ML20071K255
| ML20071K255 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 07/13/1982 |
| From: | Long D WINTHROP, STIMSON, PUTNAM & ROBERTS |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| FOIA-82-309 NUDOCS 8207050085 | |
| Download: ML20071K255 (3) | |
Text
1..
LAW OFFICE 3 CF WINTHROP, STIMSON, PUTNAM & ROBERTS do WALL STREET, NEW YORK, N.Y. looo5 CIN%JCTICU T OF,8CE FLORIDA OF FBCE TM ORD. CONN Oe 90s PALM DEA M.rLA 33400 T ELE PHONE:203 340-2300 lNTERN ATION AL TELEX:52854
- DOMESTIC TELEX: ee-elos T E L E, won E: s o s. e ss.T2 e?
EU2gPtAN OFFICE idlOTOwN NEw VORR O,FplCE CNE CILLEGE MILL IO EAST S3 STREET LC N'IG N. EC4 R e t R A, E NGLAttO NEW TOR R. N.Y. 60022 TEL* PHONE: os. 23g.240s TELEPHOht: Wit 943 = O700 TELE. wlNCUT 8 83242 CAILE' WINSTeM. LONDON EC4 July 13, 1982
@EW h ggg omEcr oiAL NuunEn 2'2-530-7534 ACT REQUEST kN'dhf Director, Office of Administration U.S. Nuclear Regulatory Commission Ad.
[- /[-[ L Washington, D.C.
20555 Gentlemen:
This is a request under the Freedom of Infor-mation Act, as amended, 5 U.S.C. S 552 and the Freedom of Information Act Regulations of the United States Nuclear Regulatory Commission.
10 CPR Part 9.
The undersigned hereby requests:
A.
All records (as that term is define,d in 10 CFR S 9.3a) provided to NRC by Westinghouse Electric Corporation ("WEC") which refer or relate to the Indian Point Power Plant, Unit Number 2,
("IP2").
B.. All records provided to NRC by WEC which refer or relate to tube degradation, denting, corrosion, cracking and/or related phenomena in any steam generator sold or manufactured by WEC for any nuclear power plant other than IP2 including, without limitation, WEC analyses of the causes of tube degradation and suggested or proposed remedial action.
C.
All records provided to NRC by any person other than WEC which refer or relate to tube degradation, denting, corrosion, cracking and/or related phenomena in any steam generator sold or manufactured by WEC for any nuclear power plant.
y..
D. ' A'll records authored, sponscred or commissioned by NRC and/or its employees which refer or relate to tube 6
\\
8207050085 s
~
5.<
- Director, Office of Administration July 13, 1982 WF degradation, denting,. corrosion, cracking and/or related phenomena in any steam generator sold or manufactured by WEC for any nuclear power plant including, without limi-tation, analyses of the causes of said tube degradation and suggested or proposed remedial action.
i E.
All records authored, sponsored.or commissioned by NRC and/or its employees which refer or relate to tube degradation, denting, corrosion, cracking and/or related phenomena in any steam generator sold or manufactured for any domestic nuclear power plant including, without limi-tation, analyses of the causes of said tube degradation and suggested or proposed remedial action.
F.
All records provided to NRC by WEC which refer or relate to cracks in rotating components known as discs of steam turbines sold or manufactured by WEC for a nuclear power plant other than IP2 including without limitation, WEC analyses of the causes of such cracking and suggested or proposed remedial action.
G.
All records provided to NRC by any person other than WEC which refer or relate to'eracks in steam turbine discs sold or manufactured by WEC for a nuclear power plant.
H.
All records authored, sponsored or commis-sioned by NRC and/or its employees which refer or relate to cracks in steam turbine discs sold or manufactured by l
WEC for any nuclear power plant including, without limi-tation, analyses of the causes of such cracking and suggested or proposed remedial action.
I note that it is the poli ~y of NRC to disclose c
records which NRC might consider exempt from disclosure l
if such disclosure is not contrary to the public interest and will not adversely affect the rights of any person.
10 CFR S 9.9.
Accordingly, for any record for which NRC l
claims an exemption would you specify not only your basis for claiming the exemption but also the reasons why this l
policy is not applicable.
As provided in the amended Act and 10 CFR
I.>
- Dirnctor, Offica of Administration July 13, 1982 SS 9.8 and 9.9, I will expect to receive a reply to this request within ten working days of your receipt of this letter.
Costs not to exceed $500.00 are acceptable and will be paid.
Should estimated costs of production exceed that sum, please advise me prior to commencing production.
.Yours truly, k
avid J. Lon l
1 l
l l
'v.
dl l
l