TENNESSEE VALLEY AUTHORITY
- CH AT T A NOOG A. T E N Ni S$ CE 374 71 400 Chectnut Street Tower II April 16, 1982 Director of Nuclear Reactor Regulation Attention:
Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Ms. Adensam:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 Enclosed is our response to D. G. Eisenhut's March 17, 1982 letter to All Licensees of Operating Power Reactors regarding Post-TMI Requirements (Generic Letter No. 82-05). The enclosure provides a response to each of the items listed in Enclosure 1 to the March 17, 1982 letter from D. G. Eisenhut.
If you have any questions concerning this matter, please get in touch with J. E. Wills at FTS 858-2683 Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Man ger m
Nuclear Regulation and S et of,,
Sworn p d subscr bed hefore me s/
this /
- -day of 1982 O
lip.,
O l
Rotary Public~ ~
c %;DO2.A m$
iTauk&W M
~
~
My Commission Expires
[
E-] 3 Enclosure
\\
cc:
U.S. Nuclear Regulatory Commission m
Region II Attn:
Mr. James P. O'Reilly, Regional Administrator ine'nt;**2*rn"*h#'* 3' 3o>/
'/
82042iQUS P
mww a
s x,
ENCLOSURE RESPONSE TO D. G. EISENHUT'S MARCH 19, 1981' LETTER TO H. G. PARRIS POST-TMI REQUIREMENTS (NUREG-0737)
SEQUOYAH NUCLEAR PLANT I.A.3.1 - Sinulator Exans This iten ic conplcte. TVA's simulator exam policy has been in place before this. item ses required.
. II.B.2 - Plant Shielding This item in complete as documented by the December 19, 1980 L. M. Mills to A. Schuencer letter.
II.B.4 - Training for Mitigating Core Danage 1
This~ item is complete as documented by the May 5, 1981 L. M. Mills to A. Schuencer letter.
f II.E.1.2 - Au::iliary Feeduater Initiation and Flou Indication I
This item is complete as documented by the December 19, 1980 L. M. Mills to l
A. Schwencer letter.
II.E.4.2'- Containrent Isolation Deoendability This item is complete. Part 5 uas documented by the January 7,1981 L. M.
i Mills to A. Schwencer letter. Part 7 una documented in TVA's NUREG-0573 response transmitted by the July 11, 1980 L. M. Mills to A. Schwencer letter.
f.
II.K.2.10 - Safety-Grade Trip i
This item is not applicable to Sequoyah.
II.
3 15 - Isolation of HPCI and LPCI Modificat!on.
l This item is not applicable to Sequoyah.
l.
II.K.3.10 - Interloc!: on Recirculation Pump This item is not applicable to Sequoyah.
II.
3.22 - RCIC Suction i
1 This item is not applicable to Sequoyah.
II.K.9.2ft - Scace Coolin? for HPCI/RCIC l
This item is not applicable to Sequoyah.
I
.v. w
-2 II.K 3.27 - Common Reference Level This item is not applicable to Sequoyah.
For items II.B.3, II.F.1.1, 2, 3, 4, 5, and 6, TVA is presently required to have these completed no later than startup following the first refueling outage, We are in the process of reevaluating our capability to perform all required and necessary modifications within the required timeframe. By June 15, 1982, we expect to submit a new integrated schedule on all outstanding commitments which will address these items in more detail.