Forwards Proposed Remedial Soils Work Activity Lists for June & Jul 1983,per ASLB 830430 Order,For Review,Comment & Authorization
ML20072A003
Person / Time
Site: Midland
Issue date: 06/01/1983
From: Mooney J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6718, NUDOCS 8306090321
Download: ML20072A003 (23)


Text

-

.M x

CDRSum8lS Power iga,s.c,eatstars1 Company raa stig i

i, (D/Ra SCS V

Midland Project: PO Box 1963. Midland, MI 48640 * (517) 631-8650 I

[DW%

RC oPeise OE ML June 1, 1983 OL FILE i s 4

Mr J J Harrison blidland Project Section U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellym, IL 60137 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AlTI110RIZATION File: 0485.16 UFI: 42*05*22*04 Serial: CSC-6718 12*32 We are enclosing the proposed list of work in accordance with the "NRC and CPCo Work Authorization Procedure" for the period between June 1, 1983 and June 30, 1983. Please review this work list and authorize the specific work items as established in the procedure.

Also enclosed is a Supplemental Work Activity List for July 1983. Your review, comments and authorization of the specific work items as in accordance i

with the procedure are similarly requested.

oog J. A. Mooney Executive hhnager l

Midland Project Office Attachments JUN 61983 C306090321 830601 PDR ADOCK 05000329 O,

A PDR

/

Y$

1 Consumers Power Company Attachment to Serial CSC-6718 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983 AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION GENERAL QUALITY PROGRAM 102351100 Approval of MPQP-2, Rev 1 A(10/22/82) 102351120 Approval of MPQP-1, Rev 6 AUXILIARY CUILDING & FIVP UNDERPINNING PROGRAM ACCESS SHAFTS 105050906 Redress the slope lay back surfaces A (3/17/83)

WEST FIVP 102150010 Install Anchor Bolts & Rods 1 (8/12/82) A (8/13/82)

(includes hardness test on rods, drill concrete & steel and tensioning)

EAST FIVP 112150010 Install Anchor Bolts & Rods 1 (8/12/82) A (8/13/82)

(includes hardness tests on rods, drill concrete & steel, and tension)

CONTROL TOWER POST TENSION VERIFICATION 102550203 Verify Post Tension Loads A (2/22/83) exi,0882-2439d173-12 JEKostielney 05/24/83

2-j Consumers Power Company Attachment to Serial CSC-6718-l Midland Plant Units 1 & 2 i

j WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983 AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 1

)

162550010 WEST TURBINE / AUX BUILDING PIPE TURNNEL MODIFICATION 1

Install Platform at El 600' 1 (4/5/83) A (4/20/83) l (includes installation of Pipe Tunnel Reinforcement, i

cutting of opening, Modification of Handrails and Ladder and Protection of Existing Piping) 152550010 EAST TURBINE / AUX BUILDING PIPE TUNNEL MODIFICATION 3

2 Install Platform at El 600' 1 (4/5/83) A (4/20/83) l (includes installation of Pipe Tunnel Reinforcement, cutting of opening, Modification of Handrails and Ladder and Protection of Existing Piping) 1 1

BUILDING MONITORING 136050043 Maintain Instrument System 3 (8/12/82) A (8/12/82) i j

132550027 Install strain gauges and terminate cables l

(includen testing and calibration) 132550050 Install, wire conduit and raceway from pier 2(12/13/82) A(12/13/82) i to data room for Pier Instrumentation 165052021 Terminate Cables in Data Room & Terminal Boxes A (3/10/83)

& Pier Instrumentation GENERAL TEMPORARY DEWATERING i

125150050 Continue Monitoring Utility Protection Pits (4) 3 (8/12/82) A (8/12/82) 115150020 Continue Operation of Freeze System & Wells 3 (8/12/82) A (8/12/82) 1 522550025 Excavate, Repair and Backfill Piezometer MP-2 1 (4/5/83)

. mi0882-2439d173-12 JEKostielney 05/24/83

3 Consumers Power Company Attachment to Serial CSC-6718 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983'AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982-NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 522550020 Repair Six (6) Existing Observation Wells (WB-1, WP-2, COE-10, PD-18, W-2, PD-38) 1 (4/5/83) 125150051 Install Clay to Below Duct Bank (pit 4) 1 (8/12/82) 125150052 Repair Ductbank (Pit 4) 1 (8/25/82)

(includes excavate, drift, repair and backfill) 115150026 Remove 36" Casing and Backfill 42" Hole 1 (9/17/82) 115150025 Clean out and backfill abandoned ejector holes (ME26A, ME28A and ME54)

R CRACK MAPPING (includes scaffolding platforms, ladders and extra-ordinary clean up) 102250200 EPA (East & West) 3 (8/12/82) A (8/12/82) 102250105 FIVP (East & West) 3 (8/12/82) A (8/12/82) 102250100 Control Tower & Remainder of. Aux Bldg 3 (8/12/82) A (8/12/82)

PIER 12W 165054010 Install & Load Pier 12W3 l'(8/12/82) A (12/9/82)

PIER 11W 165054015 Install & Load Pier 11W3 1 (8/25/82) A (2/22/83)

(includes install bituminous plywood forms) 105050908 Perform Pier Load Test 1 (8/25/82) A (5/2/83) miO882-2439d173-12 JEKostielney 05/24/83

4 Consumers Power Cozpany Attachment to Serial CSC-6718 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR TIIE PERIOD BETWEEN JUNE 1, 1983 AND JUNE 30, 1983 DEVELOPED IN COMPL1ANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER 9W I

165054005 Install & Load Pier 9W3 1 (9/17/82) A (2/24/83)

PIER 12E 155054010 Install & Load Pier 12E3 1 (8/12/82) A (12/9/82)

PIER 11E l

155054015 Install & Load Pier 11E 1 (8/25/82) A (2/22/83) 3 PIER 9E 155054005 Install & Load Pier 9E3 1 (9/17/82) A (2/24/83)

PIER 8E 155052025 Drift from Pier 9E to Pier 8E1 1 (9/17/82) A (4/7/83) 155053020 Excavate Pier 8E2 1 (9/17/82) A (5/3/83) 155054020 Install & Load Pier 8E3 1 (9/17/82) A (5/3/83)

GRILLAGE STRUCTURE AT PIER 8E 155052305 Drift for and Install Bulkhead from Pier 8E north to 1 (9/17/82)

Containment Wal]1 155059025 Excavate and Remove Mudslab for Grillage Beams Between 1 (9/17/82)

Pier 8E and Containmentl 2

155053025 Excavate for Support Columns next to Containment 1 (9/17/82) 155055003 Install Steel Support Columns next to Containment 1 (9/17/82) 155055010 Install & Load Grillage Structure at Pier 8E 1 (9/17/82) miO882-2439d173-12 JEKostielney 05/24/83

m

\\

l 5

Consumers Power Company Attachment to Serial CSC-6718 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983 AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 i

NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS

' IDENTIFIER PROGRAM, WORK AREA & ACTIVITY

. DESIGNATION PIER 8W 165052025 Drift-from Pier 9W to Pier 8W1 1 (9/17/82) A (4/7/83) 165053020 Excavate Pier 8W2 1 (9/17/82) A (5/3/83) 165054020 Install & Load Pier 8W3 1 (9/17/82) A (5/3/83)

GRILLAGE STRUCTURE AT PIER 8W 165052305 Drift for and Install Bulkhead from Pier 8W north to 1 (9/17/82)

Containment Walli l

165059025 Excavate and Remove Mudslab for Grillage Beams Between 1 (9/17/82)

Pier 8W and Containmenti 165053025 Excavate for Support Columns next to Containment 2 1 (9/17/82) 165055003 Install Steel Support Columns next to Containment 1 (9/17/82) 165055010 Install & Load Grillage Structure at Pier 8W 1 (9/17/82)

EXCAVATION ZONES 155052020 Excavate / Lag Zone Y1 1 (4/5/83) 165052020 Excavate / Lag Zone Z1 1 (4/5/83) 165056375 Excavate / Lag Zone Z2 155056375 Excavate / Lag Zone Y2

)mi,0882-2439d173-12 JEKostielney 05/24/83

6 Consumers Power Coxpany Attachment to Serial CSC-6718 Midland Plant Units 1 & 2 WCRK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983 AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982

' NEW OR ACTIVITY

PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER W10 1

165052050 Install W10 Bulkhead 1 (4/5/83)

A (5/3/83) 165053035 Excavate Pier 10W2 1 (9/17/82) A (5/3/83) 165054030 Install & Load Pier 10W3 1 (4/5/83)

A (5/3/83)

PIER E10 155052050 Install E10 Bulkhead 1 (4/5/83)

A (5/3/83) 155053035 Excavate Pier 10E2 1 (9/17/82) A (5/3/83)-

155054030 Install & Load Pier 10E3 1 (4/5/83)

A (5/3/83)

BEAM CONNECTIONS 102250203 Modify Beam Connections at elev 659 ( 2 connections) 2 (12/13/82) A (4/13/83) 102250205 Modify Beam Connections at elev 704 (10 connections) 2 (12/13/82) A (4/13/83) i SLAB Modification at El 659.0' 102250208 Survey / Layout for Engineering Review in Preparation for Slab Fix @ El 659 3 (4/3/83)

A (4/5/83) l PIER KC2 165052325 Drift from West Access Shaft to Pier KC2 1 1 (9/17/82) A (4/22/83) j 165053320 Excavate Pier KC22 1 (9/17/82) A (4/22/83) 165054315 Install & Load Pier KC23 1 (9/17/82) A (4/22/83) i mi0882-2439d173-12 JEKostielney 05/24/83

7 Consumers Power Company' Attachment to Serial CSC-6718 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983 AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III

~ REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER KC11 l

155052325 Drift from East Access Shaft to Pier KC111 1 (9/17/82) A (4/22/83) 155053320 Excavate Pier KC112 1 (9/17/82) A (4/22/83) 155054315 Install & Load Pier KC113 1 (9/17/82) A (4/22/83) l PIER KC3 i

l 165052310 Drift to KC3 from W81 A (4/22/83) 165053310 Excavate Pier KC32 A (4/22/83) l 165054305 Install & Load KC33 A (4/22/83)

PIER KC10 155052310 Drift to KC10 from E81 A (4/22/83) 155053310 Excavate Pier KC102 A'(4/22/83) i 155054305 Install & Load KC102 A (4/22/83)-

PIER W14 165052057 Drift from West Access Shaft to Pier W141 (includes Access Pint) 165053055 Excavate Pier W142 165054050 Install Pier W14 miO882-2439d173-12 JEKostielney 05/24/83 4

8

' Consumers' Power Company Attachment'to' Serial CSC-6718' Midland Plant Units 1 & 2

-WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE.1, 1983 AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB. ORDER OF APRIL 30, 1982

.NEW OR ACTIVITY PREVIOUS REGION.III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION ~

PIER E14 155052057 Drift from East Access Shaft to Pier E141 (includes Access Pit) 155053055 Excavate Pier E142 155054050 Install Pier E14 SERVICE WATER PUMP STRUCTURE UNDERPINNING PROGRAM POST TENSIONING SYSTEM 202555170 Post Tensioning Tendon inspection & maintenance 3(12/7/82) A(12/7/82)

DEWATERING 207050618 Install 6 Preliminary Ejector Wells A (3/10/83) 207050605 Install Remaining Ejector Wells R

207050385 Core Drill SWPS Slab for Ejector Wells A-(3/17/83) 207050386 Core Drill CWIS Slab for Ejector Wells 1(11/1/82) A (3/17/83) 207050748 Probe for Deep Utilities Outside El 610 Excavation Limits (Ref-Dwg C-2031) l'(4/5/83) 207050380 Core drill SWPS and CWIS slabs for Piezometers A (4/13/83).

207050600

. Install Piezometers R

oiO882-2439d173-12 JEKostielney 05/24/83

. - - - - - - ~.

9 Consumers Power Company Attachment to Serial.CSC-6718 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983 AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 207050635 Install Dewatering Discharge System 2 (9/17/82)

(including headers, tank, pumps and electrical) 207050387 Convert 7 Wells used on 72" pipe repair to support SWPS 1(11/1/82).A (2/11/83) dewatering.

(Includes install new ejectors, temporary headers, operate, & maintain)

Fill SWPS Chambers (Bays)

.203150165 Fill SWPS Chambers with Water to El 622 (15')

Modify Pipe Supports 202550164 SWPS - Modify pipe supports to allow' for design load (30" 0HBC 34, 20 & 16)

ACCESS SHAFT & OPEN CUT EXCAVATION 207050335 Install Soldier Piles 1 (8/12/82)

BUILDING MONITORING 202550100 Install Deep Seated Bench Marks 1 (8/12/82) A.(4/4/83) 206050105 Crack Map SWPS 1 (9/17/82) A (3/10/83) 202550130 Installation of Extensometer Anchors I (4/5/83) A (4/13/83) 202550120 Installation of Extensometer Covers 3 (4/5/83) A (4/5/83) 206050100 Install Extensometers I (9/17/82) 206050106 Install Instruments and Terminate Instrument Cables 1 (9/17/82)

(Includes testing & calibration) 206050102 Install Brackets 1-(9/17/82) A (4/20/83) mi,0882-2439d173-12 JEKostielney 05/24/83

101 Consumers Power Company Midland Plant Units 1 &-2.

Attachment to Serial CSC-6718 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983 AND JUNE 30, 1983 DEVELOPED.IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION'III' REVISED ITEMS IDENTIFIER PROGRAM, WORK' AREA & ACTIVITY

' DESIGNATION 207550103 Install Conduit & Raceway 1 (9/17/82) A (2/22/83).

202550104 Install cable and terminate at. Data Acquisition Room 1 (9/17/82) 206050101 Install Permanent Benchmark Covers 1 (9/17/82) A (4/20/83)

206050104 Baseline, Operate, and Maintain Instrument System R

BORATED WATER STORAGE TANK FOUNDATION & TANK REPAIR PROGRAM-UNIT 1 TANK 312150111 Rebar Mapping 3 (8/25/82) A (8/25/82) 312150005 Drill and Grout Shear Connectors 2(12/13/82) A (4/20/83 312150007 Prepare concrete surfaces, drill holes & remove A (4/20/83) concrete for rebar.

312150011 Construct New Ring Beam 1 (8/12/82)

(set forms & place rebar, pour concrete) 312550019 Reinstall Electrical Ductbank 2 (9/17/82) A'(4/6/83) 312550018 Reinstall Piping, Pipe Hangers and Electrical Facilities A.(3/17/83) miO882-2'439d173-12 JEKostielney 05/24/83

11 Consumers Power Company Attachment to Serial CSC-6718 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983 AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30,_1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION UNIT 2 TANK 322150111 Rebar Mapping 3 (8/25/82) A (8/25/82) 322150005 Drill and Grout Shear Connectors 2(12/13/82) A (4/20/83) 322150007 Prepare concrete surfaces, drill holes & remove concrete A (4/20/83) for rebar 322150011 Construct New Ring Beam 1 (8/12/82)

(set forms & place rebar, pour concrete) 322550019 Reinstall Electrical Duct Bank 2 (9/17/82) A (4/6/83) 322550018 Reinstall Piping, Pipe Hangers and Electrical Facilities A (3/17/83) 322150212 Repair Tank Weld Defect R

UNDERGROUND PIPE REPLACEMENT, REBEDDING, AND MONITORING PROGRAM SHALLOW PROBING FOR PHASE II 407050400 Shallow probing for Phase II (Ref DWG C-2031)

TRAIN A 0F SERVICE WATER PIPE REPLACEMENT 4 402550500 Excavate Existing Pipe 1 (8/12/82) 402550510 Remove Existing Pipe 1 (8/25/82) 402550520 Install new pipe & expansion coupling 1 (8/25/82) 402550515 Hydro Test new pipe R

miO882-2439d173-12 JEKostielney 05/24/83

12 Consumers Power Company Attachment to Serial CSC-6718 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE 1, 1983 AND JUNL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 402550507 Perform Profiling & Ovality Check on New Piping R

402550525 Temporary Backfill New Pipe 1 (4/5/83)

CONSTRUCTION WORK IN SOIL MATERIAL PROGRAMS PERMANENT INTRUSION DETECTION SYSTEM 732050002 Install Wire (intl conduit) 3 (8/25/82) A (8/25/82) 732050003 Install Fence ig (incl fence posts & concret'e strip) 3 (8/25/82).A:(8/25/82)

.,/. 1 732050004 1^ns tpil-Grounding 3,, (9/17/82) A [9/1}/82) s a

L --

OBs-4 Repa'tr s

,/,

w~,

7~

2(12/13/8'2)A(4/13/83N -

Y 522550018 Dutch Cone Soil Testing in Vicinity of,0BS-4 for exploratory purposes

) g 5

r g;

\\

Acid-Caustic Unloading, Station

,j L

822550001 Excavate, install and backfill drainline an'd 1 (11/1/82) A (4/20/83) j

_ slab foiXId-caustic unloading static'n at Edst end of C~

w

~ Turbine Bailding

'2y 4

c c.s.[

'l

~

t

~

t

~21mE_RCENCY PERSONNEL LOCKS - UNIT 2 4

5 4 ;.l/, /

, S.

t n-

_Q

' n 'd

,b 79255000's.?

Excavate for, Install and Backrill Concrete'.Afrlock Structure N1 (9/ p/82),

'S r

}

~

r

.x

~

~

.q.

J' A

siO882-2439dli3-32' Y

l JEKostielney 05/24/83 a

. _ L.,. ',

~

w

- s.

L3-

-f.

)

3 a

/.

13 s

.p

~Attachmenttohherial,CSC6718 1

Consumers Power. Company Midland Plant Units 1 & 2

'I I

o; WORKACTIVITYLISTFhRTHF,PERIODBETWEENJUNE1, 1983 AND JUNE 30, 1983 x.

DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL,30, 1982 rs

)

.g INEW OR ACTIVITY x'44,,

1

-- 4 PREVIOUS' REGION IJIE' &

REVISED ITEMS IDENTIFfER rPROGRAM, WORK AREA & ACTIVITY

DESIGNATION ' N2

_s x

-; SIT /ILRT TEST FACILITIES.

s f ps, s,

O JN,

-~[

b'62450iO5 Exp1bratory 'Excavatian 'at. SIT /1LRT Duct yank-N.

f x

PERMANENT DEWATERING PROGRAM A

x 522150005 Install Reinaining Wells.

1 (9/17/82) 522550010

. Excavate, consCruct.and backfill'eletrical, duct bank 1 (9/17/82)

A

/

522550015

,,insta11' Guard Posts for Protection of Well J-1 3 (4/5/83)

A' (4/5/83) r.

Install electrical equipmentt.& conduit, I (9/17/82) i,[

522550016 N 522550020 Excavate,sinstall and' backfill header l ping and pumps s

I (9/17/82) ii (including' equipment slabs'and metering pits) s 522550025 Assemble and wire pump' control panels s

's

~

,x

's CATHODIC PROTECTION 752050001 Drill and replace annodes (as necessary) 1 (8/25/82) 752050002

- Drill & install new annodes 1(11/i/82)

DIESEL FUEL SUPPLY LINES 722050001 Install.missle shielding 1 (8/25/82) 722050002 Excavate,-remove, reinstall and backfill 1 (11/1/82)

DF0 supply lines 802450005 Exporatory excavation for examiniation of diesel A (4/13/83) fuel oil lines mi,0882-2439d173-12 JEKostielney 05/24/83

',1

)

'14 Consumers Power Company

[

Attachment to Serial CSC-671Ei' Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JUNE,1, 1983'AND JUNE 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION DIKE MAINTENANCE 812550010 Normal dike maintenance in Q ardas CONTROL ROOM PRESSURIZATION TANK' SETTLEMENT MARKERS.

' i z,4

~.

932450100 Excavate for, stall and backfill-Control Room pressurization tank settlement markers l-r

[

w cc_,.

~

, '. ~

~

q

^'

~.,..:,.

~2,

~ ',,

~'

m s

-l

-a s:

,.~

~

m.,

A

.~

~~

~ '

l ',..~ -

./

+

-4

%y v

m s

k

\\

f.

6!

mi_0882-2439d173-12 JEKostielney 05/24/83

1 Consumers Power Company Attachment to Serial C5C-6718

. Midland Plant Units 1 & 2

~

SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JULY 1, 1983 AND JULY 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 5

NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION AUXILIARY BUILDING & FIVP UNDERPINNING PROGRAM PIER W16 165052055 Drift from West Access Shaft to Pier W161 (includes Access Pit) 165053037 Excavate Pier W162 3

165054040 Install _.& Load Pier W16 PIER E16 155052055 Drift from East Access Shaft to Pier E161 155053037 Excavate Pier E162 155054040 Install & Load Pier E163 SUPPORT BRACKET 152555010 Install Temporary Support Bracket at El 162555010 Install Temporary Support Bracket at W1 SLAB MODIFICATION AT EL 659.0 102250203 Install stiffener plates and related modifications to existing slab (includes any associated concrete removal) miO882-2439f173-12 JEKostielney 05/24/83 i

.__--__g

,_g.

a a+aa 6

2 Consurers Power Company Attachment to Serial CSC-6713 Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JULY 1, 1983 AND JULY 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III PIVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER E13 155053040 Excavate Pier E132 155054035 Install Pier E13 PIER W13 165053040 Excavate Pier W132 165054035 Install Pier W13 DOWELS AT FIVP 155050325 Install dowels at east FIVP 165050325 Install dowels at west FIVP LEVEL C VALES 165055305 Install Level C Wales, West Side 155055305 Install Level C Wales, East Side PIER CT12 155052035 Drift to CT12 from UAT1 155053050 Excavate Pier CT122 155054045 Install & Load Pier CT123 niO882-2439f173-12 JEKostielney 05/24/83

3 Consumers Power Company.

Attachment to Seria1>CSC-6718 Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JULY 1, 1983 AND JULY 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER CT1 165052035 Drift to'CTI from UAT1 165053050 Excavate Pier CT122 165054045 Install & Loa'd Pier CT13 PIER KC4' 155052032 Finger Drift to KC41 155053315 Excavate' Pier KC42 155054310 Install & Load Pier KC43 PIER KC9 165052032 Finger Drift to KC9 1 165053315 Excavate Pier KC92 165054310 Install & Load Pier KC93 LONG DRIFTS 155052320 Drift to KC4 from KC31 165052320 Drift to KC9 from KC101 155052030 Drift to KC3 from KC21 miO832-2439f173-12 JEKostielney 05/24/83

4 i

Consumers Power Company Attachment to Serial CSC-6718 j

Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JULY 1, 1983 AND JULY 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 165052030 Drift to KC10 from KC11 1 UNDERGROUND PIPE REPLACEMENT, REBEDDING, AND MONITORING PROGRAM TRAIN B 0F SERVICE WATER PIPE REPLACEMENT 4 402550446 Excavate Existing Pipe 1 (8/12/82) 402550550 Remove Existing Pipe 1 (8/25/82) 402550560 Install new pipe & expansion coupling 1 (8/25/82) 402550561 Hydro Test new pipe R

402550508 Perform Profiling & Ovality Check on New Piping R

402550562 Temporary Backfill New Pipe 1 (4/5/83)

SERVICE WATER PUMP STRUCTURE UNDERPINNING PROGRAM EXCAVATION 207050781 Excavate, lag, brace and install wales and struts in east section of access shaft (includes upper

& lower level struts between soldier piles 15 thru 30)s 207050782 Excavate, lag, brace and install wales and struts in west section of access shaft (includes upper

& lower struts between soldier Piles 1 thru 14)5 Remove abandoned fire protection pipeline 1 (11/1/82) 202550163 mi,0882-d439 f173-12 JEKostielney 05/24/83

5 Consumers Power Company Attachment to Serial CSC-6718 i Midland Plant Units 1 & 2 4

SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JULY 1, 1983 AND JULY 31, 1983' DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA &' ACTIVITY DESIGNATION DEWATERING SYSTEM j

207050620 Activate, Operate and Haintain Dewatering System 1 (9/17/82) j BORATED WATER STORAGE TANK FOUNDATION AND TANK REPAIR PROGRAM

{

312150015 Relevel Tank-Unit 1 1 (9/17/82) 312550100 Install Instruments (includes testing and calibration)'

1 (11/1/82) t 322550100 Install Instruments (includes testing and calibration) 1 (11/1/82)

STORM DRAIN SYSTEM 302050305 Storm Drain System in the Tank Farm Area (includes grade slab) l CONSTRUCTION WORK IN SOIL MATERIAL PROGRAMS NITROGEN TANK INSTALLATION 1

782550005 Excavate for, install and backfill electrical duct bank 1 (9/17/82) 782550010 Excavate for, install and backfill piping 1 (9/17/82) 782550015 Excavate for, install and backfill concrete pad I (9/17/82)

I 782550020 Excavate for, install and backfill nitrogen tanks and 1 (9/17/82) associated concrete structures i

mi0882-2439f173-12 JEKostielney 05/24/83 j

~

6 Consumers' Power Company Attachment to Serial CSC-6718

, Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN JULY 1, 1983 AND JULY 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PERMANENT DEWATERING 522550014 Excavate Headers & Metering Pits, Install Header and Level Monitoring System, Install Pumps, Timers and Backfill CONTAINMENT TENDON ACCESS VENT HVAC 802550010 Excavate for, Install and Backfill Electrical Duck 1 (9/17/82)

Bank and Equipment Pad for the Unit 1 HVAC Fan 802550020 Excavate for, Install and Backfill Electrical Duck 1 (9/17/82)

Bank and Equipment Pad for the Unit 2 HVAC Fan i

t l

tri,0882-2439 f173-12 JEKostielney 05/24/83

o

(_

FOOTNOTES 1 Drift Activity normally includes 1.

fabricate steel sets 2.

excavate 3.

install steel sets (Hilti bolts as necessary) 4.

remove concrete (as necessary) 5.

localized dewatering (as necessary) 6.

install wood lagging 7.

place mudmat 8.

stabilize soil (as necessary) 9.

brace and/or rebrace 2 Excavate Pier activity normally includes 1.

excavate 2.

concrete removal (as necessary) 3.

dewatering (as necessary) 4.

fabricate steel lagging 5.

install steel lagging 6.

auger bottom of pit to determine hydrostatic water pressure & plug (piers 10 & 12 E&W) 7.

place mudmat 8.

stabilize soil (as necessary) l(

8 Install & load Pier activity normally includes 1.

fab & install embeds 2.

fab & install reinforcing steel 3.

install te11 tales 4.

install Carlson meters (pier 11 E&W) 5.

place concrete 6.

fab & install leveling & bearing plates, jackstands 7.

install jacks 8.

transfer load.

  • 9.

monitor and adjust pier jacks after load transfer 4 These activities have been broken down into Train A and Train B.

They were previously combined under the title " Train A & B of Service Water Pipe Replacement."

s Excavate Access Shaft Activity Normally Includes:

1.

excavate 2.

fabricate and install steel lagging 4

3.

fabricate and install structural steel supports and bracing 4.

place mudmat-5.

stabilize soil (as necessary) 6.

localized dewatering (a.s necessary) 7.

support and protect utilities 1

-miO882-2439b173 t

~

=

,.m

._,,,,....r,.,

._...m...,,

_ _. __--~.

.i.

..f

.s 4

NOTES C

A single asterisk.(*) in left hand column indicates the work activity is a new item.

s l

A double asterisk (**) in left hand column indicates the work activity description has been revised.

Designation 1 in the right hand column indicates additional information is required by NRC R5gion III on this critical activity.

Designation 2 in the right hand column indicates no additional information is required by NRC Region III on this critical activity.

Designation 3 in the right hand column indicates that the activity is not critical and work can proceed.

The date shown after the designation corresponds to the date of the NRC letter that provided the designation.

An "A" following the designation indicates that Region III has provided approval to proceed with the activity. The date following the "A" corresponds with the date of the NRC letter that provides authorization to proceed with the work activity.

A "R" in the right hand column indicates that previous designation or approval has been recinded because of a significant revision to the work activity or 90 days has elapsed or is expected to elapse since the work was' authorized without the work being initiated.