Monthly Operating Rept for Jan 1983
ML20071F311
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 02/04/1983
From: Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML20071F305 List:
References
NUDOCS 8303150487
Download: ML20071F311 (4)


Text

I AVERAGE DAILY UNIT POWER LEVEL

, ie D l

(/) ...

5 DOCKET NO. 90-1R7 L- m% UNIT One

@ DATE February 4,1983 I O L.A. Kuczynski Delc ST COMPLETED BY TELEPHONE f717)542-2181 MON 111 January, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER .',EVEL (MWe-Net) (MWe-Net) 1 707 17 710 2 705 gg 746 3 804 39 398 4 786 20 0 5

767 0 21 6 22 449 7 0 23 795 -

8 0 929 24 9

139 184 25 10 462 26 134 II 718 27 217 12 688 362 28 13 29 14 500 30 666 15 704 33 782 16 759 INSTRUC110NS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8303150487 830214 PDR ADOCK 05000387 R PDR

,. D h D

\

.m ,\l v

m / J. _ _ _l ( 3 l t PL L IIIHFt J OPERATING DATA REPORT O DOCKET NO. 50-197 l DATE 2-4-83 1 Q

Dl? {C [ M COMPLETED BY L.A.Kuczynski TELEPHONE (7171542-2181 1 OPERATING STATUS Unit One Notes

1. Unit NameSu scTueha nn a Stnam Flocevic ca ,*4mn
2. Reporting Period: Tn e n ry 10A7
3. Licensed Thermal Power (MWt): 1293
4. Namepiate Rating (Gross MWe): 1286 x 0.9 = 1052
5. Design Electrical Rating (Net MWe): 1052 - 41 = 1011
6. Maximum Dependable Capacity (Gross MWe): *

' Maximum Dependable Capacity (Net MWe):

  • MDC to be determined.
8. If Changes Occur in Capacity Ratings (Items Number 3 Th ough 7) Since last Report, Give Reasons:
9. Power Level To which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr..to.Date Cumulative i1. Hours In Reporting Period 744 744 1936.5

12. Number Of Hours Reactor Was Critical 645.9 645.9 1575.9
13. Reactor Reserve Shutdown Hours 52 .3 51.3 115.9
14. Hours Generator On-Line 581.1 581.1 _ 1433.7
15. Unit Reserve Shutdown Hours 0 0 n
16. Gross Thermal Energy Generated (MWH) 1,168,883 1,168.883 2.326.440
17. Gross Electrical Energy Generated (MWH) 386,130 386,130 730,550
18. Net Electrical Energy Generated (MWH) 364,867 364,867 6'86.172
19. Unit Service Factor N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Net) M/^
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 9-7-R2 4-1n-82 INITIA L ELECTRICITY 11-19-82 11-16-82 COMMERCIAL OPERATION 5-19-R3 (4/77)

4AANN4

.; r@f h  :

DOCKET NO. 90-?R7

  • L UNIT SHUTDOWNS AND POWER REDUCTIONS Prat d UNIT NAME nno DATE 2-4-Rt

$@ NIC N[ REPORT MONm January,1983 COMPLETED BY TELEPHONE T. A m - vncki f717)542-2181 w.

- B E No. Date g

.! E 3g 3;; }Ih

,35 Licensee Event

,Ev, u?

gn, o-Cause & Corrective Action to H

$= $ j di g Report # NU j'? Prevent Recurrence 5

1 830106 S 80.9 B 3 N/A ZZ ZZZZZZ As part of scheduled startup testing the main turbine was mat t-ually tripped, causing a reactor scram.

2 830113 S 0 B 4 N/A CB PUMPXX Power reduction was caused by startup testing in the reactor recirculation system.

3 830119 F 57.6 A 3 N/A IA ISNTRU Spurious actuation of Reactor Prot ection System.

4 830125 F 24.4 A 3 N/A IA INSTRU Reactor trip on turbine stop valve closure (one trip system) and APRM Flow Biased Thermal Power (one trip system) resultilig from position switch problems encountered in turbine stop valve closure testing. A recirculation pump trip also occurred.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event ReporI (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source (9/77) 11-0ther (Explain)

.- -[

i SUSQUEHANNA STEAM-ELECTRIC STATION Docket Number 50-387- Date 2-4-83 Completed By: L.A. Kuczynski- Telephone.(717)S42-2181 January, 1983 Challanges to Main Steam Safety Relief Valves None.

Cha'nges to Offsite Dose Calculation Manual None.