ML20071D653

From kanterella
Jump to navigation Jump to search
Informs That Due to Evaluation Problems,Submittal of Final Rept Re Unverified Computer Code for Main Feedwater Pipe Supports Will Be Delayed from 830228 to 830422
ML20071D653
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/28/1983
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-218, NUDOCS 8303140544
Download: ML20071D653 (1)


Text

Georgia Power Company Post Office Box 4545 Atlanta, Georpa 30302 e 404 =5= Vogtle Project February 28, 1983 United States Nuclear Regulatory Commission Office of Inspection and Enforcement cc Region II - Suite 3100 101 tiarietta Street File: X7BG03-M34 2 W r_

~u Atlanta, Georgia 30303 Log: GN-218 $ py

.n. Ho

Reference:

Vogtle Electric Generating Plant - Units 1 and 2 h

.y 50-424; 50-425; Main Feedwater Pipe Supports, m cm Unverified Computer Code -

ri E<

.. p Attention: Mr. James P. O'Reilly ca d'"

Gentlemen:

In our previous letter concerning the above referenced subject, -

Georgia Power Company indicated that the NRC could expect to be notified of the results of the evaluation and its conclusions by February 28, 1983.

Based upon problems experienced in completing the evaluation, Georgia Power Company will not be able to provide this final report on the above schedule. A final report is now scheduled for submittal on April 22, 1983.

This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.

Yours truly,

!D. O Foster CWH/D0F/tlp xc: U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 R. J. sally 0. Batum R. E. Conway H. H. Gregory, III G. F. Head E. D. Groover J. T. Beckham, Jr. L. T. Gucwa J. H. Boykin M. Malcom D. E. Dutton M. Manry R. H. Pinson P. D. Rice D. L. McCrary J. L. Vota R. A. Thomas W. F. Sanders J. A. Bailey

,ili..,.,c.?d- W-e

^,._.-

8303140544 830228 PDRADOCK05000g g