Responds to 810218 Generic Ltr 81-10 Re Min Staffing Requirements.Current Operating Shift Provides Sufficient Personnel to Meet All Requirements
ML20071J816
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/22/1982
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GL-81-10, NUDOCS 8204270380
Download: ML20071J816 (2)


Text

._

s 9

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET f

P.O. BOX 8699 ED 9}g b f982g 1881 -1981 PHILADELPHI A. PA.19101 SHIELDS L DALTROFF

.=:==

April 22, 1982

^

us Re :

Docket Nos. 50-277 50-278 Mr. Darrel G.

Eisenhut, Director Division of Licensing U. S.

Nuclear Regulatory Commission Washington, D.C.

20555

SUBJECT:

Minimum Staffing Requirements for Peach Bottom Atomic Power Station

Dear Mr. Eisenhut:

This letter provides confirmation that the Peach Bottom staffing for operating shift personnel meets the requirements of Table III.A.1.2-1 presented in generic letter 81-10, D.

G.

Eisenhut to All Licensees of Operating Plants, dated February 18, 1981.

This confirmation was requested in a March 29, 1982 telephone call from Mr. Robert DeFayette who is reviewing a previous submittal on minimum staffing for emergency operations (J.

W.

Gallagher to D.

G.

Eisenhut, dated April 3, 1981).

Table III A.1.2-1 in generic letter 81-10 requires the operating shift for the unit in the emergency condition to consist of at least one shift supervisor (SRO), one shift foreman (SRO), two control room operators, and two auxiliary operators.

A footnote to Table III A.1.2-1 requires additional shif t personnel for the unaffected unit consisting of at least one shift foreman, one control room operator, and one auxiliary 9

8204%v0380 h9

a P

Mr. Darrel G Eisenhut, Director Page 2 operator except that units sharing a control room may share a shift foreman.

The Peach Bottom operating shift, as specified in figure 6.2-2 of Appendix A to the Peach Bottom Technical Specification, provides sufficient personnel to meet both of these requirements.

The control room is shared by both units, and consequently the Peach Bottom shift foreman is also shared.