ML20072A168

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures FPN-0-EIP-28, Recovery - Technical Support Ctr, FPN-0-EIP-16, Emergency Equipment & Supplies & FPN-0-EIP-13, Fire Emergencies
ML20072A168
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/13/1982
From: Hudspeth J
ALABAMA POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20072A165 List:
References
NUDOCS 8301030138
Download: ML20072A168 (1)


Text

_

l L

2] Lag AlabamaPower the Southctn electnC Sy:!cm December 13, 1982 Director NRR Suclear Reactor Relations L'SMRC

?hillips Building 7'920 Norfolk Avenue 3ethesda, MD 20014 I

Jear Sir:

In accordance with Alabama Power Company Administrative

?rocedure FNP-0-AP-4, Control of Plant D30uments and Records, attached are new revisions to plant procedures.

Please verify that you have the procedures with the

orresponding copy numbers that are listed on the Document Transmittal Form.

Please sign and return the forms as soon as possible to

no following address:

Alabama Power Qompany Farley Nuclear Plant Box 470 Ashford, AL 36312 ATTN:

Document Control Supervisor l

If you should have any questions, please call me at 205) 899-5156 Ext. 422.

i Sincerely, MM N

Joep B. /Hudspety 0

FNP Document Control Supervisor 73H:hre Larry W.

Enfinger h

File i

l (C) 8301030138 821222

-7 PDR ADOCK 05000348 p

PDR

.+

j I