Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
. _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ . -
AVER AGE DAILY UNIT P0hTR LEVEL DOCKET NO.
50-250 ,
UNIT Turkey Point 3 DATE NOV 151982 COMPLETED BY -
P. Pace TELEPilONE i
MONTH october 1982 . -
DAY AVERAGE D IL P 'ER LEVEL DAY AVER AGE DAILY POWER LEVEL
-(MWe-Net )
! 683 697 37 2 680 699 33 3 19 698 4 682 697 20 5 680 694 2]
6 678 693
. 22 7 674 23 695r 8 681 24 702 9 680 704 25 10 682 26 707
.II 681 27 707 I2 28 706 33 703 29 14 691 701 30 15 690 699 33 16 691 INSTRUCTIONS On this format.hst the aver. ige daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole twgawati, (9/77) 8212290169 821115 PDR ADOCK 05000250 R PDR
OPERATING DATA REPORT DOCKET NO. 50-250 DATE NOV 151982 COMPLETED BY P. Pace TELEPHONE (3051552-3654 OPER ATING STATUS
- 1. Unit Name: Turkey Point 3 Notes
- 2. Reporting Period: October 1982 # Unit 3 operated at full 2200 power for the entire
- 3. Licensed Thennal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 760 monch.
- 5. Design Electrical Rating (Net MWe): 693 -
' 6. Maximum Dependable Capacity (Gross MWe): 680
- 7. Maximum Dependable Capacity (Net MWe): 647
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted.If Any (Net MWe):
- 10. Reasons For Restiictions,1f Any:
This Month Yr to-Date Cumulative
- 11. Ilours in Reporting Period 745 7,296 86,841.6
- 12. Number Of Hours Reactor Was Critical 745 4,459.9 60,220.0
- 13. Reactor Resene Shutdown Hours 0 0 844.4
- 14. Hours Generator On-Line 745 4,323.1 58,214.1
- 15. Unit Reserve Shutdown II,ours 0 0 121.8
- 16. Gross Thermal Energy Generated (MWH) 1,640,558 9,399,792 118,597,347
- 17. Gross Electrical Energy Generated (MWH) _538,480 ,,, 3,034,470 37,728,095
- 18. Net Electrical Energy Generated (MWH) 513,683_ 2,875,990 35,697,656
- 19. Unit Service Factor 100.0 59.3 67.0
- 20. Unit Asailability f actor 100.0 59.3 67.2
- 21. Unit Capacity Factor (Using MDC Net) 106.7 60.9 63.5
- 22. Unit Capacity I atfor (Using DER Net) 99.5 56.9 59.3
- 23. Unit Forced Ontage Rate 0 11.3 5.6
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test .Vitu. IPrior to Commercial Operation): Forecast Achiesed INillA L CRITICA LITY INIIIAL ELECTRICIIT
( OMMERCIA L OPER ATION (9/771
DOCKET NO. 50-250 UNIT SifUTDOWNS AND POWER REDUCTIONS "urkey Point 3 UNIT NAME DATE 40V 15 two
. COMPLETED BY P. Pace REPORT MONTH OCTOBER 1982 TELEPllONE (3051552-3654 e.
- E =
% .! ? 3 .$ 5' Licensee ** ,,
h9., Cause & Corrective No- DJt e i 5i :5 .5 s 5 Event i' b ~ ~2 5? Action to
- $. E jig , Report : N0 EO Prev'ent Recurrence -
6 Unit 3 operated at fsll power for the entire month.
U t 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. -
Entry Sheets for Licensee C-Refueling 3 Automatie Scram. Event Report (LER) File (NUREG-D Regulatory Restriction @0ther (Explain) 01611 E Operator Trainiag & License Examination F Administrative Y' C*"*""## 5 G-Operational Errar (Explain) 6_ /.o a a setsven.d Exhibit I Same Souree (9/77) Il Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE t.
DOCKET NO. 50-250 UNIT Turkey Point 3 -
DATE NOV 151982 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH october 1982 Unit 3 operated at essentially full power for the entire month.
Major safety related maintenance activities included:
Several boric acid heat tracing circuits were repaired.
Inspections and requirements of IE Bulletins and NUREG-0737 are contilnuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
i I
I .
i i
_~_
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 DATE NOV 151982 COMPLETED BY _P. Pace
~
TELEPilONE - (305)552-3654 i
MONTH october 1982 -
DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE dally POWER LEVEL IMWe Net) -(MWe-Neti 1
669 --
l _e 2 666 ~~
18 3 663 39 4 663 20
~~
S 661 g 6 661 ~~
, 22 7 663 -- -
3 8 663 p 9 605 ~~
25
~~
10 --
26 II --
37 12 --
28
~~
13 -- --
39
~~
14 --
30 IS -- --
3g 16 -- - -
INSTRUCTIONS 1 On this forma, hst the average daily unit power leselin MWe-Nei for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) l
OPERATING DATA REPORT DOCKET NO. _50-251 DATE NOV 15 we COMPLETED BY P. Pace TELEPHONE (305)552-3654 OPERATING STATUS
- 1. Unit Name: Turkey Point 4 Notes Unit 4 operated at
- 2. Reporting Period: October 1982 full Power until commencing 2200 an outage for the Steam
- 3. Licensed Thermal Power (MWt): Generator Repair Program.
- 4. Nameplate Rating (Gross MWe): 760 ~
- 5. Design Electrical Rating (Net MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 680
- 7. Maximum Dependable Capacity (Net MWe): 646
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons f or Restaittions.lf Any:
This Month Yr.-to Date Cumulative i1. Ilours in Reporting Period 745 7,296 80,569
- 12. Number Of Hours Reactor Was Critical 216.3 5,876.2 59,855.3
- 13. Reactor Reserve Shutdown Hours 0 0 166.6
- 14. Ilours Generator On Line 215.8 5,811.6 57,896
- 15. Unit Resene Shutdown li,ours 0 0 31.2
- 16. Gross Thermal Energy Generated (MWH) 473,285 12,701,621 121,918,244
- 17. Gross Electrical Energy Generated (MWH) 149,180 4,053,505 38,775,572
- 18. Net Electrical Energy Generated (MWil) 140,201 3,847,112 36',735,890
- 19. Unit Service Factor 29.0 79.7 71.9
- 20. Unit Asailability Factor 29.0 79.7 71.9
- 21. Unit Capacity Factor (Using MDC Net) 29.1 81.6 70.6
- 22. Unit Capacity Factor (Using DER Net) 27.2 76.1 65.8
- 23. Unit Forced Outage Rate o 11.3 3.9
- 24. Shutdowns Schedoted Oser Next 6 Months (Type.1) ate.and Duration of Each1:
- 25. If Shut Down At 1:nd Of Report Period, Estimated Date of Startup: July 1983
- 26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITIA L CRIIICA LITY INIII A L Ell:C TRICIIV CO\lMI RCI A L OPl:R ATION (9/771
DOCKET NO. 50-251 UNITSHUTDOWNS AND POWER REDUCTIONS UNITNAME -Turkey Point 4 DATE NOV 151Ae COMPLETED BY P. Pace REPORTMONTH OCTOBER 1982 TELEPl!ONE (305)ss2-3654 e.
- ~ $ 5 g .5 ? "h 4.Y 5 Licensee P,, M Cause & Currective L. Date H
- - , 3g 4 .5 s 5 Ever
- t 4: h g? 5? . Action to y5 $ j p, g . Report : mV jU Prevent Recurrence -
6 18 821009 s 529.2 H 1 HB HTEXCH Steam Generator Repa'ir Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.
I 2 3 4 F: Forced Reason: Method: Exhibit C . Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Datu
!bMaintenance ciTest 24f anual Scram.
- Entry Sheets for Licensee C. Refueling 3 Automatie Scram. Event Report (LER) File (NUREC.
D Regulatory Restriction 9-Other (Explain) 01611 E Operator Training & License Examination F Administrative Y' O*"**" " " S l , C-Operational Error (Explain) .s /.oao rusve.,. .cl Exhibit ! Same Souree (9/77) Il Other (Explain)
e
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point 4 -
DATE NOV i51982 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH October 1982 Unit 4 operated at essentially full power until commencing the Steam Generator Repair Program on October 9, 1982.
Other maior safety related maintenance activities included:
Several boric acid heat tracing circuits were repaired.
Inspecticiss and requirements of IE Bulletins and NUREG-0737 are confinuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
O I
l .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNil- St. Lucie 1 DAll NOV 151982 COMPLETED itY P. Pace TELEPilONE (305)552-365 MONTH october 1982 .
DAY AVER AGE DAILY POWER LEVEL DAY
- AVER AGE DAILY POWER LEVEL tMWe Net) .(MWe-Net) 3 832 833 37 2 830 834 18 3 829 19 815 4 830 20 835 5 825 21 832 6 828 22 761 7 788 576 2 23 8 797 19 24 9 834 708 25 10 833 8'42 26 11 833 g44 27 12 829 844 28 13 829 g43 39 14 829 30 841 15 831 g41 3g 16 831 INSTRUCTIONS On this format. hst the average daily unit power lesel in MWe Net for each day in the reporting anonth. Compute to the nearest whole megawart.
I 1
l (9/771
r '
l I
l -
OPERATING DATA REPORT l
f DOCKET NO. 50-335 DATE Mnv 18; ElR9 i COMPLETED BY P- Pace
! TELEPHONE -(3n5) Rn')-3654 OPERATING STATUS
- 1. Unit Name: ._ St. Lucie Unit 1 Notes Unit 1 operated at es-
- 2. Reporting Period: October 1982 sentially full power except 2700 for a brief outage. See the
- 3. Licrased Thennal Power (MWt):
" Unit Shutdowns and Power
- 4. Nameplate Rathig (Gross MWe): 890 --
Re ctions" report for de-
- 5. Design Electrical Rating (Net MWe): 830
- 6. Maximum Dependable Capacity (Gross MWe): 862
- 7. Maximum Dependable Capacity (Net MWe): 817
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Lesel To b hich Restricted,if Any (Net MWe):
- 10. Reasons For Restsictions,if Any:
This Month Yr..to.Date Cumulative ,
- 11. Ifours In Reporting l'eriod 745 7,296 51,384
- 12. Number Of linues Itcactor Was Critical 735.4 6,830 41,659.4
- 13. Reactor Resene Shutdown flours 0 0 205.3
- 14. Ilours Generator On-Line 718.2 6,780 40,792.9
- 15. Unit Resene Shntdown !!,ours 0 0 39.3
- 16. Gross Thermal Energy Generated (MWil) 1.897.947 18,038,210 101,362,129
- 17. Gross Electrical Energy Generated (MWH) 621,300 5.916,080 32,974,195
- 18. Net Electrical Energy Generated (MWH) 588.718 5,609,385 31,'088,932
- 19. Unit Service Factor 96.4 92.9 79.4
- 20. Unit Asailability Factor 96.4 92.9 79.5
- 21. Unit Capacity Factor (Using MDC Net) 96.7 95.5 77,4
- 22. Unit Capacity I attor (Using DER Net) 95.2 93.6 75.2
- 23. Unit Forced Onf.ege Rate 16 .7 4.8
- 24. Shutdowns Scheiluled Oscr Next 6 Months (Type. Date,and Duration of Each1:
- 25. If Shnt Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In rest St.itu, tPrior to Commercial Operation): Forecast Achiesed INI TIA L CRI TICALITY j
INIII AL ELECTRICITY COM\lLRCI A L OPER ATION (9/771
.. i
50-335 UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNITNAME st. Lucie 1 DATE NOV 1519fD ~
OCTOBER 1982 COMPLETED BY P Pace REPORT MONT*{ r TELEPilONE (305)s52-3654 i
W.
- E =
% .! ? 3 4Y5 Licensee p,, jL Cause & Corrective N"- DJ'e i 5? 4 2i5 Event 4' b %7 53 _ Action to
$5 E j5 . Report : NC EO Prev'ent Recurrence -
o 06 8011023 F 26.7 A 3 335-82-50 HH PUMPXX Loss of condensate pump caused unit trip. Unit returned to service on installed spare pump
.;t ;
! 2 3 4 F: Forced Reason: Method: Exhibit C . Instructions S: Schedu!ed A.Etiuipment Failure (Explain) 1 Manual for Preparation of Data 11 Maintenance of Tes: 2 Manual Scram. -
Entry Sheets for Licensee C Refueling 3 Automatie Scram. Event Report tLER) File (NUREG.
D-Regulatory Restriction g Other (Explain) 01611 E Operator Training & License Examination F Administrative Y ~~ E * "" " " #" S
, G-Operational Error (Explain) s Ao a o a.xove.r..c/ Exhibit I Same Source (9/77) ll Olbr iExplaiiO
4
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT st. Lucie 1 -
DATE NOV 151982 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH october 1982 Unit 1 operated at essentially ful'1 power for the entire month except for a brief outage caused by the loss of a condensate pump. The unit .
was returned to operation using the installed spare pump.
Major safety related maintenance activities includcd:
Repairs w re made to the motor of an emergency diesel generator.
Repairs"were made to a 120-140 VDC static inverter.
Repairs were made to a charging pump.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Lighe Company commitments for NUREG-0737 imolementation are continuing. Refer to correspondence between FPL and NRC for additional information.
I
.