Forwards Status of Licensing Items Requiring NRC Approval in 1983,identified in Util & Summary of Proposed Actions to Be Taken on Listed Items W/No Submittal or Requested Approval Dates.Status Provided on Monthly Basis
ML20071D726
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/04/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8303140558
Download: ML20071D726 (7)


Text

r Mailing Address Alabims Powsr Company 600 North 18th Street Post Offics Box 2641 s

Birminghsm. Allbama 35291 Telephone 205 7t.3-6081 F. L Clayton, Jr.

Ed' C'Q'"'

Alabama Power g

the southem dectnc system March 4, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requesting NRC Approval in 1983 Gentlemen:

Attached ( Attachment 1) for your information is a status of all licensing items identified in Alabama Power Company's letter dated January 13, 1983.

This status is being provided on a monthly basis and will be updated to include any additional submittals requesting NRC approval.

i Included as Attachment 2 is a summary of the proposed actions to be taken on items identified in the January 13, 1983 letter with no submittal or requested approval dates.

In accordance with Attachment 2, all items identified in Attachment I now have proposed APCo submittal and requested NRC approval dates to facilitate NRC manpower scheduling.

If you have any questions, please advise.

Yours very truly, td 7 7*L. Cl ayton, J r.

l i

FLCJr/GGY:lsh-D39 Attachments cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford 8303140558 830304

<a A

f fOht f

PDR ADOCK 05000348 P

PDR

ATTADMNT 1 PNE 1 STATUS T LIGEltG ITB6 REI)RRIIE IRC APPROVAL IN 19 0 MM014,190 PIDOSED APCo ACML AF00 REIJESTED IRC

. ACTUAL NtC ITEM SBtITTAL MTE SIMITTAL m1E APPRDWAL MIE

  1. PI G AL MTE
1. Movable Control Rod Assenblies 02-22-83 03-04-83 09-01-83 for FtP 1 and 2 (T.S. 3/4.1.3)
2. Charcoal Filters for FNP 1 and 2 03-01-83 03-04-83 09-01-83 (T.S.4.7.7,4.7.8and4.9.14)
3. River Water Systen for FfP 1 and 2 N/A 12-30-82 07-01-83 (T.S.3/4.7.5) 4.

Diesel &nerator Overload Test for N/A 08-03-82 07-01-83 FTP 1 and 2 (T.S. 4.8.1.1.2.c.5) 12-30-82

5. BIT Reduction for FrP 1 and 2 N/A 12-30-82 03-31-83 (T.S.3/4.5.4)
6. Turbine Valve Surveillance for FNP 2 N/A 10-08-82 12-01-82 tRC letter (T.S.3/4.3.4) 12-10-82 of 12-30-82 01-18-83 stated that review will take one year. APCo is schedul-ing an appeal m.eting with the tRC.
7. RCS Pressure Isolation Valves N/A 08-10-82 07-01-83 for FTP 1 and 2 (T.S. 3/4.4.7.2 12-23-82 and3/4.4.7.3)
8. tbchanical Snubber Functional Test N/A 11-05-82 12-01-82 01-31-83 Exenption for FtP 1 (T.S.4.7.9.e)
9. Waste e s Hydrogen /0xygen Analyzer 06-01-83 12-01-83 for FtP 1 and 2 (T.S. Table 4.3-9)
10. ISI/IST Licensin9 Program
a. Unit 1 Inservice Inspection (ISI)

Program for ASK Code Class 1,2 and 3 Caponents

1. Relief Requests m vessel N/A 04-17-81 09-01-83 cladding examinations 01-10-83
2. Relief Requests m hydro-01-18-83 01-28-83 09-01-83 static test mquiremnts l

r-1

~

6 AIT.sO9ENT 1 P/E 2 STA1US T LICD6IE IT96 RE4JIRI!E lac APPRavM. IN 19 0 MM014,1983 PR[FOSED #Co ACRR. AP00 RESESTED IRC EIUAL MC ITDt SBtITTE MTE SBtITTE MTE APPIN E MTE

  1. PROVE MTE
b. Unit 2 Inservice Inspection (ISI) Progran for A9E Code Class 1,2 and 3 Caponents
1. Revision 0 Relief Requests N/A 07-25-80 09-01-83
2. Relief Requests on vessel N/A 01-10-83 09-01-83 cladding examinations
3. Relief Request on lydrostatic 01-18-83 01-28-83 09-01-83 test requirenents
c. Unit 1 Inservice Testing (IST)

Progran for /NSE Code Class 1, 2 and 3 Caponents

1. Revision 2 Relief Requests N/A 04-21-80 03-15-83
2. Revision 3 Relief Requests N/A 07-16-81 03-15-83
3. Revisim 4 Relief Requests N/A 10-25-82 03-15-83 d.

Unit 2 Inservice Testing (IST)

Program for ASK Code Class 1, 2 and 3 Caponents

1. Revision 0 Relief Requests N/A 03-12-80 02-15-83 OVER[1JE
2. Revision 1 Relief Requests N/A 03-17-82 02-15-83 OVERDUE
3. Revision 2 Relief Requests N/A 08-06-82 02-15-83 OVEROUE
11. Spent Fuel Pool Storage Additions N/A 03-19-82 11-01-82 for FNP 1 04-01-83 (revised need date)
12. Chancy 18 Month Interval to Refueling 04-01-83 10-01-83
13. Nteorological Tower Surveillance for 02-01-83 01-24-83 08-01-83 FNP 1 and 2 (T.S. 3/4.3.3.4)
14. In-Core Thinbles for FNP 1 and 2 N/A#

N/A N/A#

N/A (T.S.3.3.3.2)

  1. See Attactrent 2

I.

ATip0MNT 1 PAGE 3 STATUS & LICENSIE IT96 REI)JIRIfG NIC APP O fAL IN 19 E MNIO{ 4,190 PR(POSED # Co ACTUAL #00 ilEIRESTED NIC ACTUAL NIC ITEM SNMITTAL MTE SNMITTAL MIE APPINAL mlE

  1. PI S AL MIE
15. Safety Evaluations for Next Fuel Reloads:
a. Unit 1 Upflow Mooification N/A 08-16-82 N/A N/A
b. Unit 1 Cycle 5 03-14-83 N/A N/A
c. Unit 2 Cycle 318 Month Fuel 09-01-83 N/A N/A Cycle
16. F H and Positive Moderator To per-09-01-83#

03-01-84#

ature Coefficient

17. Containcent Spray 04-01-83 10-01-83
18. Technical Specification Optimization N/A N/A N/A N/A Westinghouse Owners Group
19. Safety Related Battery Changes 04-15-83 10-15-83
20. Rod Swap Test [ bring Low Power 03-01-83 03-01-83#

N/A#

N/A Physics Testing

21. Rod Ihp Timing During Low Power N/A#

N/A N/A#

N/A Physics Testing

22. Auto Rod Control Above 90% Power fyA 01-11-83(U-1) 04-01-83 Being for Unit 2, Cycle 2 and Unit 1, 09-14-82(U-2) 12-01-82 reviewed Cycle 5 generically by tPC.
23. Unit 2 Licensing Deletion Anendier.t 01-12-83 01-07-83 N/A N/A Clarification Letter
24. FSAR Update 07-01-83 N/A N/A
25. Adninistrative Changes a.

Acctrulator and ECCS Subsysten 02-01-83 02-01-83 09-01-83 for FfP 1 and 2 (T.S. 4.5.1.1 (c)and4.5.2.(a))

b.

Generic Letter 82-17 on Audit of N/A 10-25-82 09-01-83 Emergency Plan for FfP 1 and 2 (T.S.6.5.2.8.e)

c. ik.hanical and Hydraulic Snubber 06-01-83 09-01-83 Lists for FfP 1 and Hydraulic Snubber List for FfP 2 (T.S.

Table 3.7-46)

  1. See Attactinent 2

m ATTA090T 1 PAE 4 stall!S & LICDtSIlG ITD6 REI)JIRIIG PRC APFWNAL IN 190 MROI 4,1983 l

P 9 0 SED AFCb AC M L AF00 REIESTED IRC ACRIAL MC IHM SUBGTTAL MIE SUMITTAL m1E # PROVAL MTE

  1. FRDWAL MTE
25. Mninistrative Changes (cont.)
d. Mninistrative Changes for FfP 03-01-83 02-01-83 09-01-83 1 and 2:
1) Fire Detectors Table 3.3-12
2) Rm Isolatim 4.5.2.d.1
3) River Water Surv 3/4.7.5*
4) Yard Fire liydrant Table 3.7-7
5) Service Water Battery 4.8.2.5.2(d)
6) Organization Chart Figure 6.2-2
  • N/A per iten 3 submittal e.

Unit 2 Pressurizer Sensor Table 03-01-83 02-01-83 09-01-83 (T.S.3.3.3.7)

f. Unit 1 Refueling Outage Change:

03-01-83 02-01-83 09-01-83 Contaiment Vent g.

Turbine Building liydraulic N/A 12-10-82 09-10-83 Snubbers for FtP 2 h.

Incorporatim of Licensing N/A 11-24-82 09-01-83 Requirenents for FrP 2

1) FNP 2 License Condition 2.C.(17) - Containment Vent Line
2) Mechanical Snubber List for FtP 2 (T.S. Table 3.7-4b)
3) FtP 2 License Condition 2.C.(19)(b) - Contaiment Overcurrent Protection
1. Organization Change to Offsite N/A 11-16-82 09-01-83 l

Managaient for FfP 1 and 2.

l l

m ATTA090 R 1 PAGE 5 STA1US & LICD611G ITEMS EI)JIRIfG IEC APPRWE IN 1983 MARCH 4,1983 OTifR LICDtSIPU SIMITTALS PR@0 SED MCo EIUAL JFCo EQESTED NC EIUAL NO ITEM SEMITTAL MTE SIMITTAL MTE #PRNR MTE

  1. PRWAL MlE
1. Akinistrative Changes N/A 02-01-83 09-01-83
a. Engineered Safety Actuation System Instnrentation ETION Statetent 20 Error
b. Security Plan Audit Frequency
c. Envirormental Qualification (RP 1)
d. Axpented Low Pmer Test Program (RP 2) l

l ATTACHMENT 2 STATUS OF LICENSING ITEMS PREVIOUSLY IDENTIFIED

  • BUT NOT PREVIOUSLY SCHEDULED PROPOSED APC0 REQUESTED NRC ITEM SUBMITTAL DATE APPROVAL DATE COMMENTS 14.# In-Core Thimbles for FNP N/A N/A This item is the subject of on-going study and is not 1 and 2 (T.S. 3.3.3.2) scheduled to result in a submittal to the NRC in 1983.

16.# FALH and Positive Moderator 09-01-83 03-01-84 This item is now scheduled for submittal as a proposed Temperature Coefficient technical specification change by 09-01-83.

20.# Rod Swap Test During Low C3-01-83 N/A A letter was sent to the NRC on 03-01-83 documenting Power Physics Testing ACPo's intent to begin using the new rod swap meth-odology. This change is being made in accordance with 10 CFR 50.59; therefore, NRC approval is not required.

21.# Rod Drop Test N/A N/A This item is the subject of on-going study and is not scheduled to result in a submittal to the NRC in 1983.

  • Identified in APCo letters dated January 13, 1983 and February 1,1983
  1. Item identification numbers consistent with Attachment 1