Forwards Licensee First Annual Progress Rept on Installation of Exact Replica Simulator.Bid Package Delayed from Apr to Sept,1982.Installation Expected in 1985.Svc List Encl
ML20071N413
Person / Time
Site: Crane 
Issue date: 10/06/1982
From: Blake E
METROPOLITAN EDISON CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Buck J, Edles G, Kohl C
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
References
ISSUANCES-SP, NUDOCS 8210080094
Download: ML20071N413 (7)


Text

.

'1 SHAw, PITTMAN, PoTTs & TROWBRIDGE OgED A PAflTNERSMiP OF PROFESSIONAL CORPORATIONS 1800 M STRE ET. N. W.

'82 E -7 P2 41 WASHINGTON, D. C. 2003.

(2021 s22-6000 RAMSAY D. POTTS. P.C.

THOMAS A. SANTER. P C.

JOHN M. O'NEILL, JR.

MENNETM J. MAUTMAN

- MILLER br F I ASNW'MC;eg r..DAVIOMangMENC(5 Y ETEuaRT L PITTMAN. PC.

JAMES M. SURGER. P.C.

JAY A. EPSTIEN RAND L ALLEN 8 EORGE F. TROwSRiDOE. P.C.

SHELDON J. WEISEL. P C.

TELEcoplER TIMOTHY S. MeeftlDE

[

aG,

EUSABETH M. PENDLETON}gPSE CTEPMEN D. POTTS. P C.

JOf e A McCULLOUOM. P.C.

SsIV.

4 ERALD CHARNOFF. P.C.

J. PATRICM MICNEY. P.C.

12O21 833-8088 & 842-1899 PHILup O. SOSTwlCK. P.C.

GEOROC P. MsCHAELY. JR., P C.

PAUL A. KAPLAN JEPMIEV ANCOLA MARRY H. GLASSPIEGEL MANNAM E. M. LIESERMAN R. TIMOTMY MANLON. P.C..

J. TMOMAS LENHANT. P C.

GEORGE M. ROGERS. JR., P C.

STEVEN L MELT 2[R. P.C.

JEFFERY L YASLON SANDRA E. FOLSOne TELD JACM McMAY MARCIA R. N#RENSTEIN FRED A. Lf 7TLE. PC.

DEAN D. AMLICM. P.C.

THOM AS H. McCORMICK JUDITM A. SANDLER JOHN S RMINELANDER. P.C.

JOHN ENGEL. P C-89+3883 (SHAwLAW WSHI SRUCE W. CHURCMILL. P C.

CHARLES 3. TEMKIN P.C.

SUSAN M. FREUNO EDWARD O. YOUNO. til LESLsE A. NICMOLSON, JR., P C. STEPMEN S. MUTTLER. P.C.

CASLE *SMAWLAW" JOMN L CARR. JR.

ROBERT L. WILLMORE PHILIP J. MARVEY AND81EW O. ELLes MARTIN O. KRALL. P C.

WINTMROP N. BROWN. P.C.

ROSERT M. Oo8IDON WENDELIN A. WHITE EsCHARO J. MENOALL PC.

JAMES 3. HAMLIN. P.C.

JAY E. SILSCRO. P C.

RANDAL 3. RELL. P.C.

BARSARA J. MOstGEN STANLEY M. SA800 SanSAptA M. ROSSOTTI. P C.

stOSERT E. ZAMLER SONNIC S. OOTTLIES MRISTI L. LIMBO GEORGE V. ALLEN JR P.C.

RICHARD E. GALEN JOHN F. DEALY' HowARD M. SMAFFERMAN LESLIE K. SMITH DESORAM S. SAUSER VsRGINIA S. RUTLEDGE FRE3 DRASNER, P C.

ROSERT 3. ROSSINS COUNSEL R. MENLY WEBSTER. PC.

STEVEN M. LUCAS SCOTT A. ANENBERO MATHERINE P. CMEEN NATHANIEL P. SREED. JR., P.C. DAvtD M. RUSENSTERN CAMPSELL MILLEFER JANICE LEMREft-STE4N MAftM AUQENGLICK. P.C.

LYNN WHITTLESEY wlLSON SETM M. MOOGAS6AN TRAVIS T. SMOWN. JR.

ELNEST L. SLAME. JR.. P C.

MATIAS F. TRAVIESO-DIAZ SMEILA McC. 04A51VEY 4 AIL E. CupHREY CAllLETON S. JONES. P.C.

VICTORIA J. PERR8NS DELISSA A. RfDOwAY RICHARD M. KulONTMAL STEPHEN S. MCIMANN

  • NOT ADMITTED GN D C.

WRITER'S DIRECT OsAL NUMBER October 6, 1982 822-1084 Administrative Judge Administrative Judge Gary J. Edles, Chairman John H. Buck Atomic Safety & Licensing Atomic Safety & Licensing Appeal Board Appeal Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C.

20555 Washington, D.C.

20555 Administrative Judge Christine N. Kohl Atomic Safety & Licensing Appeal Board i

U.S. Nuclear Regulatory

(

Commission i

Washington, D.C.

20555 l

In the Matter of l

i METROPOLITAN EDISON COMPANY (Three Mile Island Nuclear Station, Unit No. 1)

Docket No. 50-289 SP (Restart)

Dear Judges Edles,

Buck and Kohl:

l Following the exchange of proposed findings and before reply findings were filed in the management phase of this proceeding, Licensee and the Commonwealth of Pennsylvania arrived at agreements to resolve differences reflected in their respective proposed findings.

In essence, Licensee made a number of commitments in the form of anticipated

/^8210000094 821006 05000289 (PDR ADOCK t

0 PDR p

l 6.

SHAW, PITTMAN, PoTTs & TROWBRIDGE A PARTNERSHIP OF PROFESSIONAL CORPORATIONS Administrative Judges Gary J. Edles John H. Buck Christine N. Kohl October 6, 1982 Page Two License conditions to meet concerns expressed by the Common-wealth.

The commitments subsequently were accepted by the Board and appear as recommended license conditions in the Management PID (see 11 525-83, particularly 1 583).

One of the licensee's commitments was to procure an exact replica simulator for training of TMI-1 personnel.

Management PID, 1 583(5).

Bid specifications were to be distributed by April 1, 1982, and reasonable and diligent efforts made to have the simulator installed by 1985.

In October of each year, Licensee is to provide to NRC reports on the progress of fulfillment of the condition.

Enclosed for the information of the Appeal Board and parties is Licensee's first annual progress report on instal-lation of an exact replica simulator at TMI-1.

For the reasons stated in the letter report and its attachment, distribution of the bid package was delayed from April to September, 1982.

As the report further indicates, the type of bid package produced is expected to facilitate the normal bidding and delivery process.

Installation, therefore, is still anticipated for the target year, 1985.

Sincerely, h/f. Ihr ErnestL.Blake,ft,Jr.

i Counsel for Licensee I

ELB/tjc Encl.

1 cc:

Service List

(

i l

J GPU Nuclear Corporation luclear EfMSn**

S Middletowr.. Pennsylvania 17057 717 944-7621 TELEX 84 2386 Writer"s Direct Dial Number:

Octder 4,1982 5211-82-241 1

9 Office of Nuclear Reactor ' Regulations Attn: John F. Stolz, Chief Operating Reactors. Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Replica Simulatory Status Report In accordance with the' requirements of Para. 583 (5) of the August 27, 1981 Managment PID, we are submitting our first status report regarding the pro-curement and installation of the replica simulator for TMI-1.

The procurement specification has been prepared and was issued for bids on September 30, 1982.

The specification requires a 70 day bid response by the simulator vendors.

GPUN will then conduct technical and financial evaluations of bid proposals and preaward negotiations which should result in award of contract in the spring of 1983 (3/83).

We anticipated issuing the simulator specification for bidding in the spring l

of 1982.

However, due to die complexity of the technical specifications as well as our desire to assemble'a thorough and complete specification, it was I

necessary to delay the dcce for issuaucc of specification for bids to 9/30/82.

The attachment provide = a more detailed revicw of events to date.

We currently anticipate a 30 month delivery cycle after award of contract.

This should result in a replica simulator being installed at TMI in the fall of 1985, which continues to be compatible with the installation date pre-l dicted in our testimony.

We will notify you of any significant changes to this project as they occur.

Our second status report will be provided in October, 1983.

Sincerely,

n) d kill cc:

R. Jacobs Director, TMI-l R. C. Haynes GPU Nuclear Corperction is a subs.dery c! the Ger.e:E! Put:c UtWiies Corporation

o a

Attachment Chronology Events for The Issuance of Technical Specification for the TMI-l Replica Simulator February 1981 GPU Nuclear comitted to installation of TMI-l replica simulator.

PID para. 583 (5) states that Licensee shall issue bids and distribute specifications to bidders by 4/1/82 and make reasonable efforts to have simulator installed in 1985.

Progress reports beginning in October 1982 and annually thereafter are required for this effort.

June 1981 Work began on preparation of specification.

Decembsr 1981 Draft of technical specification complete and issued to various b

Departments within GPU Nuclear Technical Functions for review and comment.

March 1982 Extensive comments and review by Technical Function Departments necessitated additional input by other GPU Nuclear Divisions such as Nuclear Assurance (Training), TMI-1 Operations, etc.

Because of complexity of the technical aspects of the bid package, and in order to avoid schedule delays, costly overruns and implementation problems that plagued similar simulator projects, GPU Nuclear management decided to consult with other utilities and simulator l

vendors for additional input.

This valuable input and the desire to allow for future changes as a result of NUREG 0752 (control Room l

Design Review), led to extensive changes in the specification.

l l

July 1982 l

The additional comments and input are incorporated into a revised specification and as a final check, GPU Kuclear recuested review of specification from B&W's simulator division.

l August 1982 GPU Nuclear received cocments from B&W.

September 2, 1982 GPU Nuclear and MW :::eet to resolva B&W comments.

l l

September 1982 l

Final bid package prepared.

Simulator vendors and B&W feel the specification is thorough and. complete.

As a result, the bidding process, as well as delivery of an acceptable product will be greatly facilitated.

September 30, 1982 Bid package relessed to potential bidders. 70 day bid period with bids due on 12/10/82.

GPU Nuclear will review and evaluate bids I

with award expected about 3/83.

30 month delivery period required.

Simulator to be delivered in Fall, 1985.

E e

O l-

o UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Pefore the Atomic Safety and Licensing Appeal Board In the Matter of

)

)

METROPOLITAN EDISON COMPANY

)

Docket No. 50-289 SP (Restart)

(Three Mile Island Nuclear Station, Unit No. 1)

)

SERVICE LIST Administrative Judge Administrative Judge Gary J.

Edles, Chairman Ivan W. Smith, Chairman Atomic Safety & Licensing Atomic Safety & Licensing Board Appeal Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C.

20555 Washington, D.C.

20555 Administrative Judge Administrative Judge Walter H. Jordan John H. Buck Atomic Safety & Licensing Board Atomic Safety & Licensing 881 West Outer Drive Appeal Board Oak Ridge, TN 37830 U.S. Nuclear Regulatory Commission Administrative Judge Washington, D.C.

20555 Linda W. Little Atomic Safety & Licensing Board I

Administrative Judge 5000 Hermitage Drive Christine N. Kohl Raleigh, NC 27612 Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing U.S. Nuclear Regulatory Board Panel Commission U.S. Nuclear Regulatory Washington, D.C.

20555 Commission Washington, D.C.

20555 Jack R. Goldberg, Esquire (4)

Office of the Executive Atomic Safety & Licensing Legal Director Appeal Board Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C.

20555 Washington, D.C.

20555 Docketing & Service Section (3)

Robert Adler, Esquire Office of the Secretary Karin W. Carter, Esquire U.S. Nuclear Regulatory Assistant Attorneys General Commission 505 Executive House Washington, D.C.

20555 Post Office Box 2357 Harrisburg, PA 17120

.n h-John A. Levin, Esquire Ms. Gail Phelps Assistant Counsel ANGRY /TMI PIRC Pennsylvania Public Utility 1037 Maclay Street Commission Harrisburg,.PA 17103 Post Office Box 3265 Harrisburg, PA 17120 Jordan D. Cunningham, Esquire Fox, Farr & Cunningham Mr. Henry D. Hukill 2320 North Second Street Vice President Harrisburg, PA 17110 GPU Nuclear Corporation Post Office Box 480 Ellyn R. Weiss, Esquire (1)

Middletown, PA 17057 William S. Jordan, III, Esquire (1)

Harmon & Weiss Michael F. McBride, Esquire 1725 Eye Street, N.W.,

Suite 506 LeBouef, Lamb, Leiby & MacRae Washington, D.C.

20006 1333 New Hampshire Avenue, N.W.

Suite 1100 Mr. Steven C. Sholly Washington, D.C.

20036 Union of Concerned Scientists 1346 Connecticut Avenue, N.W.

Ms. Louise Bradford Lopont Circle Bldg., Suite 1101 e

TMI ALERT Washington, D.C.

20036 1011 Green Street Harrisburg, PA 17102 Chauncey Kepford Judith H. Johnsrud Mr. Norman Aamodt Environmental Coalition on j,

R. D. 5 Nuclear Power Coatesville, PA 19320 433 Orlando Avenue State College, PA 16801 John Clewett, Esquire r

The Christic Institute David E. Cole, Esquire 1324 North Capitol Street Smith & Smith, P.C.

Washington, D.C.

20002 2931 Front Street i

Harrisburg, PA 17110 Michael W. Maupin, Esquire Hunton & Williams Administrative Judge 707 East Main Street Gary L. Milhollin Post Office Box 1535 Atomic Safety & Licensing Board Richmond, VA 23212 4412 Greenwich Parkway, N.W.

Washington, D.C.

20007 i

l l

.