Monthly Operating Rept for Oct 1982
ML20071P882
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/03/1982
From: Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML20071P872 List:
References
NUDOCS 8212290117
Download: ML20071P882 (4)


Text

.

[

AVERAGE DAILY UNIT POWER LEVEL D

i C#)

3 DOCKET NO.

50-387 L.

one UNIT DAS November 3, 1982 Nic s*N O

COMPLETED BY L.A. Kuczynski TELEPHONE (717)S42-2181 MONTH october, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

Zero 37 Zero 2

Zer Z*#

18 Zero Zero 3

g9 Zero Zero 4

Zero Zero 5

21 Z'-

Zero 6

22 Zero Zero 7

g 8

24 9

Zero Zero 3

ZE 10 26 11 zero 27 Zero 12 Zero

g Zero 2"Y Z"#

13 29 I4 70rn 30 Zero 15 Zero 3

Zero Zero 16 INSTRUCIlONS On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8212290117 821111 PDR ADOCK 05000 R

f a N) ! $

~

/;____,[

/'

n L pt__ L-__ _lIIIlm OPERATING DATA REPORT 0

DOCKET NO.

50-387 O

4s DATE November 3, 1982 NIC SY COMPT.ETED BY L. A. Kuczynski TELEPHONE (717)S42-2181 OPERATING STATUS Notes

1. Unit Name:Susquehanna Steam Electric Station Unitl October, 1982
2. Reporting Period:

extended from October 4, 3293

3. Licensed Thermal Power (MWt):

through October 31, 1982 1280x0.9 = 1052

4. Nameplate Rating (Gross MWe):

1052 - 41 = 1011

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
  • MDC to be determined.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe): Zero
10. Reasons For Restrictions,If Any: Unit in Initial Heatun/ Low Power Testine nhase. License restriction to 5% thermal power. Turbine Generator will not be synchronized at at or below M.

This Month Yr.-to.Date Cumulative i1. Hours In Re, esting Period 0

0 0

12. Number Of Hours Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 0

0 0

0 0

15. Unit Reserve Shutdown Hours 0

0 0

0

16. Gross Thermal Energy Generated (MWH) 0 0

0

17. Gross Electrical Energy Generated (MWH) 0 0

0

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor N/A N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net)

N/A

22. Unit Capacity Factor (Using DER Net)

N/A

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each):

None l

l

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY 9/7/82 9/10/82 INITIAL ELECTRICITY 11/19/82 5/15/83 COMMERCIAL OPER ATION (0/77 )

4j r,

n.

Y

,\\

(

~7 O

I %

50-387 m)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

y d

UNIT NAME Susquehanna Unit 1 Q

Prat g

DATE 11/3/82 M

COMPLETED BY T-A - 7""ym k 4

  1. fC SY REPORT MONTH Octcher. I982 TELEPHONE (717)542-2181 X 240 w.

E E

5 ?

3 jIi Licensee

,Ev, j",

Cause & Corrective No.

Date g

3g s

jg5 Event y

pU Action to j g?3 g Report a mO Prevent Recurrence H

g c5 821004 S

666.5 H

2 N/A ZZ ZZZZZZ Manual scram performed upon entry int pre-turbine roll outage.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Re:,triction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administ rative 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il-Other (Explain)

PPSL. FORM 25 PPaL' a

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 11/3/82 Completed by : L. A. Kuczynski Telephone (717)S42-2181 October, 1932 Cha11anges 1.o Main Steam Safety Relief Valves None.

Changes to Offsite Dose Calculation Manual None.

Major Changes to Radioactive Waste Treatment Systems None.

P E N NS Y LVANI A POWE R & LIGHT COMPANY l