ML20071P263
| ML20071P263 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 05/31/1983 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20071P266 | List: |
| References | |
| NUDOCS 8306070396 | |
| Download: ML20071P263 (1) | |
Text
r-1 1111nnis Power Com 7
U- 0641 L35 (25) -83 (05 -31) -L 500 SOUTH 27TH STREET, P. O. BOX 511. DECATUR, ILLINOIS E2525-1805 Docket No. 50-461 May 31, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
Subj ect :
Clinton Power Station Unit 1 FSAR Amendment No. 25 Illinois Power Company hereby files Amendment No. 25, dated May, 1983, for the Clinton Final Safety Analysis Report (CPS-FSAR).
FSAR Amendment No. 25 consists primarily of:
a) Revisions to Chapter 17, QA and Table 3.2-1 to resolve SER outstanding issue #20, QA Program; b) complete revision of subsection 6.2.5 to describe the system for hydrogen mitigation in containment; c) revisions in Sections 11.2, 11.3 and 11.4 to delete Unit 2 equipment and references; d) changes in Chapter 3 to resolve SER confirmatory issue
- 6, Containment ultimate strength analysis; and e.' some miscellaneous changes and other SER issues updating information.
Three (3) signed originals and eighty-five (85) copies are fornished for amending the FSAR s2ts provided to NRC per 10CFR50.30.
Respectfully submitted, IL NOIS POWER COMPANY D. P. Hall Vice President GEW/lt Subscribed and sworn to
$4hgf before me theJ//ay of May, 1983.
(
gff/m g. 6g 8306070396 830531 Notary Public PDR ADOCK 05000461 A, ammission ExpmMT.Mun
--