ML20071H180
ML20071H180 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 05/23/1983 |
From: | Weiss E HARMON & WEISS, UNION OF CONCERNED SCIENTISTS |
To: | Ahearne J, Asselstine J, Palladino N NRC COMMISSION (OCM) |
Shared Package | |
ML20071H181 | List: |
References | |
CLI-83-11, NUDOCS 8305240538 | |
Download: ML20071H180 (1) | |
Similar Documents at Indian Point | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217B3331999-10-0707 October 1999
[Table view]Responds to 990825 Telephone Call Re Presense of Polychlorinated Biphenyl Wastes at Plant,Unit 1 ML20212F4481999-09-17017 September 1999 Forwards NRC Form 536 Containing Currently Proposed Site Specific Operator Licensing Exam Schedule & Estimates of Number of Applicants for Generic Fundamentals Exams Through Cy 2003 ML20212F7051999-09-14014 September 1999 Forwards Rev 19 to Ipn,Units 1 & 2 Physical Security Plan. Plan Withheld,Per 10CFR2.790(d) & 73.21 ML20211N0681999-09-0202 September 1999 Informs That Commission Requested Publication of Notice of Consideration of Issuance of Amend to Fol,Proposed NSHC Determination & Opportunity for Hearing. Amend Changes Senior Reactor License Requirement for Operations Manager ML20211H6291999-08-26026 August 1999 Forwards NPDES Discharge Monitoring Rept for July 1999 for Indian Point,Units 1,2 & 3. Rept of Noncompliance Is Attached for Noncompliance Which Occurred at Unit 3 ML20211E1531999-08-18018 August 1999 Forwards Semi Annual fitness-for-duty Program Performance Data for 990101-990630,IAW 10CFR26.71(d) ML20211H6051999-08-18018 August 1999 Forwards Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant.Rev Facilitates Transition of Duty Weapons Carried by Security Force Members from Revolvers to Semiautomatic Pistols ML20211A9241999-08-11011 August 1999 Informs That IPS Currently Estimates,That Approx Two Licensing Actions Will Be Submitted to NRC During Remainder of 1999 NRC Fiscal Yr & Approx Ten Will Be Submitted During 2000 NRC Fiscal Yr ML20210M7251999-07-26026 July 1999 Forwards Projection of Ability to Pay Retrospective Premium Adjustment for Period of Aug 1999 to 000731, Which Demonstrates That Ceny Will Have Sufficient Cash Flow &/Or Cash Reserve Available Throughout Period to Pay Premium ML20210G8911999-07-20020 July 1999 Forwards Application for Amend to License DPR-5 for Proposed New TS 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager ML20209B6611999-06-29029 June 1999 Returns Recently Submitted Renewal Applications,Nrc Form 398,for Three Reactor Operators,As They Are Not Completed Properly.List of Docket Numbers & Block Numbers That Contain Incorrect Info & Block Numbers Not Completed.Without Encls ML20196A6371999-06-15015 June 1999 Forwards Rev 19 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) & 73.21 ML20207D1861999-05-27027 May 1999 Informs That Effective 990328,NRC Office of NRR Underwent Reorganization.Mt Masnik Section Chief for Indian Point Station,Unit 1.JL Minns Remains Primary Contact for All Routine Licensing & Administrative Matters.Chart Encl ML20205R1981999-04-15015 April 1999 Requests That Dept of Environ Conservation Modify SPDES Permit for IPS IAW Proposed Rev Attached & Described as Listed ML20205R2961999-04-15015 April 1999 Forwards Copy of Proposed Change to Indian Point SPDES Permit NY0004472.Proposed Change Requests Permission to Add Permitted Outfall to Plant as Well as Change Character of Existing Outfall.Without Encl ML20196K8111999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Indian Point,Units 1 & 2 Through 981231 ML20205F9711999-03-25025 March 1999 Informs That Under Separate Cover,Licensee Transmitted to Ofc of Nuclear Regulatory Research Annual Rept of Results of Individual Monitoring at Indian Point,Units 1 & 2,for CY98 ML20204F7931999-03-17017 March 1999 Forwards Table Outlining Nuclear Property Insurance Which Has Been Placed on Behalf of Consolidated Edison Co of Ny, Inc.Insurance Covers Indian Point,Units 1 & 2 ML20204J9971999-03-0909 March 1999 Forwards Insp Rept 50-003/98-19 on 981130-990222.No Violations Noted ML20203B9001999-02-0808 February 1999 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Already Available in PDR, Documents in App B Released in Entirety & Documents in App C Being Withheld in Part (Ref Exemption 6) ML20202J6171999-02-0505 February 1999 Forwards Transcript from 990120 Public Meeting Held in Peekskill,Ny Re Decommissioning ML20199H3731999-01-11011 January 1999 Informs That T Schmeiser,Con Ed Plant Manager for Plant Is Retiring,Effective 990111.AA Blind Will Assume Duties & Responsibilities of Plant Manager Until Replacement Named ML20198E9561998-12-21021 December 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities Re Deliberate Misconduct in Violation of Regulation When False Info Was Provided to Two NRC Licensees ML20198C2371998-12-15015 December 1998 Ltr Contract:Task Order 237, Review & Evaluation of Indian Point 3 Nuclear Power Plant Application for Conversion to Improved TS, Under Contract NRC-03-95-026 ML20198C4911998-12-11011 December 1998 Forwards Rev 18 to Physical Security Plan,Reflecting Organizational Changes & Incorporating Administrative Corrections & Clarifications.Encl Withheld ML20198C3251998-12-11011 December 1998 Responds to ,Responding to NRC Ltr Re Concerns Raised About Potential Chilling Effect from Temp Denial of Site Access to Employee Raising Safety Issues to Util Senior Mgt ML20155H2901998-11-0303 November 1998 Responds to to Lj Callan Expressing Concern About Continued Operation of Indian Point Nuclear Generating Station.Explanation Why NRC Do Not Think Revoking OLs for Indian Point Units 2 & 3 Justified,Provided ML20155F9181998-10-28028 October 1998 Forwards Changes to SPDES Permit,Removing Requirement to Monitor Svc Boiler Blowdown for Phosphates,Eliminate Redundant Sampling of Oil or Grease Entering Flow Tributary to Floor Drains,Per Ts,App B,Section 3.2 ML20155D2791998-10-23023 October 1998 Forwards Corrected Pages for Indian Point Annual Radiological Environ Operating Rept for 1997 ML20154Q1761998-10-21021 October 1998 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Withheld in Part (Ref FOIA Exemption 7) ML20154L8031998-10-16016 October 1998 Ack Receipt of & Payment in Amount of $55,000 in Electronic Funds for Civil Penalty Proposed by NRC in .Corrective Actions Will Be Examined During Future Insp ML20155H3021998-09-24024 September 1998 Urges NRC to Revoke Operating Licenses for Indian Point Nuclear Generating Station,Units 2 & 3 & Not Renew OL for Unit 1 ML20154A1391998-09-22022 September 1998 Informs That Effective 980724,AA Blind Assumed Position of Vice President,Nuclear Power & Ja Baumstark Assumed Position of Vice President,Nuclear Power Engineering,Effective 980813 ML20153F0661998-09-18018 September 1998 Provides Response to Violations Noted in Insp Rept 50-286/98-05 & Proposed Imposition of Civil Penalty Dtd 980819.Corrective Actions:Existing Drawings for Spare Switchgear Cubicles Have Been Revised ML20151W4871998-09-10010 September 1998 Informs That as Part of NRC Probabilistic Risk Assessment Implementation Plan,Commission Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Has Been Assigned as SRAs for Region I ML20151W9511998-09-10010 September 1998 Informs That as Part of NRC PRA Implementation Plan, Commission Has Assigned Two Senior Reactor Analysts (Sras) to Regional Ofc.T Shedlosky & J Trapp Has Been Assigned SRAs Duties for Region I ML20155F4391998-08-26026 August 1998 Forwards Demand for Info,Being Issued to Enable NRC to Fully Understand Recipient Views on Facts & Circumstances Surrounding Allegedly False Info Provided to Two NRC-licensed Activities ML20238F5151998-08-26026 August 1998 First Partial Response to FOIA Request for Documents. Documents Listed in App a Being Released in Entirety. Documents Listed in App B Being Withheld in Part (Ref FOIA Exemption 6) IR 05000286/19980051998-08-19019 August 1998 Discusses Insp Rept 50-286/98-05 on 980528-0612 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $55,000.Most Significant Violation Involved Failure, Following Design Mod in Oct 1997 ML20237B1001998-08-0505 August 1998 Responds to NRC Re Violations Noted in Insp Repts 50-247/97-13,50-247/97-15,50-247/98-02 & Investigation Rept 1-97-038,respectively.Corrective Actions:Acted Promptly to Assure Conforming to Testing Requirements ML20236X8511998-07-31031 July 1998 Forwards Rept Re Projection of Ability to Pay Retrospective Premium Adjustment for Period 980801-990731,per 10CFR140.21 ML20236V4211998-07-13013 July 1998 Forwards SER Approving Topical Repts WCAP-14333P & WCAP-14334NP (Proprietary & non-propiretary, PRA of RPS & ESFAS Test Times & Completion Times ML20236Q1431998-07-0808 July 1998 Responds to Administrative Ltr 98-03 Re Operating Reactor Licensing Action Estimates IR 05000247/19970131998-07-0606 July 1998 Discusses Insp Repts 50-247/97-13,50-247/97-15 & 50-247/98-02 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000 ML20238F5231998-06-29029 June 1998 FOIA Request for Documents Re NRC Office of Investigation Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20154Q1831998-06-29029 June 1998 FOIA Request for Documents Re NRC OI Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety ML20248F2891998-05-26026 May 1998 Ltr Contract:Task Order 8, Indian Point 2,A/E Follow-up Insp, Under Contract NRC-03-98-021 ML20248L9861998-05-21021 May 1998 Forwards Rev 7 to Security Force Training & Qualification Plan.Review to Verify Receipt of Revised Plan & Sign & Return Receipt Ack Form Provided ML20247M6951998-05-20020 May 1998 Forwards RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, for Plant,Unit 2 1999-09-02 Category:INCOMING CORRESPONDENCE MONTHYEARML20212F4481999-09-17017 September 1999
[Table view]Forwards NRC Form 536 Containing Currently Proposed Site Specific Operator Licensing Exam Schedule & Estimates of Number of Applicants for Generic Fundamentals Exams Through Cy 2003 ML20212F7051999-09-14014 September 1999 Forwards Rev 19 to Ipn,Units 1 & 2 Physical Security Plan. Plan Withheld,Per 10CFR2.790(d) & 73.21 ML20211H6051999-08-18018 August 1999 Forwards Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant.Rev Facilitates Transition of Duty Weapons Carried by Security Force Members from Revolvers to Semiautomatic Pistols ML20211E1531999-08-18018 August 1999 Forwards Semi Annual fitness-for-duty Program Performance Data for 990101-990630,IAW 10CFR26.71(d) ML20211A9241999-08-11011 August 1999 Informs That IPS Currently Estimates,That Approx Two Licensing Actions Will Be Submitted to NRC During Remainder of 1999 NRC Fiscal Yr & Approx Ten Will Be Submitted During 2000 NRC Fiscal Yr ML20210M7251999-07-26026 July 1999 Forwards Projection of Ability to Pay Retrospective Premium Adjustment for Period of Aug 1999 to 000731, Which Demonstrates That Ceny Will Have Sufficient Cash Flow &/Or Cash Reserve Available Throughout Period to Pay Premium ML20210G8911999-07-20020 July 1999 Forwards Application for Amend to License DPR-5 for Proposed New TS 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager ML20196A6371999-06-15015 June 1999 Forwards Rev 19 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) & 73.21 ML20205R2961999-04-15015 April 1999 Forwards Copy of Proposed Change to Indian Point SPDES Permit NY0004472.Proposed Change Requests Permission to Add Permitted Outfall to Plant as Well as Change Character of Existing Outfall.Without Encl ML20196K8111999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Indian Point,Units 1 & 2 Through 981231 ML20205F9711999-03-25025 March 1999 Informs That Under Separate Cover,Licensee Transmitted to Ofc of Nuclear Regulatory Research Annual Rept of Results of Individual Monitoring at Indian Point,Units 1 & 2,for CY98 ML20204F7931999-03-17017 March 1999 Forwards Table Outlining Nuclear Property Insurance Which Has Been Placed on Behalf of Consolidated Edison Co of Ny, Inc.Insurance Covers Indian Point,Units 1 & 2 ML20199H3731999-01-11011 January 1999 Informs That T Schmeiser,Con Ed Plant Manager for Plant Is Retiring,Effective 990111.AA Blind Will Assume Duties & Responsibilities of Plant Manager Until Replacement Named ML20198C4911998-12-11011 December 1998 Forwards Rev 18 to Physical Security Plan,Reflecting Organizational Changes & Incorporating Administrative Corrections & Clarifications.Encl Withheld ML20155F9181998-10-28028 October 1998 Forwards Changes to SPDES Permit,Removing Requirement to Monitor Svc Boiler Blowdown for Phosphates,Eliminate Redundant Sampling of Oil or Grease Entering Flow Tributary to Floor Drains,Per Ts,App B,Section 3.2 ML20155D2791998-10-23023 October 1998 Forwards Corrected Pages for Indian Point Annual Radiological Environ Operating Rept for 1997 ML20155H3021998-09-24024 September 1998 Urges NRC to Revoke Operating Licenses for Indian Point Nuclear Generating Station,Units 2 & 3 & Not Renew OL for Unit 1 ML20154A1391998-09-22022 September 1998 Informs That Effective 980724,AA Blind Assumed Position of Vice President,Nuclear Power & Ja Baumstark Assumed Position of Vice President,Nuclear Power Engineering,Effective 980813 ML20153F0661998-09-18018 September 1998 Provides Response to Violations Noted in Insp Rept 50-286/98-05 & Proposed Imposition of Civil Penalty Dtd 980819.Corrective Actions:Existing Drawings for Spare Switchgear Cubicles Have Been Revised ML20237B1001998-08-0505 August 1998 Responds to NRC Re Violations Noted in Insp Repts 50-247/97-13,50-247/97-15,50-247/98-02 & Investigation Rept 1-97-038,respectively.Corrective Actions:Acted Promptly to Assure Conforming to Testing Requirements ML20236X8511998-07-31031 July 1998 Forwards Rept Re Projection of Ability to Pay Retrospective Premium Adjustment for Period 980801-990731,per 10CFR140.21 ML20236Q1431998-07-0808 July 1998 Responds to Administrative Ltr 98-03 Re Operating Reactor Licensing Action Estimates ML20238F5231998-06-29029 June 1998 FOIA Request for Documents Re NRC Office of Investigation Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20154Q1831998-06-29029 June 1998 FOIA Request for Documents Re NRC OI Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20248L9861998-05-21021 May 1998 Forwards Rev 7 to Security Force Training & Qualification Plan.Review to Verify Receipt of Revised Plan & Sign & Return Receipt Ack Form Provided ML20217F8501998-03-20020 March 1998 Forwards Table Which Outlines Nuclear Property Insurance That Has Been Placed on Behalf of Util,Per 10CFR50.54(w)(3) ML20199L9531998-01-26026 January 1998 Forwards Addl Info on Rev 6 to Security Force Training & Qualification Plan,Per 980113 Telcon Request of G Smith.Encl Withheld ML20199F7541998-01-21021 January 1998 Forwards Rev 17 to Physical Security Plan,Per Requirements of 10CFR50.54(p).Rev 17 Contains Summary of Changes, Detailing Changes Incorporated.Encl Withheld ML20198N1151998-01-20020 January 1998 Submits Status of Response to NRC Request for Addl Info, for Licenses TR-3 & R-93.Request for Commitment to Complete Decommissioning Activities by 2007 Has Been Persued Up Through Nasa Mgt ML20202F8281997-11-26026 November 1997 Reports Mod to Indian Point SPDES Permit as Required in Ts. Copy of New York State Dept of Environ Conservation Ltr That Modifies Permit Is Encl ML20198P7901997-10-31031 October 1997 Forwards Rev 6 to Physical Security Plan,Per 10CFR50.4(b)(4) to Meet Requirements of 10CFR50.54(p).Rev 16 Contains Summary of Changes, Detailing Changes Incorporated. Encl Withheld ML20198P3181997-10-30030 October 1997 Forwards Corrected Pages to Annual Radiological Environ Operating Rept for 1996 ML20211H7771997-10-0202 October 1997 Forwards Responses to RAIs 650.1 Through 650.8 Re Generic Issues & Generic Communications on Valve Testing & Valve Qualification.Westinghouse Status for Subject Issues Will Be Confirm W Pending Rev to Ssar & WCAP-13559 ML20211B4241997-09-19019 September 1997 Requests Withdrawal of Revs 16 & 18 to Physical Security Plan.Rev 16 re-submitted Per Provisions of 10CFR50.54(p)(2) & Deals W/Specific Operational Criteria of New Sys.Plan Withheld ML20211A9411997-09-18018 September 1997 Responds to NRC Re Violations Noted in Insp Rept 50-286/97-80.Corrective Actions:Revised Administrative Procedure AP-3 to Establish Responsibility for Engineering Review & Revised EOP ES-1.3 ML20149J2491997-07-16016 July 1997 Forwards Environ Ts/Nonroutine Event Rept for Units 1 & 2. Appropriate Ny State Agency Notified ML20148S5731997-06-26026 June 1997 Forwards Response to NRC Re Violations Noted in Insp Repts 50-247/96-80;96-07;96-08;97-03 & Imposition of Civil Penalties on 961027-970405.Corrective Actions:Unique Tag Numbers for Louvers Were Generated ML20148J1431997-06-0404 June 1997 Forwards Rev 15A to Ipn Units 1 & 2 Physical Security Plan, Per 10CFR50.54(p)(2).Plan Withheld ML20137M8371997-04-0101 April 1997 Provides Supplemental Response to RAI Re TS Change Request 96-01 on Conversion to Framatome Cogema Fuel.Tech Specs, Encl ML20137A8301997-03-13013 March 1997 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-286/96-80 on 961213.Corrective Actions:Expert Panel Has Agreed to Include Turbine Bldg & Power Conversion Equipment Bldg in Scope of IP3 Maint Rule Program JPN-97-008, Forwards Comments on Draft NUREG-1560, IPE Program: Persprctives on Reactor Safety & Plant Performance1997-03-0404 March 1997 Forwards Comments on Draft NUREG-1560, IPE Program: Persprctives on Reactor Safety & Plant Performance ML1004713451997-02-26026 February 1997 Forwards Proprietary & non-proprietary Versions of W Rept Entitled, Conditional Extension of Rod Misalignment TS for Indian Point 3. Authorization Ltr & Affidavit,Encl. Proprietary Encl Withheld Per 10CFR2.790 ML20135C7121997-02-21021 February 1997 Forwards Table That Outlines Nuclear Property Insurance on Behalf of Util Covering Units 1 & 2 ML1004713471997-02-18018 February 1997 Authorizes Utilization of Encl Affidavit by Util Re WCAP-14669,Rev 1, Conditional Extension of Rod Misalignment TS for Indian Point 3. Rept Should Be Withheld Per 10CFR2.790(b)(4) ML20134N6481996-12-24024 December 1996 Provides Further Details Re Corporate Reorganization of Consolidated Edison Co of Ny for Indian Point Units 1 & 2 ML20132C8071996-12-12012 December 1996 Forwards Check for $100 for Payment of NRC Invoice 7I0053 for Indemnity Fee on License DPR-5 for One Year Period 961204-971203.W/o Check ML20129D9611996-10-11011 October 1996 Forwards Controlled Copy of Plant Physical Security Plan,Rev 18,re Access Control Upgrade Which Adopts Biometric Hand Geometry.W/O Encl ML20117P6151996-09-11011 September 1996 Forwards Rev 9 to Security Training & Qualification Plan.W/O Encl ML20117E3891996-08-21021 August 1996 Forwards Four Copies of IP3 Security Contingency Plan,Rev 4. W/O Encl JPN-96-035, Informs NRC That Boraflex Not Used as Neutron Absorber in Either Util or Plant Spent Fuel Pool Storage Racks,Per GL 96-041996-08-0606 August 1996 Informs NRC That Boraflex Not Used as Neutron Absorber in Either Util or Plant Spent Fuel Pool Storage Racks,Per GL 96-04 1999-09-17 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML20059H5541990-09-11011 September 1990
[Table view]Forwards Endorsements 153,128 & 178 to Nelia Policies NF-170,NF-208 & NF-100 & Endorsements 136,115 & 159 to Maelu Policies MF-47,MF-77 & MF-29 ML18095A2541990-05-29029 May 1990 Forwards Endorsements 118-120 & 122-127 to Nelia Policy NF-208,Endorsements 105-107 & 109-114 to Maelu Policy MF-77 & Endorsements 13-14 to Certificates N-7/M-7 & N-47/M-47 ML18094A6521989-08-24024 August 1989 Forwards Endorsements 140 & 141 to Nelia Policy NF-164, Endorsements 117 & 118 to Maelu Policy MF-44,Endorsements 115 & 116 to Nelia Policy NF-208 & Endorsements 102 & 103 to Maelu Policy MF-77 ML20245D3421989-03-20020 March 1989 Forwards Listed Endorsements,Including Endorsements 14,163, 144,94,75,39 & 31 to Nelia Policies NF-295,NF-100,MAELU Policy MF-29,NELIA Policy NF-182,MAELU Policy MF-61,NELIA Policy NF-281 & Maelu Policy MF-112,respectively ML18093A8111988-04-28028 April 1988 Forwards Endorsements 102 & 103 to Nelia Policy NF-208, Endorsements 89 & 90 to Maelu Policy MF-77,Endorsements 100 & 101 to Nelia Policy NF-230 & Endorsements 84 & 85 to Maelu Policy MF-90 ML20148K1111988-03-22022 March 1988 Forwards Listed Endorsements to Listed Policies,Including Endorsement 102 to Maelu Policy MF-26,Endorsement 123 to Nelia Policy NF-76,Endorsement 71 to Maelu Policy MF-56 & Endorsement 89 to Nelia Policy NF-189 ML20083M3681984-02-17017 February 1984 FOIA Request for Three Categories of Documents Re Inherent Weaknesses in Metal Alloys Used in Cooling Tubes in Nuclear Power Plants,Indian Point 2 & 3 in Particular ML20072J4081983-06-28028 June 1983 Advises That Tayloe Assoc Delivering Exhibits,Contained in Hearing Record Since 830322 Until Record Closed,To Pdr.Some Exhibits Not Furnished or Only One Copy Furnished ML20071H1801983-05-23023 May 1983 Forwards Comments on Commission Order CLI-83-11 Establishing Procedures for Decision on Enforcement Action ML20072U3301983-04-0505 April 1983 Transmits Listed Documents Per ASLB Requests at 830325 Hearing.W/O Encl ML20071A9311983-02-23023 February 1983 Forwards Corrected 830125 Testimony of Wh Spataro,Pp 6,551-53 & 6,559 ML20028E8691983-01-25025 January 1983 Forwards TE Potter Resume Inadvertently Omitted from Potter 830124 Testimony on ASLB Question 1.3 ML20028E8671983-01-24024 January 1983 Advises That Util Instructed Westinghouse to Send Probabilistic Safety Study ML20070R2151983-01-24024 January 1983 Forwards Testimony of WR Stratton,Wa Rodger & TE Potter on Commission Question 1.Related Correspondence ML20067D7731982-12-17017 December 1982 Forwards Congressman Rl Ottinger to Util Seeking Testimony Before Congress Re Investigation.Util 821203 Response Encl ML20027D0851982-10-25025 October 1982 Requests Commission Issue Order Directing All Meetings Between NRC & Licensee Be Held in Washington,Dc or Ny,That Intervenors Receive Notice of Meetings Concurrently W/Utils & That Intervenors Be Provided W/Minutes of 821013 Meeting ML20069J8191982-10-19019 October 1982 Requests Substitution of SL Baum W/Tr Frey on Official Svc List for Proceeding.Related Correspondence ML20065A1321982-09-0909 September 1982 Forwards PASNY Comments Re Commission 820727 Order to Reformulate Contentions.Public Participation Should Not Be Excised from Process.Commission Should Hear Intervenors Before Noting on Order.Certificate of Svc Encl ML20062L4641982-08-17017 August 1982 Lists Corrections to Licensee 820813 Response to ASLB 820809 Memorandum & Certification ML20058B8821982-07-19019 July 1982 Requests Time,At Next Scheduled Limited Appearance Hearing, to Present Concerns of Hendrick Hudson Central School District ML20055B1371982-07-19019 July 1982 Forwards on Behalf of Pasny,Addressing Issues Raised by Draft Memorandum & Order Distributed Prior to Commission 820709 Meeting Re Status of Proceeding.Draft Order Unaffected by 10CFR9.103 ML20071K2551982-07-13013 July 1982 FOIA Request for Eight Categories of Records Re Steam Generators & Steam Turbines ML20054K5121982-06-28028 June 1982 Forwards FEMA Responses to ASLB Questions on Extent to Which Panic & Psychological Stress Were Factored Into FEMA-REP-1, NUREG-0654,re Persons Who Panic in Disaster Situations.Svc List Encl ML20054H7051982-06-16016 June 1982 Forwards Rs Jurkowski,Ab Delbello,Fc Bohlander,As Curran, Wg Borghard,M Kaminski & AR Marasco Testimony Re Emergency Evacuation Plan.F Bohlander & AB Delbello Should Be Added to Witness List.Certificate of Svc Encl.Related Correspondence ML20053D2091982-05-27027 May 1982 Discusses Status of Matters Raised in 820510 & 12 Ltrs to Rockland Citizens for Safe Energy & Parents Concerned About Indian Point,In Response to 820525,request ML20053D2041982-05-27027 May 1982 Maintains That Us Court of Appeals for DC Circuit 820514 Opinion Under NEPA Applies Only to TMI Site.Licensee 811201 Motion to Exclude Fear as Issue in Proceeding Unaffected ML20054K5231982-05-24024 May 1982 Urges That Hearing Re Facility Be Scheduled at Earliest Possible Time.Evening Sessions Requested ML20052G8671982-05-13013 May 1982 Forwards Vol 1 of Indian Point Probabilistic Safety Study Per Request.W/O Encl.Related Correspondence ML20052D0551982-05-0303 May 1982 Explains Decision to Quote Oh Paris Statement.No Intent Existed to Alter Meaning or to Quote Out of Context. Incorrect Transcript Cite Due to Typographical Error ML20049H8691982-02-24024 February 1982 Forwards Licensee Answers to Ucs/Ny Pirg Discovery Motion Per Request.W/O Encl ML20040C0991982-01-18018 January 1982 Forwards DC Court of Appeals Judgment 81-1131,ordering NRC to Prepare Environ Assessment on Psychological Stress.Util Argument to Exclude Intervenors Who Exacerbated Fear Unaffected.Certificate of Svc Encl ML20040B1181982-01-14014 January 1982 Forwards Dl Sapir Statement for Inclusion in Record Re ASLB Procedural Deficiencies ML20039G0541982-01-0606 January 1982 Forwards Util Objections & Answers to Contentions of Potential Intervenors,Replacing Copy Filed on 811231 Which Did Not Contain Page 37 ML20039E2851981-12-10010 December 1981 Forwards AR Fried Affidavit Authorizing Ny City Audubon Soc to Represent Affiant in Proceeding.Affidavit of Svc Encl ML20038B9401981-12-0707 December 1981 Requests Dh Pikus of Shea & Gould Be Added to Official Svc List.Certificate of Svc Encl ML20011B2451981-11-20020 November 1981 Forwards Licensees' Motion for Leave to Intervene in Us Court of Appeals,Second Circuit Ucs Vs Nrc.Related Correspondence ML20010G4201981-09-17017 September 1981 Requests That Commission Focus on Issue of NRC Role in Proceeding During Discussion of Revision to Order Establishing Hearings on Facility Safety.Imperative That NRC Take Different Role from Usual Role Taken in Routine Cases ML19343B0391980-10-30030 October 1980 FOIA Request for Transcripts of All Commission &/Or Staff Meetings Since 801017 Re Accident at Facility ML19263B6551979-01-12012 January 1979 Forwards Licensee Comments Re closed-cycle Cooling Conditions in Response to NRC 781115 Memo & Order ML20064H8011978-12-19019 December 1978 Informs That Us Court of Appeals for Second Circuit Denied Petition for Rehearing & Rehearing En Banc Re closed-cycle Cooling Conditions ML20064H6601978-12-15015 December 1978 Forwards Brief by Util Water Act Group,Edison Elec Inst & Natl Rural Elec Coop Assoc Re Water Quality Regulation ML1002508951975-10-14014 October 1975 Forwards Wj Cahill 751010 Ltr W/Electrical Drawings. Exemption from Public Disclosure W/Present Ltr Requested. Drawings Would Be Helpful to Persons Bent on Industrial Sabotage ML20090B8301971-03-0404 March 1971 Forwards Answers to 710222 Second Round Informal Questions from Hudson River Fishermens Assoc ML19312C7931967-09-0808 September 1967 Forwards Schedule of Documentary Proof as Indication of Type of Documentary Evidence to Be Adduced Per 670830 Order. Reaffirms Statement from 670905 Motion Re Filing of Competing Application for OLs by 670912 1990-09-11 |
Text
. .
II ARMON & WEISS 172 5 1 STR E ET, N W SulTE So6 call monEEvy saamo" WAsnixorox, D.C. aoooo ' x 'c'cPHo"c ELLYN R WEISS WILLIAM S Jo R D AN, Ill -
j ,)
e j}*l2 o 2) 8 3 3 9 0 7 0 LEE L BISHCP /\ j\
DIANE CURR AN /,f t, j tucia S onts g oE4x a. ToustEv May. ,3 f';;,} 9'83,, _ 6, }
5g M #7,9f Zi
' ?$~. , g, O'
')6
.Gy -
/IQ'~.
r, . N
Nunzio J. Palladino, Chairman John F. Ahearne, Commissioner James K. Asselstine, Commissioner Victor Gilinsky, Commissioner Thomas Roberts, Commissioner U. S. Nuclear Regulatory Commission Washington, D.C. 20555 RE: Indian Point Enforcement Action Docket Nos. 50-247, 50286 Gentlemen:
Enclosed are the Comments of the Union of Concerned Scientists on Order Establishing Procedures for Decision on Enforcement Action, CLI-83-11. Please be advised that the undersigned will appear for UCS at the Commission meeting scheduled for May 26, 1983.
Very truly yours, 1
t;;).-
j lc;% . . ,
Ellyn R. Weiss l
1
! Counsel for Union of Concerned Scientists ERW:cla Enclosure cc: Indian Point Service List l Samuel J. Chilk, Secretary to the Commission l