PHILADELPHIA EL'ECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 SHIELDS L., DALTROFF ELEcTm c Pn oucTeoM May 20, 1983 Docket Nos: 50-277 50-278 Mr. John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing U.S.
Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
Your letter of March 22, 1983 (J.F. Stolz, NRC to E.G.
Bauer, PECO), concerning the clarification of Qualification Safety Evaluation Report, requested Philadelphia Electric Company, by May 20, 1983, to identify electric equipment important to safety that is already qualified, submit a schedule for qualification or replacement of the remaining electrical equipment per 10CFR50.49 Paragraph (g), describe PECO's methods used to identify the equipment covered by 10CFR50.49 (b)(2), and establish any qualification programs not previously described for such equipment.
This letter and the enclosed ' Attachment l' responds to these items as follows:
REQUEST
" Paragraph (g) [of 10CFR50.49] of the rule requires that by May 20, 1983, licensees identify electrical equipment important to safety, within the scope of the rule, that is already qualified and submit a schedule for the qualification or replacement of the remaining electrical equipment within the scope of C
the rule in accordance with the qualification deadline
,0 )
specified in Paragraph (g).
The submittal required j
J by the rule should specifically indicate whether your previous submittals comply with Paragraphs (a) and (b) of 10CFR50.49 In addition, you are requested to describe in your submittal, the methods used to identify the equipment covered by 10CFR50.49(b)(2),
and to establish any qualification programs not previously described for such equipment."
8305240428 830520 PDR ADOCK 05000277 P
8 J.
F.
Stolz, Chief, NRC May 20, 1983 Page 2
RESPONSE
Philcdelphia Electric Company's submittals of January 30, 1981, September 3, 1981, and March 1, 1982, in response to IE Bulletin 79-OlB, Supplement 3, identified electrical equipment important to safety which is already qualified and the September 3, 1981 and March 1, 1982 submittals include a schedule for the remaining equipment for which a modification is required to establish qualification.
PECO has concluded that the equipment contained in Category IIA of the Safety Eyaluation Report (SER) dated December 20, 1982, (equipment qualification not established) is environ-mentally qualified for its intended safety function.
The Philadelphia Electric Company's letter of February 4, 1983 (S.L. Daltroff, PECO to J.F.
Stolz, NRC) stated that equipment listed in Category IIA of the Technical Evaluation Report (TER) dated August 3, 1982, is environ-mentally qualified and PECO has requested a meeting with the staff to present the bases for this conclusion.
Based on this analysis, no additional modifications are required to meet the requirements of 10CFR50.49 Paragraph (g).,
EO Modification Schedule dated May 20, 1983 up-dates the previous submittals.
In ' Attachment l',
the column headed ' Equipment Identi-fication' identifies the equipment requiring modification, and the column headed 'EQ Modification Status' presents dates for completing the modifications.
PECO's previously submitted letters of January 1,
- 1981, 1
September 3, 1981, and March 1, 1982, comply with Paragraphs (a) and (b) of 10CFR50.49 The lists of equipment included in these submittals are based on a review of the PBAPS Q-List, Electrical Schematic Drawings, Piping and Instrument Diagrams (P&ID's) and the FSAR.
The FSAR is the basis for determining the systems required to mitigate the effects of the postulated LOCH and HELB accidents.
The 0-List, Electrical Schematic Drawings and Piping and Instrument Diagrams (P&ID) were reviewed concurrently to det~rmine the role of individual e
electrical components in supporting the operation of systems identified from the FSAR. If it was determined that (1) the failure of the component could prevent the system from performing its safety function and (2) the component was located in a potentially harsh environ-ment, the component was included in 79-OlB Equipment l
List.
i e
J.
F.
Stoltz, Chief, NRC May 20, 1983 Page 3 In addition, the equipment installed in response to the TMI action items has been included in the 79-01B Equipment L1st.
The Emergency Procedures have been reviewed and instrumentation which is relied upon for operator action and is located in a potentially harsh environment has also been included.
Based on the PECO review, modifications installed due to TMI lessons learned and current emergency procedures, it is concluded that PBAPS Units 2 and 3 are in compliance with the requirements contained in Paragraph (b)(2) of 10CFR50.49 Should you require further information, please do not hesitate to contact us.
Very truly yours,
/,-
/
kg
/
Attachment 4
cc:
R.A.
Blough Site Inspector l
.s Docket Nos. 50-277
$0-278
/
9
, ATTACHMENT 1 EQ MODIFICATION SCHEDULE PBAPS UNIT EQUIPMENT IDENTIFICATION NUMBER EQ MODIFICATION STATUS Common OAV20,0BV20,0CV20 These motors will be replaced.
Completion due by 10/83, 2&3 M0-14-11A,11B,12A,12B The brakes en these valve actuators will 2&3 M0-10'-25A,B be replaced; 2&3 MO-23-19 Unit 2 - Completion due by end of 10/83 2&3 M0-1h-26A,B,MO-10-13A,B,0,D Refueling Outage 2&3 M0-23-20,MO-10-3hA,B,M0-10-15hA,B Unit 3 - Completion due by end of 10/8h Refueling Outage 2
M0-23-23 The drive motor will be replaced.
Completionduebyendof10/83 Refueling Outage.
2&3 SV2671A,B,C,D,E,F,G These solenoid valves are being tested 2&3 S72678A,B,0,D,E,F,G by NTS, completion due by 6/84 2&3 SV2980,SV-4777,78,79, 80,82,83,8h,85,92A,B,C,D, SV-h962A,B,0,D, SV-h96hA,B,0,D 2
LS-23-91A,B These level switches will be replaced.
Completion due by end of 10/83 Refueling Outage.
2&3 N3692,N3693,N3772,N3773 This equipment is being tested to 2&3 N3783,N3784,N388h,N3885 resolve the EQ documentation 2&3 N3994,N3995 deficiency. Testcompletiondue6/83 2&3 PS-1h-OhhA,B,C,D,PS-10-120A, B,0,D,E,F,G,H Common LPS-0001h,0001$
This equipment is being tested to resolve the EQ documentation deficiency.
2&3 DPS-20h00-03,04,05,06,07, Test completion due 6/83 2&3 08,09,10,11,12,13,1h,15, 2&3 16,17,18,19,20 Common 0AE65,0BE65 Complete 2&3 EPTB-003 2&3 PS-10-121A,B,C,D 2&3 2AP33,2BP35,2CP35,2DP35 Complete 2&3 20B10,11,12,13 Complete
r Docicot Nos. 50-277 r
50-278 May 20, 1963 EQ MODIFICATION SCHEDULE (CONT)
PBAPS UNIT EQUIPMENT IDENTIFICATION NUMBER EQ MODIFICATION STATUS 2
20D11A An analysis will be performed; 2&3 N210025A,B,20B36,37,38 aPurchaseOrderwillbeissued6/83 2&3 39,20D11 2&3 MPL23-1,2 These items have been exempted from a 2&3 FI-23-82 qualification up-grade; see response 2&3 PS-23-68A,B,C,D to SER Item 4.2 9/3/81 submittal.
2&3 PS-23-84-1 2&3 PS-23-97A,B 2&3 PT-h952,h953 Review of the plant-specific emergency PT-5952,5953 procedures has shown that the pareeter monitored by these pressure transmi ters (ie, suppression pool pressure) is no' considered a Type A variable as definen by NRC Regulatory Guide 1 97, revision 2.
Therefore, these transmitters do not need to be replaced to meet the environmental qualification requirements of 1E Bulletin 79-013.
2&3 TE-2501-36A,B Unit 2 - Completion due by end of 10/83 TE-3501-36A,B.
Refueling Outage.
Unit 3 - Completion due by end of 10/8h Refueling Outage.
2&3 LT-02-3-720,D(old LT No.)
Unit 2 - Complete LT-02-3-1100,D(newLTNo.
Unit 3 - Completion due by end of 2/83 LT-02-3-73A,B(oldLTNo.))
Refueling outage. The old LT LT-02-3-111A,B, (new LT No.)
will remain in service for short term operation post accident, the new LT is for long term emergency procedure post l
accident operation.
I l
2&3 2-PT-6-105 Unit 2 - Completion due by end of 10/83 3-PT-6-105 Refueling outage.
Unit 3 - Completion due by end of 10/8h Refueling outage.
2&3 TE-24h2A,B Unit 2 - Completion due by end of 10/83 TE-3hh2A,B Refueling outage.
Unit 3
' Completion due by end of 2/83 Refueling outage.
2&3 P0AM-2-70A,B,P0AM Completc 71A,B,0,D,E,F,G,H,J,K,L.
-.m
1%M5sT~39WM7/
50-278 May 20, 1983
~
EQ MODIFICATION SCHEDULE (UONT)
PBEM UbIT EQUIPMENT IDENTIFICATION NUMBER EQ MODIFICATION STATUS 2&3 POT-2-71 A,B,C,D,E,F,G,H, Unit 2 - Completion due by end of 10/83 J,K,L,M Refueling outage.
Unit 3 - Complete by end of 2/83 Refueling outage.
2&3 RE-8103A,B,C,D Complete RE-9103A,B,C,D 2&3 PT-8102A,B,C,D Complete PT-9102A,B,C,D 2&3 SV-8101 Complete SV-9101 2 & 3' SV-8100 Complete SV-9100 A
e,
a