ML20071F279
Jump to navigation
Jump to search
| ML20071F279 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/09/1983 |
| From: | Nix H GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20071F282 | List: |
| References | |
| GM-83-254, NUDOCS 8303150478 | |
| Download: ML20071F279 (1) | |
Text
. _..
'^
~
Georgia Power Comp ny Post offico B:x 439 B xl:y, Georgia 31513 Telephone 912 367 7181 912 537-9444 Edwin I, Hatch Nuclear Plant March 9, 1983 i
G4-83-254 PLANT E.
I.
HATCH NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
1 Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Tx>cket #50-321, and for Hatch Unit 2, Docket #50-366.
4
)&M l
"H.
C. Nix
/
/
General Mana'ger
+
Ajo/hh HLS 1
.I 8303150478 830309 PDR ADOCK 05000321 R
..