Responds to NRC Re Violations Noted in IE Insp Repts 50-280/83-05 & 50-281/83-05.Corrective Actions: Administrative Procedure ADM-8 Reviewed W/Staff Assistant & Notice of Violation & Response Posted
ML20071K152
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/08/1983
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20071K134 List:
References
169, NUDOCS 8305270248
Download: ML20071K152 (2)


Text

r e

=,

e.

e D F ';1',j.

VIRGINIA ELECTRIC AND Pownu;D A'. C'O M PANY s

m>v.

Ricnwoxn,VruoxxtA 20261 W.L.STswAur 33 A R 18 P l. 30 Vaca P amsonar xec1...o,..inon.

April 8, 1983 Mr. James P. O'Reilly Serial No. 169 Regional Administrator N0/WDC:acm Region II Docket Nos. 50-280 U. S. Nuclear Regulatory Commission 50-281 101 Marietta Street, Suite 2900 License Nos. DPR-32 Atlanta, Georgia 30303 DPR-37

Dear Mr. O'Reilly:

We have reviewed your letter of March 11, 1983 in reference to the inspection conducted at Surry Power Station on February 7-11, 1983 and reported in IE Inspection Report Nos. 50-280/83-05 and 50-281/83-05.

Our response to the specific infraction is attached.

We have determined that no proprietary information is contained in the report.

Accordingly, the Virginia Electric and Power Company has no obj ection to this inspection report being made a matter of public disclosure.

The information contained in the a:tached pages is true and accurate to the best of my knowledge and belief.

Very truly,yours,

/dla f

W. L. Stewart Attachment cc:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing F305270248 B30503 PDR ADDCK 05000280 0

PDR

r

.=

Attachmznt Paga 1 Serial No. 169 RESPONSE TO NOTICE OF VIOLATION INSPECTION REPORT NOS. 50-280/83-05 AND 50-281/83-05 A. NRC COMMENT:

10 CFR 19.11 requires that any Notice of Violation involving radiological working conditions along with the licensee's response be conspicuously posted in a sufficient number of places to permit individuals engaged in licensed activities to observe them on the way to and from any particular licensed activity location to which the document applies and remain posted a minimum of five days or until action correcting the violation has been completed, whichever is later.

Contrary to the above, the posting requirements were not met in that neither the Notice of Violation issued with Inspection Report 50-280/281/82-33 on December 21, 1982, nor the licensee's response dated Janusry 20, 1983, were posted on February 10, 1983.

Action correcting the-violation was not complete.

This is a Severity Level V Violation (Supplement IV).

RESPONSE

(1) ADMISSION OR DENIAL OF THE ALLEGED VIOLATION:

The violation is correct as stated.

(2) REASONS FOR VIOLATION:

The reason for the violation was determined to be an oversight on the part of the station staff.

The responsibility for posting of documents specified in 10 CFR 19.11(a)(4) had become. unclear due to recent changes in the station's commitment tracking system.

l (3) CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED:

The requirements of Administrative Procedure ADM-8, "10 CFR 19 Reporting Requirements" have been reviewed with the station's Staff Assistant to ensure complete understanding of the regulation.

The subject Notice of Violation and our response were immediately posted as required.

l l

(4) CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS:

ADM-8, "10 CFR 19 Reporting Requirements" will be revised to clarify the responsibility for such postings and to emphasize the associated minimum time requirements.

(5) THE DATE WHEN FULL COMPLIANCE WILL BE ACl;IEVED:

Full compliance has been achieved.

ADM-8, "10 CFR 19 Reporting Requirements" will be revised by May 1, 1983.

-