THE CINCINNATI GAS & ELECTRIC COMPANY in '
May 27, 1983 LOZ-83-0035 SENSOR veCE PRESsOENT NWCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission
{
Region III 799 Roosevelt Road Glen Ellyn, Illinoir 60137 Attention:
Mr. J.G.
Keppler Regional Administrator Gentlemen:
RE:
WM. H.
ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50. 55 (e), ITEM E FAILURE OF BROWN BOVERI (ITE) SOLID STATE TRIP DEVICES W.O.
57300, JOB E-5590, FILE NO. 956C, E-42 This letter constitutes an interim report concerning the subject condition initially reported to the Commission on March 7,
1983 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e).
As stated in our previous letter, LOZ-83-0012, dated March 28, 1983, review of the essential circuit breakers at this facility identified 57 of the subject trip units.
The corrective action for this deficiency is to replace the capacitor or replace the entire trip unit.
Work requests are being prepared to remove the defective units from service.
The trip units will then be returned to the manufacturer for replacement of the capacitor and calibration and testing of the unit.
Scheduling and completion of the corrective action is contingent upon the NRC approval of these work requests or the NRC release of the November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction".
Upon this NRC approval or release, a projected schedule for completion of the corrective actions will be submitted.
l 8306070267 830527 M }7 s"^
AN JUN 21983
Mr. J.G. Keppler Regional Administrator May 27, 1983 LOZ-83-0035 Page 2 i.
l We trust the above will be found acceptable as a l
supplementary final report under 10CFR50.55(e).
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By d 'd n -
WILLIAMS, pR.
ENIOR VICE PRESIDENT cc:
NRC Office of Inspection & Enforcement Washington, D.C.