ML20071Q797

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures A.2-301 Re Emergency evacuation,A.2-3-2 Re Assembly Point Activation & A.2-303 Re Search & Rescue
ML20071Q797
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 05/17/1983
From: Ward E
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20071Q787 List:
References
NUDOCS 8306090257
Download: ML20071Q797 (1)


Text

>

W W

Northem States Power Company 414 Nicollet Mad Minneapoks, Menesota 55401 Telephone (612) 330-5500 May 17, 1983 Regional Administrator Region III U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 ,

MONTICELLO NUCLEAR

  • GENERATING PLANT Docket No. 50-282 License No. DPR-22 Emergency Response Plan Implementing Procedures Furnished with this letter is one copy of revisions to the Monticello Nuclear Generating Plant Emergency Implementing Procedures. These revisions include the following procedures:

List of Current Procedures (Dated 5/2/83)

A.2-301 Emergency Evacuation (Pages 1 thru 10) Rev 2 A.2.503 DELETED 04/28/83 A.2-302 Assembly Point Activation (Pages 1 thru 7) Rev 3 A.2-303 Search and Rescue (Pages 1 thru. 3) Rev 3 A.2-411 Establishment of Secondary Access Control (Pages 1 thru 4) Rev 1 A.2-106 Activation of Technical Support Center (Pages 1 thru 4) Rev 4 A.2-201 On-Site Monitoring and Protective Action Criteria (Pages 1 thru 9) Rev 3 A.2-205 Personnel Accountability (Pages 1 thru 8) Rev 2 A.2-403 In-Plant Emergency Surveys (Pages 1 thru 9) Rev 3 A.2-406 Of f-Site Dose Projection (Pages ' thru 16) Rev 7 A.2-415 Containment Gas Sample obtained at Post Accident Sampling System (Pages 1 thru 7) Rev 1 A.2-415 Containment Iodine and Particulate Samples Obtained at Post Accident Sampling System (Pages 1 thru 9) Rev 2 A.2-410 Out-of-Plant Surveys (Pages 1 thru 21) Rev 2 l Some of these porcedures include names and/or telephone numbers of persons having l responsibility under the Emergency Plan. To maintain the confidentiality of the above information for reasons of privacy and plan effectiveness, we have deleted names and/or telephone numbers from the copies which are sent to NRR because portions of these documents will be docketed.

N E C Uard P E {

i Manager-Nuclear Environmental Services l

ECW/GDH/ dab 8306090257 830601 PDR ADOCK 05000282 Attachment F PDR cc:

NRC Resident Inspector (w/o attachment)

G Charnoff (w/o attachment)

EP File _ , _ _ _ _