
... o..
wr
, 9 o wr. 6 16#vro ;
4048653581H 700 829 35S9:8 t.
i UMITED ST&TSS OF AMERICE k
NOCLEAR RSSULATORY COEM3SSION mener== enn n cc 1e amener man L26-am mamun 1
a In the Matter of i
{
5302621 POWER CONFANY, at al.
Donket mos. 50-484-oLa-3 i
t 80-435-OLA-3 a
(Vogtle Electrie eenerating utent, s a
he: Limense Amendmeat
{
taats 1 ame 2)
(Tesamfor te i
Southera muelaar) i 8
t i
ASL57 NO.93-571 OL&=3 Ayyrnavre or ura==mr. n. acwaw 4
i I, Richael D. Duncan, being duly sworn, state as follows:
1 1.
I au currently employed by Georgia Power company as i
4 Instrument & controls Supervisor, Vogtle Electric Generating Plant.
4 i
2.
I an duly authorised to verify Georgia Power Company's Response to Intervencr's Seventh Request for Interrogatories, specifically the responses to Interrogatory Nos. 3 4., 9. and 10.
I hereby certify that the statements and opinions in such response are true and correct to the best of my personal knowledge and belief.
d h
AA M Y ^
Michael D. Duncan
~
sworn to and subs bed before ne this day
'"9)hgqpts j
NetAry to
//
My cousi turpi
- je v 4 A i. fMY
, c.
~
m pseen;,wo'mwe". se ~
- f. d.: ~ c.,~.) ~~ r w
OpusJJr 21.18M f "/ :- i ^ ?\\
5:
-. I::- E II 2.,' $~ ! $h E s;.
s
~
4
% y._J'
^.G
~Q-[-';'.7"l 2
.. ~
~
ALG-OS-1994 17:29 FROM UOGTLE TECH. SUPPORT TO 9-1-404-885-3900 P.03 ocm cus7sn vv
- g-g.g4 ; pgSpH i 4045583589*
706 626 858 Star !
CN37ED STATES OF AM2RICA NUCL32R REGULATORY COMMI5SZOW
(
EEPann Tus amfnrTe anwi awn tronwars-nomun i
l 1
In the Matter of 83ORGZA POWER CONFANT, at 31 Dookot Mos. 30-424-QLA-3 a
t 80-415-OL1-3 (Yegtle uteetrie senarating Plant, Re Lisease Amendmont Units 1 and 2) i (Transrar to Southern kuolear)
ASLBP No. 93-574-OIJL-3 arr m vry or vir'w m L.
monks
, Michael L. Robbs, being duly avorn, stats as follows:
1.
I an currently employed by Georgia Power Company as Instument & controls superintendent, Vogtle Bisotric Generating Plant.
2.
I an duly authorized to verify Georgia Power Company's Response to Intervenor's seventh Request for Interrogatories specifically the responses to Interrogatory Mos.
3.a.,
4.,
S.,
9 and 10.
I hereby certify that the statements and opinions in such response are true and correct to the best f my pers nal knowledge and belief.
f N
[;
t Michael L. Hobbs sworn to and subs bed before me this _.._ day ofAEuv a k, 1994./
st N"t.a ubl;.c o
My ion iras u
s I.
/49
- ,.'."~.::.,. '. '. >
%N
- .,."'*.?lMi,W (F
e E S Kin c
m;
- 5. "..
' ?
'5 h y Q+. '*/ ~. E E
'., yw';y -
i
~,,. _ ',. -
M~2,I,1[n b i
9-1-404-865-3900 P.04 8-I1 PM 4048B5355EH 706 028 3689;s 6 s
4 l
UNITED STATES OF AMBRICA NUCLB&R REGUIATORY 00lotZesEON
===ome ww= r m e amme-, mwn nramwa m man =3 4
In the Matter of s
8303021 POWER 000EPANY, at al.
Docket Nos. Sp=424-OLA-3 a
5 0=42 5=01A-3 s
(Vogtie 31estrio seaerating *Laat, Re: Linease Anemensat Daits 1 and s) termaefer to a
i southera muelear)
I 3
ASLBP NO. 93=571-OL&=3
, _ m.
.... _l0 Mttp -5'/
_s Yo64Y
/,lcua d I, J.E. ".Oleuim, being duly sworn, state as follows 1.
I am currently employed by Georgia Power Company as Mechanic, vogtle Electric Generating Plant.
2.
I an duly authorised to verify Georgia Power Company's Response to Intervonor's seventh Requent for Interrogatories specifically the responses to Interrogatory Nos. 7 and S.
I hereby certify that the statements and opinions in such response are trus and correct to the best of my personal knowledge and belief.
...,1){_
i r.
Sw se.orn to and subscribed k
e.e es _ada a
My ion B/,
N
....,~.~.f,<,
e e
l S~/ c b ~.-l\\
=
~
k
~
-.==
[ ~5 h
~ :..
~'~
o L;
~~^
.f.
. - i, {-f r
%,lC'_ '.:,-M. 9-(.I
~
9-e w+'-e--
t e
en-wp-'w--
-erw-'h ww w'
-NW-fm w' Wee *'W---'euwvww -svww--en*-w e w mma wwrw-'tevwNT==m'
- WWE 9D-*-*='"'
1=mrrev-
-.s m
AUG-08-1994 14:08 FROM SNC-VCGTLE ENG4 !C TO TSLA P.03
~
i UNITED STATES OF AMERICA NUCLEAR REGULATORY ConOGBSION wwwnna TRr Amme hiiiV AND r v em anAnn i
In the Master of 1
GEORGIA POWER COMPANY $ al. : Docket Nes. 5
- OL44 3M184LA 3 i
I t
Ese IJeemos Amendment j
(Vestle Bestric M_ :-: Plaat, 3
(Transfer to i
Units 1 and 2) i Southern Nocteer)
ASLEP NO. 96471 OIA-3 1
1 ApptraAVIT OF lufEfMAwr. W. Wi--tun i
I, Michaal W. Norton, being duly swom, stats as fbliows:
d
\\
1.
I am W employed by Southem Nuolour Openting Company as Pudent 4
{
Manager - Nuclear Testmica15ervices.
,i j
2.
i I am duly authodaad to verify Georgia Power Company's Response to intnerenor's Seventh Raquest for WMa, specifloally the responses to InM' 1
Nos. 2.a., 2.b. and 3.c.
s N
In t
to the best at my personal knowledsa and belist.
t f
R n
i i)
L 2
uwm.i w. r ion M
$0d j
beAmo ras this 2 day or i
August,1994 jr o.
My Naspires:
}
gjar mA= -
..m
.o
-...r....,
v eg ewys 5
d j
i k
i 6 ise l
4
l AUG-09-1994 17:40 FROM VOSTLE TECH. SLFPORT TO 9-1-404-895-3900 P.02 SENT SY:4Ntt wp i g-p.g4 : 1:32DN i 4049593889*
'l00 826 36 asis 7 s
i i
tlNITED STATES OF AMBRICA NUOLEAR REGtfLaTORT CCIDCISSION 5
amenom van s,ennte nn-ry mwn rremmarus annan u
In the Matter of a
eEcanza POWER conspAarr, ak 31 Denket res. so-434=oLh-s i
so-433 oLn=3 Re License Amendment (Vegtle 31ectrio semerating Plant, I
(Transfer to Dmita 1 sad 2)
Southern Wuolear)
I t
18L37 30. 93-871=0Ln-3 myyrnavre er u. a. un.x- --
I, W.P. Kitchens, being duly sworn, state as follows:
1.
I am currently esPlayed by Georgia Power company as Assistant General Manager - Plant Support, Vogtle Electric sonorating Plant.
2.
I an duly authorised to verify Georgia Power Company's Response to Intervenor's seventh Request for Interrogatories, specifically the responses to Interrogatory Nos.
2.a.,
2.b.,
2.c.,
3.a.,
3.b., and 3.c.
I hereby certify that the statements and opinions in such response are true and correct to the boot of my personal knowledge and belief.
W h 8/ehv Sworn to and subscribed before me this g day of 994.
//)L, ECM 11C G*
My ae ne 1 e'Tn/ W e2. I f
,?
' '5:l a
Genes g
,- )
i..
.E
?-
~
5 J.
~,
2
- L.
5
~G:'., 9 x. ' A j q
~ ~ ~ '
. i.
.o....,.. i
, '. i_
TOTAL P.02
AUG-09-1994 17:31 FROM VOGTLE TECH. StPPORT TO 9-1 204-685-3900 P.07 vsm v i.mn cv e-
- e-g-g4 ; 3
- 3gpg ;
40488535a8*
706 825 3589'# B i
UNITED STAfts DF AMERICh NUCLEAR AEGULATORY QQMK!a8 EON nurm e Tum nouve am;,11 m Lia==r-- n= =y In the Matter of I
StoneIA POWER ocNFANY, Ah EL.
Docket Nos. 50-424-OLA=3 t
50=435-OLA-3 Re Liosase Amendment (vogtle alastris generating Plant, :
Units a and 3)
(Transfer to southern Nuclear) a ASLB9 No. 93-574-OLR=3 aryrhavrT or am M. * -- a-v I, Paul M. Kochary, being duly sworn, state as follows:
1.
I am currently employed by Georgia Power Company as Engineering supervisor, vogtle 21ectric Generating Plant.
2.
I am duly authorissa to verify Georgia Power Company's Response to Intervenor's Seventh Request for Intarrogatories, specifically the responses to Interrogatory Nos.
2.a.,
2.b.,
3.c.,
4.,
5.,
6., and 7.
I hareby certify that the statements and opinions in such response are true and correct to the best of my personal knowledge and belief.
)
jaw W*
Paul M. Kochery f Sworn to and a bed before no this da of A gusts 1994.
l.
1-14/15 K 1lo Publio
'PJ7" "IPh "Y
TI2t?"6 l,MW
...:. ~., - --a..
! * / -~ 3
'g..,_.n
- c 4
..i 5~E <
i SIE
~
~~;
T. '--
93 f
b,
. I f
. s- ~., 3
.'.... - $/{: ~
_mg.
1 - - -
l pyG-ga..1994 17:29 FPCr1 UOGTLE TECH. SUPPORT TO 9-1-ac4-895-3903 P 02 j
i n au -
. o-e-v4 i 'tiUVAM :
4048653589*
700 826 3686t# 2 1
UNITED STATES OF AKERICA
)
NUCLIAR REGULAToar coactIssION l
j ansonn 'Mrs meevve navnTY nim trm -afwa Enhah 1
i 1
i l
2a the Matter of 4
i 1
3 GEORGI 4 POWER COMPANY, 3.t 11.
Dooket ages, so=424-OLA-3 I
S0-485-OL&-3 I
8 e
i t
het License Amendment (Yogtle Electric generating Plant, I
(Transfer te j
4{-
Faits 1 and I) 1 Southers Nuclear) t j
i ASL37 30, 93-571-OLA=3 j
m.[..
i arpinavis or panL n. non new 4
2, Ptul D. Rushton, being duly sworn, state as follove:
1 1.
i I am currently maployed by coorgia Power company as Shift superintendent, Vogtle nectric Generating Plant.
2.
I an duly authorised to verify Georgia Power company's i
Response to Intervanor's seventh Request for Interrogatories, i
specifically the responses to Interrogatory Nos. 2.e. and 3.D.
1 a
j i
I hereby certify that the staternents and opinions in such responsa are true and correct to the best of my personal knowledge and belief.
l Y/
)
Paul D. Ruanton sworn to and subscribed before na this _ 7 6 day
'4 $'
Notar
- ""y Pub o
"*"r*>"/ "_*R{W hN 9e f-:A j
/d.%..~....4 ~c.i.
h 9
g
. $m
- , =
a 5 ~~ *
.l.
}
5 %.
-'.' - 2
. O 5" Ti 5
.~ :
I
" * "/
.h e
.%, $,
- y....y f-'
.,, w.
.,c a
--... -.94RJG-08-19.. 17:31 FROMVOGTLE TECH. SUPPORT TO 9-1-404-885-3'JOO P. 0t5
.v,-
, g g
,c, i li W M i 404BB5858b 706 023 3669:#10 IntttED STATES OR kKER101 NUCLEAR REQULATORY COMM%SSISM aureau vna amoure anyhz mun trei..raa annen In the Matter of I
GBORGIA POWER CouPANY,.31 al.
Decket Nos. 50-434-OLA=3 t
Ets1ana2) 50-4as-OL1=3 5
i 1e Electris sentrating Plant, Res Liosase Amendment t
t (Transfer to southern Muslaar)
RSL37 No. 93=671-01.A=3 Arnnane or wwwnr smurnam7 t, Mehdi Shelbani, being duly sworn, rtate as follows:
1.
I am currently employed by Georgia Power company as Engineering supervisor, Vogt1s Electric Generating Plant.
2.
I am duly authorized to verify Georgia Powar conpany's Response to Intervenor's Seventh Request for Interrogatorias, specifically the response to Interrogatory No. 13.
I hereby certify that the statements and opinione in such response are true and correct to the best of my personal knowledge and belief.
p
{
f WPY bN
.teJdi Shelbani Sworn to and subs bed before me is
%y ofAyst 1994 b///fd-nota Publes
v-
'"Mf*'b%ed pesamdumonacemr.eengis e
apssmy si.1 ss
,...,,. ;. c,;..
,..3
- i
.3 3. v,9 E~:
. I: 5
~
e=
1 ~.~;. 5 - E : El
~
W'q.,9 4....$f
[. v
~h~ yf,.[i
' ' ' ~ '
sew
~
j AUG-09-1994 17:31 FROM UOGTLE TECH. SLFPORT TO 9-1-40o-885-3900 P.08 wwie wi.*sen ev e
, g g-g ; 1:3gpy ;
4948853589*
70s gag 35gg;s11 1
J I
i I
UNITED STATES OF AMERICA l
NUCLana AseULhTQEY COXKISSION meenan TME 1'PobfTo armwBfT 1 fD i
LT6"Ti-s imm*M i
In the Matter of
+
a 4
4 530R424 POWIk OcttPANY, Ali A1.
Deeket Nes. 80-484=OLA=3 s
50-425=oLA-3 3
tYogtle Electric Generating Plant, Res Llosase s===d===t s
i s
Unite 1 and 2)
(Transfer to Southera anselear)
\\
8 i
t A5L82 NO. 93 = 873 *=0LA-3 arnnavir or k---
1.
- c. Eisun i
k 1
I, Kenneth c. Stokes, being duly sworn, state as follows:
j 1.
I am currently employed by Georgia Power Company as 4
Senior 2ngineer, Vogtle Electric Generating Plant.
g 2.
f I an duly authorised to verify Georgia Power company's
{
Response to Intervencr's Seventh Request for Interrogatories, epecifically the responses to Interrogatory Nos.
1.,
2.a.,
3.b.,
j 3.c.,
4.,
5.,
7.,
S., and 12.
l
{
I hereby certify that the statements and opinions in such i
{
response are true and correct to the best of my personal i
knowledge and belief.
i i
b i
xenneo c..toxe.
sworn to end subs bed before as this of August,r1994 day i
ll < *'
i WM i
Rosney y lio 7
Myoceafganexpig,:
71.2}~.,..g.
m c,
'n e
w w/ =,. m s n/,.
~.. ~
~
5, g y... %, 4, 2 m
4 i
. -. - ~.. - -
RUG-OB-1994 14:08 FR31 Stf-VO3TLE EtG4.IC TO N
UNITED STATES OF AMEKfCA July 20,1994 NUCLEAR REGUL w m. r - - m.ATORY tmursernN a
w r 1-
= =u
)
in the Matter of
)
Decist Nos, Soci 9LA-3
)
N3 i
GIKMtGIA POWER COMPANY. )
l etal.
)
Re: r.imm. Aman,hnant
)
(Tianssar to Southam (Vostle Eastric rwe
)
Nacisar)
Plant, Units 1 and 2)
)-
)
AELEP No. 93-67101 OLA-3 ApprhAVIT OF TJWlf A. WADn I, Imwis A. Ward, having Arst been duly sworn, hereby depoos and state as fo!!ow 1.
I am employed by Southam Nuclear Operadag "my as Manager, Nuclear i.am daly authorised to vedfy Georgia Power cornpany's magp 2.
ana w 2nnevanor's swene maquest forIntumsandes, speaMeally the responses e 2.n. and 3.b.
I hemby certify that to statements and optalons in such responso am trus and ooi tbs best of tny personal knowledge and belief.
Sworn to and IAwis A. Ward
~
bs8ses me tids day of August,1994.
N M d%~
w,m.
Micommisslan aspires:
7lrn-C = 3.199 9
./
A 1
/. n,
s e
'T'dF5 5
55 1
~,
,-e-,,
.<-an-
~,.w,
.--..-m s,,.e,,-a.w,.
..,.=...2
..-.,,,.m-m um,u s-
- - - _ _ ~ = - -
2
=_mm----,,
4,--
......-e
.__a..
. + - _.A u._,u i
l
~
DOCKETED USHRC I
UNITED STATES OF AMERICA 94
-9 P2 :55 NUCLEAR REGULATORY COMMISSION
- Before the Atomic Safety and Licensine Board 0FFICE OF SECPETARY DOCKETING & EERVICE BRANCli
)
In the Matter of
)
Docket Nos. 50-424-OLA-3
)
50-425-0LA-3 GEORGIA POWER COMPANY, )
etal.
)
Re: License Amendment
)
(Transfer to Southern (Vogtle Electric Generating
)
Nuclear)
Plant, Units 1 and 2)
)
)
- ASLBP No. 93-671-01-OLA-3 CERTIFICATE OF SERVICE I hereby certify that copies of Georgia Power Company's Response to Intervenor's Seventh Request for Interrogatories, dated August 8,1994, were served by express mail upon the persons listed on the attached service list this 8th day of August,1994, i
=
1 l
Thomas L. Penland, Jr.
[
TROUTMAN SANDERS Suite 5200 600 Peachtree Street, N.E.
Atlanta, GA 30308-2216 (404) 885-3471 l
l l
l
i*
1-i I
UNITED STATES OF AMERICA
]
NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD l
In the Matter of GEORGIA POWER COMPANY, Docket Nos. 50-424-OLA-3 gg gl, 50-425-OLA-3
]
(Vogtle Electric Re: License Amendment (Transfer to Southern Generating Plant, j
Units 1 and 2)
Nuclear) l ASLBP No. 93-671-01-OLA-3 SERVICE LIST
{
Administrative Judge Stewart D.
Ebneter i
Peter B. Bloch, Chairman Regional Administrator Atomic Safety and Licensing USNRC, Region II Board 101 Marietta Street, NW U.S. Nuclear Regulatory Suite 2900 Commission Atlanta, Georgia 30303 Two White Flint North s
11545 Rockville Pike Office of the Secretary j
Rockville, MD 20852 U.S.
Nuclear Regulatory i
Commission l
Administrative Judge Washington, D.
C.
20555 j
James H. Carpenter ATTN:
Docketing and 1
Atomic Safety and Licensing Services Branch Board 933 Green Point Drive Charles Barth, Esq.
i i
Oyster Point Office of General Counsel Sunset Beach, NC 28468 One White Flint North Stop 15B18 l
Administrative Judge U.S. Nuclear Regulatory Thomas D. Murphy Commission l
Atomic Safety and Licensing Washington, D.
C.
20555 Board
)
U.S.
Nuclear Regulatory
- Director, i
Commission Environmental Protection Two White Flint North Division i
11545 Rockville Pike Department of Natural l
Rockville, MD 20852 Resources 205 Butler Street, S.E.
Michael D. Kohn, Esq.
Suite 1252 Kohn, Kohn & Colapinto, P.C.
Atlanta, Georgia 30334
]
517 Florida Avenue, N.W.
Washington, D.C.
20001 l
Office of Commission Appellate Adjudication One White Flint North l
11555 Rockville Pike Rockville, MD 20852
.