Public Version of Revised Emergency Plan Implementing Procedures,Consisting of Procedures QEP-110-1 Re Station Director Implementing Procedure & QEP-360-t2 Re Evacuation Routes by Wind Direction
ML20071J087
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/19/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20071J077 List:
References
PROC-820319-02, NUDOCS 8204260359
Download: ML20071J087 (8)


Text

. .

QEP 110-0 Revisien 5 b rch 1982 ID/1A,1B STATION DIRECTOR 110-0 Station Director Rev. 5 03-19-82 110-1 Station Director Implementing Procedure Rev. 5 03-19-82 t

d APPROVED MAR 191982-i Q.C.O.S.R.

82 04 2 6 0 3 r9 6

. _ _ _ _ _ _ _ . = __ -

g (final) w7xA7a nEnnou

QEP 110-1 Revision 5 STATION DIRECTOR March 1982 IMPLEMENTING PROCEDURE ID/1D A. PURPOSE The purpose of this procedure is to outline the method used to implement j the Station Director duties. i B. REFERENCES

1. GSEP Phone List.
2. QEP 200-2, Classification of an Incident Involving Hazardous Material.
3. QEP 200-T1, Quad-Cities Emergency Action Levels.
4. QEP 310-1, Initial Notification.
5. QEP 360-2, Plant Evacuation and Assembly.
6. QEP 360-3, Site E acuation.

C. PREREQUISITES

1. None. -

D. PRECAUTIONS APPROVED

1. None. MAR 191982 E. LIMITATIONS AND ACTIONS k-
l. Responsibilities. .
a. To have responsible charge of the GSEP Station group and direct a staff in organizing and coordinating the emergency efforts at and within the immediate vicinity of the station.
b. To ensure adequate manning and access control of the Onsite TSC when activated.
c. To keep the GSEP Command Center Director fully informed of the status of the emergency and the measures being taken to deal with the emergency.
d. Establish agreements required for service specified in Section 4 of the site annex unless another Director has been assigned the responsibility of obtaining this agreement.

r QEP 110-1 Revision 5

2. Notification.
a. Initial notification by:

(1) Shift Engineer.

(2) Senior NSO.

F. PROCEDURE

1. Obtain information as required from:
a. Shift Engineer.
b. Radiation Protection Department. The RCT's should conduct appro-priate surveys and sampling activities until the arrival of the Rad / Chem Director.
2. Categorize the incident using procedures QEP 200-2 and 200-T1.
a. Transportati.on Accident.
b. Unusual Event.
c. Alert.
d. Site Emergency.
e. General Emergency.

.3. Notify the following as necessary per the instructions given by procedure QEP 310-1:

a. System Power Supply Load Dispatcher.
b. Station Director. ,
c. Command Center Director. ,
d. Operations Director.
e. Technical Director. .

l

f. Maintenance Director.
g. Stores Director.
h. Administrative Director.
1. Security Director. APPROVED
j. Rad / Chem Director. NUAR 191982  ;

Q.C.O.S.R.

QEP 110-1 Revision 5 4 Actions required-complete as necessary.

a. Personnel Accounting-contact Security Director.

(1) Personnel accounted for or assembled.

(2) Personnel missing (list)

A P R RCh/ E D h0%R 191982 Q.c.o.s.A

b. Injured personnel-contact Operations Director.

(1) Radiation Protection notified for first aid / survey and de-contamination.

(2) Ambulance arranged.

(3) Hospital House Supervisor Notified.

(4) Command Center notified.

NAME H05PITAL AMBULANCE

c. Plant Access-contact Security Director.

(1) Gate House secure. .

(a) Locked by guard.

(b) Open to allow off-site access and notified to direct off-site assistance.

d. Evacuation planned-contact Operations Director.

(1) Non-essential personnel-list groups i

I L

QEP 110-1 Revision 5 (2) Site evacuation-contact Operations Director.

(a) Route planned.

(b) Estimated dose expected.

(c) Assembly area.

1.

2.

3.

(d) Survey personnel available.

(3) Local area evacuation proposed. (Refer to generic GSEP tables 6.3-1 and 6.3-2, and Section 7.3.3.)

(a) Sector (s) involved and avoidable dose.

(b) Coordination through:

1. Illinois Emergency Services and Disaster Agency.
2. Iowa Office of Disaster Services.

(c) Environs team notified for assistance and continuing information.

e. Contact Industrial Relations regarding injuries (after incident is under control).
f. Recovery.

(1) Determine extent of contamination. ,

(a) On-Site - contact Rad / Chem Director.

(b) OffSite - contact Environs Director.

(2) Protective measures set for personnel.

(3) Dose ma'nagement set.

(4) Unit status set and stable-contact Operations Director.

(5) Damage estimated.

(6) Development of specific recovery plans.

APPROVED MAR 191982 Q. c.o. s. R.

QEP 110 . Rsvision 5 G. -CHECKLISTS 3 1. None.

  • r

-H. TECHNICAL SPECIFICATION REFERENCES i

1. None.

1 4'

1 1

f.

t J

i i

i 1

i t

i i.

3

i. .

1 i,

4 4

i i

! l t,

1 I-

SPPROVED i.

MAR 191982 Q. C. O. S. H. - i i

( final) 4' F

- ~ . . . , .w . --- ,- . w ---a. , . - . . , , . . - - . . - . . . - - - - .---

QEP 360-0 Revisica 9 March 1982 ID/IS,1T PROTECTIVE MEASURE FOR

. ONSITE PERSONNEL 360-0 Protective Mea:ures for Onsite Personnel Rev. 9 03-19-82 360-1 Dryvell Evacuation Rev. 1 06-20-80 360-2 Plant Evacuation and Assembly Rev. 6 03-02-82 360-3 Site Evacuation Rev. 2 03-02-82 360-4 Use of Potassium Iodide (KI) as a Thyroid Blocking Agent Rev. 2 05-18-81 360-5 Issuance of Emergency Film During GSEP Conditions Rev. 1 05-18-81 360-S1 Emergency Film Distribution I.og Rev. 1 05-18-81 360-T1 Evacuation Assembly Areas for Visitors and Contractors Rev. 2 03-02-82 360-T2 Evacuation Routes by Wind Direction- Rev. 4 03-19-82_~ -

360-T3 Site Evacuation Routes Rev. 1 06-20-80

~

360-T4 Evacuation Relocation Centers Rev. 1 06-20-80 360-T5 lodine - 131 Dose Equivalent to Thyroid Reference Reg. Guide 1.109 Rev. 1 04-01-81 360-T6 .

Iodine - 133 Dose Equivalent to Thyroid Reference Reg. Guide 1.109 Rev. 1 04-01-81 360-T7 Iodine - 135 Dose Equivalent to Thyroid 4pPROVEP Reference Reg. Guide 1.109 Rev. 1 04-01-81 MAR 191982 360-n Potassium Iodide Distribution Record Rev. 1 I 05-18-81 Q.C.O.S.n .

(final) 4

i 1

QEP 360-T2 Revision 4 EVACUATION ROUTES BY WIND DIRECTION March 1982 ID/IN WIND DIRECTION SITE EVACUATION RELOCATION (Determined from Control ROUTE CENTER Room or Metro Tower) (See QEP 360-T3) (See QEP 360-T4)

I N (0 ) A PARK NNE A PARK

  • NE (15 ) A PAR ENE A RHS{

E (90 ) A RHS ESE A RHS SE (135 ) A RHS SSE A RHS 3

S (180*) A RHS SSW A RHS 3

SW (225 ) A RHS WSW A RHS W (270 ) B RHS WNW B PARK NW (315 ) B , PARK NNW A PARK I

PARK: Proceed north on Route 84 to Albany Road. Turn right on Albany Road.

Park is on left hand side of the road.

2 RHS: (Riverdale High School /COE Elementary Schc ,1). Proceed south on Route 84 to Hillsdale Road. Turn left on Hillsdale Road. Proceed to 256th Street North. Turn left on 256th Street North. The Riverdale High School and COE Elementary School is on the left hand side of the road.

3 EVACUATION ROUTE C: This route may be used at the discretion of the -

Operations Director or Shif t Engineer.

APPROVED MAR 191982 Q.c.o.s.n (final) 1