Notifies That Commitment to Limit Operation of Unit 2 to Zero Power Physics Testing as Result of Recent Problems w/DS-416 Reactor Trip Breakers Met W/Issuance of Safety Evaluation for Unit 1 Breakers
ML20071H867
Person / Time
Site: Mcguire
Issue date: 05/19/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8305250507
Download: ML20071H867 (1)


Text

Duxe POWER GOMPANY P.O. BOX 33189 CHAMLOTTE, N.C. 98942 HALH. TUCKER rates seown wwm rareserne (704) 373-4534

"**^'"

May 19, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 Ret McGuire Nuclear Station Docket No. 50-370

Dear Mr. Denton:

Duke Power Company described actions that would be taken regarding recent problems with the DS-416 reactor trip breakers in a letter dated May 10, 1983.

As part of that' action, Duke committed to limic operation of Unit 2 to zero power physics testing until receipt of the NRC Staff's Safety Evaluation Report on the reactor trip breakers. On May 17, 1983 the NRC issued the Safety Evaluation Related to McGuire 1 Reactor Trip Breakers.

Inasmuch as the Unit 2 breakers are identical to those employed on Unit 1. Duke considers that the above commitment has been met and operation of Unit 2 may commence subject to the limitations of the current license on that unit.

Please advise if there are any questions regarding this matter.

Very truly yours, W

w Hal B. Tucker NAR/php cc:

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 i

Atlanta, Georgia'30303 Mr. W. T. Orders NRC Resident. Inspector McGuire Nuclear Station Q

8305250507 830519 9