Interim Deficiency Rept Re Defective GE Hma Relays.Initially Reported on 830225.NRC 821112 Order to Show Cause & Order Immediately Suspending Const Must Be Lifted to Permit Completion of Corrective Actions
ML20071N798
Person / Time
Site: Zimmer
Issue date: 05/27/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50-55E, 10CFR-50.55E, LOZ-83-0034, LOZ-83-34, NUDOCS 8306070232
Download: ML20071N798 (2)


Text

.

(

THE CINCINNATI GAS & ELECTRIC COMPANY sW -

CINCINN ATI.QHIO 45201 May 27, 1983 LOZ-83-0034 SENeon veCE PAESIDENT NUCLEAR OPEmatlONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen:

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50. 55 (e) , ITEM E GE HMA RELAYS W.O. 57300, JOB E-5590, FILE NO. 956C, E-40 This letter constitutes an interim report concerning the subject conditions initially reported to the Commission on February 25, 1983 as a potentially reportable deficiency under the requirements of 10CFR50.55(e).

Our previous response, LOZ-83-0001, dated March 21, 1983, identified the two potential deficiencies, insufficient clearance between the armature tail piece and the molded posts on either side and the excessive length of the uninsulated flexible leads

to the moveable contacts.

The corrective actions for the two deficiencies require inspection of the relays and either replacement of the defective relay or installation of heat shrink tubing on relays with excessive lead length, i

Scheduling and completion of the required inspection and repair or replacement of the affected relays is contingent upon the NRC release of the November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction" for this work. Upon this NRC release, a projected schedule for completion of the l corrective actions will be submitted.

l l

JOH 21983 8306070232 830527 f!M PDR ADDCK 05000358 (

S PDR

.j_ffl

d Mr. J.G. Keppler Regional Administrator May 27, 1983 LOZ-83-0034 Page 2 We trust the above will be found acceptable as an interim

, report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY

! By Mdd _'_ ;-m ,

. WILLIAMS, JR/

SENIOR VICE PRES DENT cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Senior Resident Inspector ATTN: W.F. Christianson NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz l

l l

.--. _ - - - - . _ _ _ . _ _ _ . _ . _ _ . , _ , _ _ , _ . ,_ -- . _ . . _ - - _ _ _ , _ - _ - - .