Monthly Operating Repts for Oct 1982
ML20071P970
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 11/15/1982
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20071P938 List:
References
NUDOCS 8212290169
Download: ML20071P970 (12)


Text

. _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ . -

AVER AGE DAILY UNIT P0hTR LEVEL DOCKET NO.

50-250 ,

UNIT Turkey Point 3 DATE NOV 151982 COMPLETED BY -

P. Pace TELEPilONE i

MONTH october 1982 . -

DAY AVERAGE D IL P 'ER LEVEL DAY AVER AGE DAILY POWER LEVEL

-(MWe-Net )

! 683 697 37 2 680 699 33 3 19 698 4 682 697 20 5 680 694 2]

6 678 693

. 22 7 674 23 695r 8 681 24 702 9 680 704 25 10 682 26 707

.II 681 27 707 I2 28 706 33 703 29 14 691 701 30 15 690 699 33 16 691 INSTRUCTIONS On this format.hst the aver. ige daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole twgawati, (9/77) 8212290169 821115 PDR ADOCK 05000250 R PDR

OPERATING DATA REPORT DOCKET NO. 50-250 DATE NOV 151982 COMPLETED BY P. Pace TELEPHONE (3051552-3654 OPER ATING STATUS

1. Unit Name: Turkey Point 3 Notes
2. Reporting Period: October 1982 # Unit 3 operated at full 2200 power for the entire
3. Licensed Thennal Power (MWt):
4. Nameplate Rating (Gross MWe): 760 monch.
5. Design Electrical Rating (Net MWe): 693 -

' 6. Maximum Dependable Capacity (Gross MWe): 680

7. Maximum Dependable Capacity (Net MWe): 647
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted.If Any (Net MWe):
10. Reasons For Restiictions,1f Any:

This Month Yr to-Date Cumulative

11. Ilours in Reporting Period 745 7,296 86,841.6
12. Number Of Hours Reactor Was Critical 745 4,459.9 60,220.0
13. Reactor Resene Shutdown Hours 0 0 844.4
14. Hours Generator On-Line 745 4,323.1 58,214.1
15. Unit Reserve Shutdown II,ours 0 0 121.8
16. Gross Thermal Energy Generated (MWH) 1,640,558 9,399,792 118,597,347
17. Gross Electrical Energy Generated (MWH) _538,480 ,,, 3,034,470 37,728,095
18. Net Electrical Energy Generated (MWH) 513,683_ 2,875,990 35,697,656
19. Unit Service Factor 100.0 59.3 67.0
20. Unit Asailability f actor 100.0 59.3 67.2
21. Unit Capacity Factor (Using MDC Net) 106.7 60.9 63.5
22. Unit Capacity I atfor (Using DER Net) 99.5 56.9 59.3
23. Unit Forced Ontage Rate 0 11.3 5.6
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test .Vitu. IPrior to Commercial Operation): Forecast Achiesed INillA L CRITICA LITY INIIIAL ELECTRICIIT

( OMMERCIA L OPER ATION (9/771

DOCKET NO. 50-250 UNIT SifUTDOWNS AND POWER REDUCTIONS "urkey Point 3 UNIT NAME DATE 40V 15 two

. COMPLETED BY P. Pace REPORT MONTH OCTOBER 1982 TELEPllONE (3051552-3654 e.

- E =

% .! ? 3 .$ 5' Licensee ** ,,

h9., Cause & Corrective No- DJt e i 5i :5 .5 s 5 Event i' b ~ ~2 5? Action to

  • $. E jig , Report : N0 EO Prev'ent Recurrence -

6 Unit 3 operated at fsll power for the entire month.

U t 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. -

Entry Sheets for Licensee C-Refueling 3 Automatie Scram. Event Report (LER) File (NUREG-D Regulatory Restriction @0ther (Explain) 01611 E Operator Trainiag & License Examination F Administrative Y' C*"*""## 5 G-Operational Errar (Explain) 6_ /.o a a setsven.d Exhibit I Same Souree (9/77) Il Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE t.

DOCKET NO. 50-250 UNIT Turkey Point 3 -

DATE NOV 151982 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH october 1982 Unit 3 operated at essentially full power for the entire month.

Major safety related maintenance activities included:

Several boric acid heat tracing circuits were repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 are contilnuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

i I

I .

i i

_~_

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 DATE NOV 151982 COMPLETED BY _P. Pace

~

TELEPilONE - (305)552-3654 i

MONTH october 1982 -

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE dally POWER LEVEL IMWe Net) -(MWe-Neti 1

669 --

l _e 2 666 ~~

18 3 663 39 4 663 20

~~

S 661 g 6 661 ~~

, 22 7 663 -- -

3 8 663 p 9 605 ~~

25

~~

10 --

26 II --

37 12 --

28

~~

13 -- --

39

~~

14 --

30 IS -- --

3g 16 -- - -

INSTRUCTIONS 1 On this forma, hst the average daily unit power leselin MWe-Nei for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) l

OPERATING DATA REPORT DOCKET NO. _50-251 DATE NOV 15 we COMPLETED BY P. Pace TELEPHONE (305)552-3654 OPERATING STATUS

1. Unit Name: Turkey Point 4 Notes Unit 4 operated at
2. Reporting Period: October 1982 full Power until commencing 2200 an outage for the Steam
3. Licensed Thermal Power (MWt): Generator Repair Program.
4. Nameplate Rating (Gross MWe): 760 ~
5. Design Electrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 680
7. Maximum Dependable Capacity (Net MWe): 646
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted.lf Any (Net MWe):
10. Reasons f or Restaittions.lf Any:

This Month Yr.-to Date Cumulative i1. Ilours in Reporting Period 745 7,296 80,569

12. Number Of Hours Reactor Was Critical 216.3 5,876.2 59,855.3
13. Reactor Reserve Shutdown Hours 0 0 166.6
14. Ilours Generator On Line 215.8 5,811.6 57,896
15. Unit Resene Shutdown li,ours 0 0 31.2
16. Gross Thermal Energy Generated (MWH) 473,285 12,701,621 121,918,244
17. Gross Electrical Energy Generated (MWH) 149,180 4,053,505 38,775,572
18. Net Electrical Energy Generated (MWil) 140,201 3,847,112 36',735,890
19. Unit Service Factor 29.0 79.7 71.9
20. Unit Asailability Factor 29.0 79.7 71.9
21. Unit Capacity Factor (Using MDC Net) 29.1 81.6 70.6
22. Unit Capacity Factor (Using DER Net) 27.2 76.1 65.8
23. Unit Forced Outage Rate o 11.3 3.9
24. Shutdowns Schedoted Oser Next 6 Months (Type.1) ate.and Duration of Each1:
25. If Shut Down At 1:nd Of Report Period, Estimated Date of Startup: July 1983
26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITIA L CRIIICA LITY INIII A L Ell:C TRICIIV CO\lMI RCI A L OPl:R ATION (9/771

DOCKET NO. 50-251 UNITSHUTDOWNS AND POWER REDUCTIONS UNITNAME -Turkey Point 4 DATE NOV 151Ae COMPLETED BY P. Pace REPORTMONTH OCTOBER 1982 TELEPl!ONE (305)ss2-3654 e.

  • ~ $ 5 g .5 ? "h 4.Y 5 Licensee P,, M Cause & Currective L. Date H
- , 3g 4 .5 s 5 Ever
t 4: h g? 5? . Action to y5 $ j p, g . Report : mV jU Prevent Recurrence -

6 18 821009 s 529.2 H 1 HB HTEXCH Steam Generator Repa'ir Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.

I 2 3 4 F: Forced Reason: Method: Exhibit C . Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Datu

!bMaintenance ciTest 24f anual Scram.

  • Entry Sheets for Licensee C. Refueling 3 Automatie Scram. Event Report (LER) File (NUREC.

D Regulatory Restriction 9-Other (Explain) 01611 E Operator Training & License Examination F Administrative Y' O*"**" " " S l , C-Operational Error (Explain) .s /.oao rusve.,. .cl Exhibit ! Same Souree (9/77) Il Other (Explain)

e

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point 4 -

DATE NOV i51982 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH October 1982 Unit 4 operated at essentially full power until commencing the Steam Generator Repair Program on October 9, 1982.

Other maior safety related maintenance activities included:

Several boric acid heat tracing circuits were repaired.

Inspecticiss and requirements of IE Bulletins and NUREG-0737 are confinuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

O I

l .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNil- St. Lucie 1 DAll NOV 151982 COMPLETED itY P. Pace TELEPilONE (305)552-365 MONTH october 1982 .

DAY AVER AGE DAILY POWER LEVEL DAY

- AVER AGE DAILY POWER LEVEL tMWe Net) .(MWe-Net) 3 832 833 37 2 830 834 18 3 829 19 815 4 830 20 835 5 825 21 832 6 828 22 761 7 788 576 2 23 8 797 19 24 9 834 708 25 10 833 8'42 26 11 833 g44 27 12 829 844 28 13 829 g43 39 14 829 30 841 15 831 g41 3g 16 831 INSTRUCTIONS On this format. hst the average daily unit power lesel in MWe Net for each day in the reporting anonth. Compute to the nearest whole megawart.

I 1

l (9/771

r '

l I

l -

OPERATING DATA REPORT l

f DOCKET NO. 50-335 DATE Mnv 18; ElR9 i COMPLETED BY P- Pace

! TELEPHONE -(3n5) Rn')-3654 OPERATING STATUS

1. Unit Name: ._ St. Lucie Unit 1 Notes Unit 1 operated at es-
2. Reporting Period: October 1982 sentially full power except 2700 for a brief outage. See the
3. Licrased Thennal Power (MWt):

" Unit Shutdowns and Power

4. Nameplate Rathig (Gross MWe): 890 --

Re ctions" report for de-

5. Design Electrical Rating (Net MWe): 830
6. Maximum Dependable Capacity (Gross MWe): 862
7. Maximum Dependable Capacity (Net MWe): 817
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Lesel To b hich Restricted,if Any (Net MWe):
10. Reasons For Restsictions,if Any:

This Month Yr..to.Date Cumulative ,

11. Ifours In Reporting l'eriod 745 7,296 51,384
12. Number Of linues Itcactor Was Critical 735.4 6,830 41,659.4
13. Reactor Resene Shutdown flours 0 0 205.3
14. Ilours Generator On-Line 718.2 6,780 40,792.9
15. Unit Resene Shntdown !!,ours 0 0 39.3
16. Gross Thermal Energy Generated (MWil) 1.897.947 18,038,210 101,362,129
17. Gross Electrical Energy Generated (MWH) 621,300 5.916,080 32,974,195
18. Net Electrical Energy Generated (MWH) 588.718 5,609,385 31,'088,932
19. Unit Service Factor 96.4 92.9 79.4
20. Unit Asailability Factor 96.4 92.9 79.5
21. Unit Capacity Factor (Using MDC Net) 96.7 95.5 77,4
22. Unit Capacity I attor (Using DER Net) 95.2 93.6 75.2
23. Unit Forced Onf.ege Rate 16 .7 4.8
24. Shutdowns Scheiluled Oscr Next 6 Months (Type. Date,and Duration of Each1:
25. If Shnt Down At End Of Report Period. Estimated Date of Startup:
26. Units In rest St.itu, tPrior to Commercial Operation): Forecast Achiesed INI TIA L CRI TICALITY j

INIII AL ELECTRICITY COM\lLRCI A L OPER ATION (9/771

.. i

50-335 UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNITNAME st. Lucie 1 DATE NOV 1519fD ~

OCTOBER 1982 COMPLETED BY P Pace REPORT MONT*{ r TELEPilONE (305)s52-3654 i

W.

- E =

% .! ? 3 4Y5 Licensee p,, jL Cause & Corrective N"- DJ'e i 5? 4 2i5 Event 4' b %7 53 _ Action to

$5 E j5 . Report : NC EO Prev'ent Recurrence -

o 06 8011023 F 26.7 A 3 335-82-50 HH PUMPXX Loss of condensate pump caused unit trip. Unit returned to service on installed spare pump

.;t ;

! 2 3 4 F: Forced Reason: Method: Exhibit C . Instructions S: Schedu!ed A.Etiuipment Failure (Explain) 1 Manual for Preparation of Data 11 Maintenance of Tes: 2 Manual Scram. -

Entry Sheets for Licensee C Refueling 3 Automatie Scram. Event Report tLER) File (NUREG.

D-Regulatory Restriction g Other (Explain) 01611 E Operator Training & License Examination F Administrative Y ~~ E * "" " " #" S

, G-Operational Error (Explain) s Ao a o a.xove.r..c/ Exhibit I Same Source (9/77) ll Olbr iExplaiiO

4

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT st. Lucie 1 -

DATE NOV 151982 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH october 1982 Unit 1 operated at essentially ful'1 power for the entire month except for a brief outage caused by the loss of a condensate pump. The unit .

was returned to operation using the installed spare pump.

Major safety related maintenance activities includcd:

Repairs w re made to the motor of an emergency diesel generator.

Repairs"were made to a 120-140 VDC static inverter.

Repairs were made to a charging pump.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Lighe Company commitments for NUREG-0737 imolementation are continuing. Refer to correspondence between FPL and NRC for additional information.