ML20071G416

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to Security Plan.Rev Establishes Upper Limit of 120 Days on Interim Clearance,Per Varga .Rev Withheld (Ref 10CFR2.790)
ML20071G416
Person / Time
Site: Farley  
Issue date: 05/12/1983
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8305240191
Download: ML20071G416 (1)


Text

'

Mailing Address

=

f,l:b:ma Power Company 600 North 18th Street Post Offics Box 2611 0,09,"'";d%=eitf*E nac non.-n k

n A d a ri t a C+.

F. L Clayton, Jr.

L Senior Vice Fresident AlabamaPower Flintridge Building fQ lQ h h l l the southern electre system May 12, 1983 Docket No. 50-348 Docket No. 50-364 Mr. James P. O'Reilly, Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W. Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Enclosed is a copy of Revision 6 to the Joseph M. Farley Nuclear Plant Security Plan. Revision 6 incorporates changes to paregraph 1.3.1.3 as suggested in Mr. Varga's letter to me dated January 5, 1983. This change establishes an upper limit of 120 days on interim clearance. This change has been made in accordance with 10CFR50.54(p) and this submittal constitutes the required report. Yours very truly, ff & F. L. Clayton, Jr. FLCJr/JGS:cb Enclosure xc: Mr. S. A. Varga w/ enclosure Mr. R. A. Thomas ENCLOSURE CONTAINS % Mr. G. F. Trowbridge SAFEGUARDS INFORMATION. Mr. E. A. Reeves Mr. W. H. Bradford UPON SEPARATION THIS PAGE IS DECONTROLLEO. File A-15.1 ,.. k [t 8305240191 830512 [O hDRADOCK 05000348 PDR g fg f I}}