Cumes Il. Cnt:se Baltimore Gas and Electric Company Plant General Manager Calvert Clifs Nuclear Power Plant l
l Calvert Cliffs Nuclear Poner Plant 16 o Calvert Clifs Parkway 5
l Lasby. Maryland 20657
\\
410 586-2200 Ext. 4tos local 410 260-4101 Baltimore July 15,1994 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 June 1994 Operating Data Reports l
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
I This report includes a change in both units maximum dependable capacity gross and net (line items 6 and 7). The change became effective June 1,1994. This change is also reflected in the calculations for " Unit Capacity Factor" (line item 21).
Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.
Very truly yours,
.P
,. p CilC/FP/bjd Attachments cc:
D. A. Brune, Esquire J. E. Silberg, Esquire M. K. Boyle, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. A.1lartfield, NRC R.1. McLean, DNR J. II. Walter, PSC P. lavis, INPO K. Larson, ANI GD)l
[8h[p~ 7ff j'fp jpg 9407210261 940630
/4 d'
PDR ADOCK 05000317 R
h
.2 a
a a a.
.an a
a a
+
.-_a 4
4 a.
ee**************************************************************************
" UNIT 1 OPERATING DATA REPORT ee**************************************************************************
Docket No. 50-317 July 15, 1994 i
Prepared by Frank Piazza-Telephone:(410)260-3821 OPERATING STATUS I
- 1. UNIT NAME Calvert Cliffs Unit 1 2.
REPORTING PERIOD JUNE 1994 3.
LICENSED THERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A i
- 10. REASONS FOR RESTRICTIONS N/A I
Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 720 4,343 167,844-
.~
1:2. NUMBER OF HOURS REACTOR WAS CRITICAL 572.9 1,684.0 118,653.0.
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 556.9 1,451.1 116,029.5 15.-UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,399,227 3,548,811 293,863,630
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 456,919 1,171,996 97,645,542-
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 435,051 1,116,636 92,920,918
- 19. UNIT SERVICE FACTOR 77.3 33.4 69.1
- 20. UNIT AVAILABILITY FACTOR 77.3 33.4 69.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 72.4 30.9 67.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 71.5 30.4 65.5
- 23. UNIT FORCED OUTAGE RATE 22.7 25.8 9.0
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A t
1 4
4
~
f
+
m
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-317 UNIT NAhtE Cahrrt Cliffs-UI DNE July 15.1994 COMPLETED BY Frank Piazza TELEPHONE (410) 260-3821 REPORTh!ONTII June 1994 METIIOD OF SIIUTI1NG LICENSEE CAUSE & CORRECI1VE DURATION DOWN EVENT SYSTEM COMPONENT ACTION TO 4
CODES PREVENT RECURRENCE 3
REPORT #
CODE (IlOURS)
REASON 2 REACTOR NO.
DATE TYPEI 94 45 940527 F
129.9 A
4 N/A TA TRB The unit was manually shutdown on May 27,1994 due to number 7 Main Turbine Bearing overhcating.
The bearing was repaired and returned to sersice.
944)6 940612 F
0 A
5 N/A JB SC Power was reduced on 6/12N4 at 1732 to correct speed oscillation problem with 11 Steam Generator Feed Pump. The problem was caused by a small amount of dirt in the pilot valve. The problem was correctc d by cleaning the pilot valve.
94-07 940616 F
33.2 0
3 317N4006 TA SilV A reactor trip occurred on 6/16N4 at 0135 during a weekly Operations Performance Evaluation. The trip occurred during the testing when all Turbine Stop Valves closed. When the Turbine Stop Valves closed, the Main Turbine tripped which caused the Reactor to trip automatically on loss ofload. An investigation team was immediately formed to determine the cause of the Stop Valves closure.
The investigation is currently ongoing. The reactor was returned to power at 1047 on 6/17N4.
I F: Forced 2 Reason:
3 hiethod:
4 IEEE Standard 805-1984 S: Scheduled A-Equipment Failure 1 - hianual B - hiaintenance or Test 2-Afanual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examinr. tion 5 - Reduced Load F-Administrative 9 - Other G - Operational Error H - Other
i AVERAGE DAILY UNIT POWER LEVEL o***********************************************************************
Docket No. 50-317 Calvert Cliffs Unit No. 1 July 15, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 i
JUNE 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 0
17 234 2
0 18 843 3
0 19 848 4
0 20 845 5
0 21 848 6
142 22 845 7
590 23 848 8
720 24 846 9
720 25 848 J
10 731 26 847 11 821 27 849 12 750 28 845 13 744 29 846 j
14 822 30 845 15 829 16 25
- i
- DOCKETNO.50-317-CALVERT CLIFFS - UNIT 1 i
July 15,1994
SUMMARY
OF OPERATING EXPERIENCE
]
June 1994 The unit began the month shutdown in mode 5 because of ongoing repairs to the number 7 Main Turbine Bearing. The bearing problem was detected on May 27,1994. The bearing repairs were completed on June 4,1994 and the unit was paralleled to the grid at 0954 on June 6,1994.
On June 12,1994 power reduction commenced at 1732 to allow repair of 11 Steam Generator Feed Pump oscillation problems. The problems were corrected and the unit began returning to full power j
at 0430 on June 13,1994.
1 On June 16,1994 the reactor tripped during an Operation weekly test of the Main Turbine Stop Valves. The trip occurred during the testing when all the Turbine Stop valves closed. The closure of the Turbine Stop valves tripped the Main Turbine and, subsequently, the Reactor. An investigation team was immediately formed to determine the root cause. On all subsequent tests the Turbine Stop -
Valves worked according to design. Vendor assistance was obtained to aide in determining the cause; their report is forthcoming. The unit was returned to power on June 17,1994 at 1047. The unit ended the month a 100% reactor power.
~*
- July 8,1994 NFM 94196 1
,Page 2 of 3 ILEFUELING INFORMATION REQUEST
'l 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
Scheduled date for next refueling shutdown: March,1996.
3.
Schedum) date for restart following refueling: May,1996.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
None identified at this time.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Unknown.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1514 (Note 2)
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies.
(a) 4710 (Note 1)
(b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2014 t
NOTE 1:
4710 testallicensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
72 Spent Fuel Assemblies in the ISFSI.
I
ee***-***********************************************************************
UNIT 2 OPERATING DATA REPORT Docket No. 50-318 July 15, 1994 Prepared by Frank Piazza i
Telephone:(410)260-3821 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2 2.
REPORTING PERIOD JUNE 1994
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 911 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 720 4,343-151,199
- 12. NUMBER-OF HOURS REACTOR WAS CRITICAL 720.0 4,023.1' 110,059.9_
13.-REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6 14.-HOURS GENERATOR ON LINE 720.0 4,018.2 108,541.8 15.~ UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,938,670 10,663,175 277,528,718
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 638,606 3,575,295 91,731',164
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 613,340 3,433,976 87,677,110
- 19. UNIT SERVICE FACTOR' 100.0 92.5 71.8
- 20. UNIT AVAILABILITY FACTOR 100.0 92.5 71.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.4 95.1 70.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.8 93.6 68.6
- 23. UNIT FORCED OUTAGE RATE 0.0 4.2 5.7 24.. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A-
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, l
ESTIMATED DATE OF START-UP:
N/A i
i
-.-..,e e
+
t
UNIT S11UTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-318 UNIT NAME Calvert Cliffs-U2 DATE Jutv15.1994 COMPLETED BY Frank Piana TELEPHONE (410) 260-3821 REPORT MONTII June 1994 MET 110D OF SIIUTUNG LICENSEE CAUSE & CORRECUVE DURATION DOWN EVENT SYSTEM COMPONENT ACHONTU 4
CODES PREVENT RECURRENCE (IIOURS)
REASON 2 REACTOR 3 REPORT #
CODE NO.
DATE TYPEI There were no significant power reductions this month.
1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A-Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Imad F-Administrative 9 - Other
1 l
- _.. *^
)
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 July 15, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 JUNE 1994 l
'i Average Daily Power Level Average Daily Power Level i
Day (MWe-Net)
Day (MWe-Net) 1 860 17 847 1
i 2
858 18 850 3
858 19 850 4
858 20 844
.l 5
857 21 847
}
6 860 22 844 j
l 7
859 23 848 i
8 856 24 845 9
855 25 848 10 857.
26 847 r
11 858 27 848 12 857 28 843 13 858 29 845 14 857 30 842 15 853 16 847 v
1 1
l
DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 July 15,1994
SUMMARY
OF OPERATING EXPERIENCE June 1994 The unit remained at 100% power the entire month.
s
- l.
July 8,' 1994 NFM 94-196
,Page 3 of 3 BEFUELING INFORMATION RE_ QUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown: February 18,1995.
3.
Scheduled date for restart following refueling: May 3,1995.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Unknown.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Unknown.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a)- 217 (b) 1514 (Note 2)
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (Note 1)
(b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2016.
NOTE 1:
4710 totallicensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
72 Spent Fuel Assemblies in the ISFSI.
.