ML20071J474
| ML20071J474 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 04/16/1982 |
| From: | Russell L BALTIMORE GAS & ELECTRIC CO. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| TASK-2.F.1, TASK-TM NUDOCS 8204270272 | |
| Download: ML20071J474 (1) | |
Text
B ALTIMORE G AS AND ELECTRIC COMPANY P. O. B O X 1475 hl 19 T
s A LTIM O R E. M A R YLA N O 212o3 v-
.()
(,
a oy
.ra2 SD NUCLEAR POWER DEPARTMENT I/
"N
-f T n g c)
O y COLVERT CLIFP5 NUCLEA R POWER PLANT LUSSY, M ARYLAND 20657 71 A
i; c c :rrmm:a 16 April 1982 tAmpx u E
/
Mr. Ronald C. Haynes, Director Docket Nc. 50-317 Office of Inspection and Enforcement License No. DPR-53 U. S. Nuclear Regulatory Commisssion Region 1 631 Park Avenue King of Prussia, PA.19406
SUBJECT:
LER 32-19, Unit 1
Dear Mr. Haynes:
This letter is to confirm our verbal notification of your Mr. Ralph Architzel of the discovery that manual valves in the hydrogen sampling line were closed prohibiting opertion of the hydrogen analyzers.
At 1830 on 4-15-82 with Unit 1 in Mode 1 it was discovered that the manual isolation valves inside containment for the six hydrogen sample points were shut, thus rendering the hydrogen analyzer inoperable (T.S. 3.6.5.1). The valves were immediately opened, terminating the event. The redundant hydrogen analyzer was out of service for modifications relating to TMI Action Plan item !!.F.1.6.
A complete description of the events leading to this discovery and any further corrective action will be addressed in a follow-up report.
-Very t,ruly yours, p
L. B. Russell Plant Superintendent LBR:fid cc:
- 3. A. Tiernan R. M. Douglass Director, Office of Management R. E. Architzel Information & Program Control L. B. Russell G. S. Pavis 8204'2.709 %
,y ps S
io