ML20071P982

From kanterella
Jump to navigation Jump to search
Forwards Revised Schedule for post-TMI Requirements (Generic Ltr 82-05),NUREG-0737,Items II.B.3.2 Re post-accident Sampling mod,II.F.1.6 Re Containment Hydrogen Concentration Monitor & III.A.2.2 Re Meteorological Data
ML20071P982
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/23/1982
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-2.F.1, TASK-3.A.2.2, TASK-TM GL-82-05, GL-82-5, JPN-82-91, NUDOCS 8212290175
Download: ML20071P982 (3)


Text

- _ _ _ _ _ _ _ - _,

,c POWER AUTHORITY OF THE STATE OF NEW YORK 10 CotuMous CIRCLE NEW YORK. N. Y.10o19 (212) 397.6200 Lanov s cLAsm vnustras

..........r....

",'.".7,*.'.7.',7.".*

eoHN s. oyson

'.';;"
::i:.;;.',...

= ~. - -

,os.,s

$...C..M,. o.m

' ' " * ' ' ' " * ^ " '

December 23, 1982 v'e==-'--

niCw Ano u. rLynn JPN-82-91

'.T.'.'.'**"

nOBEnv I. MILLON Z1 s T E PH E N L. B A U M J AM Es L. LAnOCC A Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Domenic B. Vassallo Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 Post TMI Requirements Generic Letter No. 82-05 t

References:

1.

D.G. Eisenhut (NRC) to All Licensees of Operating Power Reactors, dated March 7, 1982.

2.

J.P.

Bayne (PASNY) to D.B. Vassallo (NRC),

dated August 9, 1982, JPN-82-68.

3.

J.P.

Bayne (PASNY) to D.B. Vassallo (NRC),

dated August 25, 1982, JPN-82-71.

4.

J.P. Bayne (PASNY) to D.B. Vassallo (NRC),

dated April 21, 1982, JPN-82-38.

Dear Sir:

Our letters of August 9 (Reference 2) and August 25 (Reference 3) discussed the schedule of several NUREG-0737 items originally re-quested by the NRC in Reference 1.

For the reasons described below, we now find it necessary to change the schedule for the following items:

II.B.3.2 Post Accident Sampling Modification II.F.1.6 Containment Hydrogen Concentration Monitor III.A.2.2 Meteorological Data

.OY 8212290175 821223 PDR ADOCK 05000333 p

PDR

l i

i i

l If you have any further questions regarding this subject, please contact J.A. Gray, Jr. of my staff.

Very truly yours,

. m. -g,

L.,c[\\ / j '((f

[ J '.'P. Na

'ny[yTE:$ ha [h,Y$v,i,-

vExecutive Vice President Sc. W 7 7 J Nuclear Generation go u:a ; :o:> : C '.

Ccmmisson D+""" ###S3 State of New York County of Westchester Subscribed and sworn to before me this day 23 of h 4,7 p LINUh

/ $L r IN il /

)

Notary Public cc:

Mr.

J.

Linville Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 l

l 1

l II.B.3.2 Post Accident Sampling Modifications A post accident sampling system modification to the FitzPatrick plant is currently ic progress, and a large portion of the work has been completed.

Due to vendor delays, a change of general maintenance contractor, and the fact that it has not been possible to do heat tracing in parallel with mechanical work as originally planned, the modification is scheduled to.be comp 1_eted by. the end of the refueling outage. This outace is scheduled to begin May 1993.

Existing compensating measures are discussed in Reference 4.

II.F.1.6 Containment Hydrogen Concentration Monitor The schedule for the containment hydrogen concentration monitor has been affected by the same delays as the post accident sampling modifications.

This item is now scheduled for completion by the end of the refueling outage.

Reference 4 contains existing compensating measures for this item as well.

III.A.2.2 Meteorological Data This modification is being done in conjunction with Niagara Mohawk Power Corporation.

The Power Authority's sche 21e has been affected by delays in Niagara Mohawk's a

portion of the project.

We are currently evaluating all possible alternatives to bring this work to completion, and will notify you of the revised schedule as soon as it is available.

_ _ _