ML20071P130
| ML20071P130 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/13/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20071P134 | List: |
| References | |
| NUDOCS 8211020359 | |
| Download: ML20071P130 (1) | |
Text
'
i f.9aising Anderss A4bsma Power Company f
600 North 18th Stre:,t F, J Post Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 b
F. L. Clayton. Jr.
0; '$'C'7,*"'
Alabama Power tre southern ekttic syskwn July 13, 1981 Docket No. 50-348 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the June,1981 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr.
John F. Stolz to Mr. Alan R. Barton, dated October 21,1977, a " Narrative Sumnary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, F.L.Clayton(Jr.
i FLCJr/JRC:nac Attachments xc: Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Director, RII (1 copy)
(
l F211020359 810713 g6p PDR ADOCK 05000348 PDR r
R