ML20071G570
ML20071G570 | |
Person / Time | |
---|---|
Site: | Surry, North Anna ![]() |
Issue date: | 03/22/1979 |
From: | Flexner D JUSTICE, DEPT. OF, ATTORNEY GENERAL, OFFICE OF |
To: | Shapar H NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
Shared Package | |
ML18114A427 | List: |
References | |
NUDOCS 7904120189 | |
Download: ML20071G570 (2) | |
Similar Documents at Surry, North Anna | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08 Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC MONTHYEARML20245A0371989-03-20020 March 1989
[Table view]Forwards Final Exercise Rept for 880628,exercise of Offsite Radiological Emergency Preparedness Plans.No Deficiencies Identified But Several Areas Require Corrective Actions ML18152B2131988-09-14014 September 1988 Forwards Rept of 880628 Remedial Exercise for Plant.Rept Demonstrates Correction of Deficiency Re Delay on Part of Director of Operations & State Emergency Operations Ctr Staff During 871008 Exercise ML18153B4841988-07-14014 July 1988 Forwards Final Exercise Rept of 871008 Exercise of Offsite Radiological Emergency Preparedness Plans site-specific ML20235K5561987-09-0202 September 1987 Forwards, North Anna Power Station Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification, Confirming Adequacy of Applicable Criteria from Rev 1 to NUREG-0654/FEMA-REP-1 & FEMA-REP-10 ML20212B2611986-12-16016 December 1986 Forwards Exercise Rept for 860618 Exercise of Offsite Radiological Emergency Preparedness Plans.No Deficiencies Noted.Areas Requiring Corrective Action Noted in Rept.Plans Adequate ML20210D9611986-03-19019 March 1986 Forwards FEMA Region III Exercise Evaluation Rept, of 851004 full-participation Exercise of Offsite Radiological Emergency Preparedness Plans.Several Areas Requiring Corrective Actions & Improvement Noted ML20116K3951985-05-0101 May 1985 Forwards FEMA Region III Exercise Evaluation Rept of 841115 Exercise of Offsite Radiological Emergency Preparedness Plans.Corrective Actions Schedule Submitted by Commonwealth of VA Also Encl ML18141A6231984-05-23023 May 1984 Forwards Schedule of Corrective Actions Submitted by State of VA in Response to Deficiencies Cited by FEMA for 831001 full-scale Emergency Exercise.Corrective Actions Adequate ML20079E7271984-01-0909 January 1984 Forwards Exercise Rept of 830618 Joint Exercise of Offsite Radiological Emergency Preparedness Plans for Facilities ML20072M2431983-02-23023 February 1983 Approves State of VA & Local Emergency Plans,Subj to FEMA Verification of Adequacy of Alerting & Notification Sys,Per NUREG-0654,Rev 1.Plans Adequate to Protect Public Health & Safety ML18139A6151980-07-31031 July 1980 Discusses Review of Draft EIS for Steam Generator Repair. Radiation Dosage to Residents Near Plant & Proposed Method for Disposal of Liquid Effluents Should Be Addressed.Comment Classified as L0-2.Definition of Codes Encl ML19326D5741980-06-0606 June 1980 Forwards Hb Mcdonald Ltr Expressing Concerns Re Continued Operation of Facilities ML18139A2211980-05-0909 May 1980 Responds to NRC 800318 Ltr Requesting Comments on Des Re Steam Generator Repair.Des Is Lacking Location Map & Site Plan.Final Statement Should Describe Monitoring Program to Assure Acceptable Unrestricted Dose Levels ML18139A1891980-05-0101 May 1980 Comments on Des Per 800318 Request.Review Finds No Significant Impacts in Applicable Areas of Electrical Power, Natural Gas & Oil Pipeline Industries Nor Serious Conflicts W/Responsibilities Should Action Be Undertaken ML18017A1541980-04-28028 April 1980 Notifies That Draft Suppl to Des Re Proposed Const of Pond Hill Creek Storage Reservoir Adequately Addresses Probable Impacts to Highway Facilities.Requests Evidence of Coordination W/State of PA Dept of Transportation ML18139A1461980-04-0808 April 1980 Informs NRC That ERL-Narragansett Declines to Review Mar 1980 Des.Task Is Outside Area of Expertise ML18139A1511980-04-0808 April 1980 Comments on Des Re Steam Generator Repair.Proposed Recommended Action Has No Effect on Transportation Sys, Except in Event Transport of Hazardous Matl Is Required ML19290E6031980-01-25025 January 1980 Forwards White House 791203 Ltr Transmitting Jg Owens 791128 Ltr to President Carter Urging Decision Re Licensing of Facility.Requests Comment ML19320D0401980-01-21021 January 1980 Forwards Misdirected 791203 Ltr Re Licensing of New Nuclear Power Plants ML19309E2341980-01-14014 January 1980 Forwards,For NRC Response,L Brusso 791219 Ltr Requesting Approval of Facility for Operation ML19305D2091979-12-26026 December 1979 Forwards for NRC Response,Bm Scott Ltr to President Carter Expressing Concern Re Pressure Being Exerted by VA Govt Officials for Licensing of Facility ML19305D1411979-12-26026 December 1979 Forwards for NRC Response,North Anna Environ Coalition 791201 Ltr to President Carter Protesting Pressure Being Exerted by Governor Dalton & VA Atty Gen Coleman for Licensing of Facility ML19260D5011979-12-19019 December 1979 Forwards Hanover County (VA) Board of Supervisors 791128 Resolution Supporting Licensing of Facility.Requests Comments ML19211A6331979-11-23023 November 1979 Requests That NRC Expedite Licensing of Facility.Delay Results in Unjustifiable Financial Burden on Citizens of VA ML19248D2871979-07-12012 July 1979 Forwards FOIA Request from J Allen Re Investigation of Alleged Withholding of Info by VEPCO ML19261C7311979-03-22022 March 1979 Informs That Proposed Cooperative Interest of Nc Electric Membership Corp Is Less than 20 MW & That of Old Dominion Electric Cooperative Is Between 20 & 80 MW ML20071G5701979-03-22022 March 1979 Nc Electric'S Proposed Ownership Interest Would Be Less than 20 Mw/Unit & Old Dominion'S Proposed Interest Would Be 20 MW & 80 Mw/Unit.Unnecessary for Commission to Hold Antitrust Hearings ML19322B3131967-04-25025 April 1967 Submits List of Reactor Licensing Applications Currently Under Review by Environ Science Svc Administration,In Response to AEC 670418 Request 1989-03-20 |
Text
J.
h<&m M D.liuttb AI>tates Departmtnt of Justict
') /' WASHINGTON, D.C. 20530 DEPUTf 4W%fANT A f f D#NG v GI NI H As des I e f N s/S T De v 'it( A MAR 221978 boward K. Shapar, Esquire Executive Legal Director Nuclear Regulatory Commission Washington, D. C. 20555
- Re: Surry Power Station, Units 1 & 2 Virginia Electric & Power Company NRC Docket Nos. 50-280A & 50-281A, 9 and North Anna Power Station Virginia Electric & Power Company Units 1, 2, 3, & 4 NRC Docket Nos. 50-338A, 50-339A 50-404A & 50-405A
Dear Mr. Shapar:
You have requested our advice pursuant to Section 105(c) of the Atomic Energy Act of 1954, as amended, in connection with the purchase by North Carolina Electric Membership Corporation and Old Dominion Electric Coop-erative of an ownership interest in the above captioned nuclear units.
North Carolina Electric's proposed interest would lll be less than 20 MW per unit, and Old Dominion's proposed interest would be between 20 MW and 80 MW per unit. The participation of these two entities in the nuclear units is the culmination of discussions beginning in 1972. Our earlier recommendation that it was not necessary for the Commission to conduct a hearing on the application by Virginia Electric and Power Company to construct certain -
units at the two plants was based, in part, on these discussions. 1/
1/ This recommendation was cor.tained in a letter of August 1, 1972, with regard to units 3 and 4 at the North Anna Power Station and in a letter of November 14, 1973, with regard to units 3 and 4 at the Surry Power Station.
, s041z D /f 7
e 5
Our review of the information submitted ~in connection _-
with the present application, as well as other relevant information, has disclosed no evidence that the proposed ." -
participation by Old Dominion and North Carolina Electric in the North Anna and Surry Units would either create or maintain a situation inconsistent with the antitrust laws .
under section 105(c). We do not, therefore, believe it is :-
necessary for the Commission to hold an antitrust hearing --
on this matter. 2 Sincerely yours, S
Donald L. Flexner [t Deputy Assistant Attorney General (J Antitrust Division o %