ML20071H463

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Proposed Const of Facilities. Designation Requested as Cooperating Agency in EIS Preparation.K Bracken Assigned for Project
ML20071H463
Person / Time
Site: Skagit
Issue date: 02/26/1982
From: Vaughan W
ENERGY, DEPT. OF
To: Regan W
Office of Nuclear Reactor Regulation
References
NUDOCS 8203080427
Download: ML20071H463 (1)


Text

50-%

50493 e n. O Department of Energy #

FEB 2 61982 Washington, D.C. 20585 REC;Hv;En g 9-

MR041ggy :

E nEwWil*?a

=

/

l William H. Regan, Jr., Chief Siting Analysis Branch Division of Engineering Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Regan:

This is in response to your letter of January 22, 1982, regarding the proposed construction of the Skagit/Hanford Nuclear Project by the Puget Sound Power and Light Company to be located at Richland, Washington. In that letter you invited the Department of Energy (DOE) to request designation as a cooperating agency in the preparation of the environmental impact statement (EIS) for the project to be prepared by the Nuclear Regulatory Commission. DOE hereby requests designation as a cooperating agency" in the EIS preparation.

Mr. Ken Bracken, Director of the Facility and Site Services Division at our Richland Operations Office, is designated as the point of contact for the Department for this project.

If you have any questions regarding the project, please call Mr. Bracken at (FTS 444-7770). Questions regarding DOE's NEPA process may be directed to Mr. Ray Pelletier (202-252-4610).

We look forward to working with you on this EIS.

Sincerely,

.. n M

William A. Vaughan'[

~

Assistant Secretar Environmental Protection, Safety, and Emergency Preparedness cc: Ken W. Bracken, Richland Operations Office 6

r203000427 820226 0? l8 0 PDR ADOCK 05000

- .- __