Monthly Operating Rept for Oct 1982
ML20071P882
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/03/1982
From: Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML20071P872 List:
References
NUDOCS 8212290117
Download: ML20071P882 (4)


Text

.

, [ AVERAGE DAILY UNIT POWER LEVEL D i C#) .... 3 DOCKET NO. 50-387 L.

".; one UNIT

@ DAS November 3, 1982 O

Nic s*N COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-2181 MONTH october, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

Zero 37 Zero 2 Zer 18 Z*#

3 Zero g9 Zero 4

Zero Zero Zero Zero 5 21 6 Z'-

22 Zero 7

Zero g Zero 8 24 9 Zero Zero 3

10 ZE *#

26 11 zero 27 Zero 12 Zero ;g Zero 13 2"Y Z"#

29 I4 70rn Zero 30 15 Zero Zero 3

16 Zero INSTRUCIlONS On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8212290117 821111 PDR ADOCK 05000 R

f

~

/'

N) a /;____,[! $

n L pt__ L-__ _lIIIlm OPERATING DATA REPORT 50-387 0 DOCKET NO.

DATE November 3, 1982 O 4s COMPT.ETED BY L. A. Kuczynski NIC SY TELEPHONE (717)S42-2181 OPERATING STATUS Notes

1. Unit Name:Susquehanna Steam Electric Station Unitl October, 1982
2. Reporting Period: extended from October 4, 3293 through October 31, 1982
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 1280x0.9 = 1052
5. Design Electrical Rating (Net MWe): 1052 - 41 = 1011
6. Maximum Dependable Capacity (Gross MWe):
  • MDC to be determined.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe): Zero
10. Reasons For Restrictions,If Any: Unit in Initial Heatun/ Low Power Testine nhase. License restriction to 5% thermal power. Turbine Generator will not be synchronized at at or below M.

This Month Yr.-to.Date Cumulative i1. Hours In Re, esting Period -- 0 0 0

12. Number Of Hours Reactor Was Critical 0 0 0
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 0 0 0
15. Unit Reserve Shutdown Hours 0 0 _

0

16. Gross Thermal Energy Generated (MWH) 0 0 0
17. Gross Electrical Energy Generated (MWH) 0 0 0
18. Net Electrical Energy Generated (MWH) 0 0 0
19. Unit Service Factor N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each):

None l

l

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY 9/7/82 9/10/82 INITIAL ELECTRICITY 11/19/82 COMMERCIAL OPER ATION 5/15/83 (0/77 )

4j '

n.

( r, -

O I

Y ~

,\ 7 m) .

50-387 y UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Susquehanna Unit 1 Q Prat gd DATE 11/3/82

    1. fC M COMPLETED BY T- A - 7""ym k 4 SY REPORT MONTH Octcher. I982 TELEPHONE (717)542-2181 X 240 w.

- E E

, 5? 3 jIi Licensee ,Ev, j", Cause & Corrective No. Date g 3g s jg5 Event y pU Action to H

$ $ j g?3 g Report a mO g Prevent Recurrence c5 821004 S 666.5 H 2 N/A ZZ ZZZZZZ Manual scram performed upon entry int >

pre-turbine roll outage.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Re:,triction 4-Other (Explain) 0161)

E-Operator Training & License Examination F- Administ rative 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) Il-Other (Explain)

PPSL. FORM 25

.- PPaL' a

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 11/3/82 Completed by : L. A. Kuczynski Telephone (717)S42-2181 October, 1932 Cha11anges 1.o Main Steam Safety Relief Valves None.

Changes to Offsite Dose Calculation Manual None.

Major Changes to Radioactive Waste Treatment Systems None.

P E N NS Y LVANI A POWE R & LIGHT COMPANY l _______