ML20071G889
| ML20071G889 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 05/13/1983 |
| From: | Miller D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| CSC-6704, NUDOCS 8305240427 | |
| Download: ML20071G889 (1) | |
Text
_..
L g)-399 l
g 3 30 i
{ggggggg JRINCIPAL STAFF 99A hl/)gF POW 8I 9/RA
/>CSJ W,a$
t CompBHy var no o
CPRP 0
n Midland Project: PO Box 1963, Midland MI 48640. (517) 631-8650
]E.
i l
May 13, 1983 Qt f/VMl I
OL FILE Mr. J. J. Harrison i
i ~' " ~
Midland Project Section U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 i
MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File: 0485.16 UFI: 42*05*22*04 Serial: CSC-6704 12*32
]
We have completed our review of the documents for the activities listed below.
Based on our review, we concluded that we are ready to start the work:
L SERVICE WATER PUMP STRUCTURE UNDERPINNING PROBRAM 207050748 - Probe for Deep Utilities Outside Elev. 610 Excavation Limits Ref. Dwg. C-2031 Information to be included in the deep probing logs is:
1.
Time of penetration per each five feet.
2.
If time exceeds thirty minutes per five feet, we will stop operation and evaluate before proceeding with the probing.
TRAIN A 0F SERVICE WATER PIPE REPLACEMENT 407050400 - Shallow Probing for Phase II Ref. Dwg. C-2031 402550500 - Excavate Existing Pipe i
402550510 - Remove Existing Pipe 402550520 - Install New Pipe and Expansion Coupling 402550515 - Hydro Test New Pipe 402550507 - Perform Profiling and Ovality Check on New Piping According to the NRC/CPCo Work Authorization Procedure, we request author-ization for the abov ctiv t es.
A Donald B. Miller Site Manager DBM/ DES / kin MAY 1 g 1983 0305240427 830513
_-[ y /
PDR ADOCK 05000329 A
.-.--.. -.-