Supplemental Final Deficiency Rept Re Inadequate RHR HX Valves.Required Matl Expected within 1 Month.Installation & Testing to Be Scheduled After Matl Received & Commission 821112 Show Cause Order Lifted
ML20071N619
Person / Time
Site: Zimmer
Issue date: 05/27/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LO2-83-36, LOZ-83-0036, LOZ-83-36, NUDOCS 8306070135
Download: ML20071N619 (2)


Text

o mm THE CINCINNATI GAS & ELECTRIC COMPANY CINCINNATI. OHIO 4520t May 27, 1983 LOZ-83-0036 J. WILLIAMS, a 9 SENIOR v4CE PRESIDENT NUCLEAR OPERAtlONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J.G.

Keppler Regional Administrator Gentlemen:

RE:

WM. H.

ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50. 55 (e), ITEM M RHR HEAT EXCHANGER VALVES W.O.

57300, JOB E-5590, FILE NO. 956C, M-19 This letter constitutes a supplement report to our final report, QA-1556, dated January 18, 1982, regarding the subject deficiency.

As stated in our previous report, LOZ-83-0002, dated March 23, 1983, modifications necessary to complete the corrective action are expected to be completed approximately three months after the NRC's November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction" is lifted for work in this area.

Part of the required material has been received with the remainder to be delivered in approximately one (1) month.

Installation and testing will be scheduled after all material is received and the NRC's November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction" is lifted for work in this area.

A projected schedule for completion of the corrective actions will be submitted at that time.

I JUN W

Ob 8306070135 830527 PDR ADOCK 05000358 S

PDR

Mr. J.G. Keppler Regional Administrator May 27, 1983 LOZ-83-0036 Page 2 We trust the above will be found acceptable as a supplementary final report under 10CFR50.55 (e).

Very truly yours, THE CINC".NNATI GAS & ELECTRIC COMPANY By UA*ne h

1H IASS, JR.#

FSENIOR VICE PRESI ENT cc:

NRC Office of Inspection & Enforcement Washington, D.C.

20555 NRC Senior Resident Inspector ATTN: