ML20071Q215

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Repts for Aug 1982 for Units 1 & 2 & Revised Sept 1982 Rept for Unit 2
ML20071Q215
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/17/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20071Q218 List:
References
NUDOCS 8212290253
Download: ML20071Q215 (1)


Text

-

, 4: '

lMsconsin Elecinc mmcoumr 231 W. MICHIGAN, P.O. BOX 2046, MILW AUKEE. W153201

)

i November 17, 1982 Director, Office of Management Information and Program Control U.

S. NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555

Dear Sir:

REVISED OPERATING DATA POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 l

Attached please find corrected copies of the Unit Shutdowns and Power Reductions Reports submitted with the monthly operating reports for the Point Beach Nuclear Plant, Units 1 and 2,

for the months of August and September 1982.

These revisions are necessary to correct the shutdown numbers reported on the I

August reports for Units 1 and 2, and the September report for Unit 2.

Very truly yours, C

/ 'ij Assistant Vice President C. W.

Fay Attachment Copy to NRC Resident Inspector 1hg,7 8212290253 821117 PDR ADOCK 05000266 R

PDR

_,